← Paul Test
doc12402 1129.pdf_v_d03242026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
31 item(s)
JSON
figure (4)
footer (1)
footnote (2)
header (1)
heading (1)
table (1)
table_cell (11)
text (10)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TEXT
6 · TABLE
7
8
9
10
11
12
13
14
15
16
17
18 · TEXT
19 · TEXT
20 · TEXT
21 · FIGURE
22 · HEADING
23 · TEXT
24 · TEXT
25 · TEXT
26 · TEXT
27 · TEXT
28 · TEXT
29 · FOOTNOTE
30 · FOOTNOTE
31 · FOOTER
Page 1 JSON
{
"document_id": 12402,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 12513,
"item_count": 31,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 2,
"header": 1,
"heading": 1,
"table": 1,
"table_cell": 11,
"text": 10
},
"build_ms": 3,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.24,
"r": 117.6,
"b": 726.48
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 126.96,
"t": 760.56,
"r": 321.36,
"b": 727.92
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.16,
"b": 716.88
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "text",
"bbox": {
"l": 26.88,
"t": 705.6,
"r": 551.76,
"b": 671.04
},
"text": "Gandy Boulevard (SR 694) from west of 94th Street to Derby Lane Lighting Retrofit in Pinellas County 254677-6-22"
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 659.52,
"r": 216.96,
"b": 402.96
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 6,
"n_cols": 2,
"integrity": {
"cells_checked": 11,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 639.35,
"r": 93.821,
"b": 626.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 639.35,
"r": 200.449,
"b": 613.505
},
"text": "Safety Improvements",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 607.1,
"r": 105.6785,
"b": 574.505
},
"text": "Phase\nProject Start",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 607.1,
"r": 198.68275,
"b": 561.755
},
"text": "Completed\nDecember 16, 2026",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 555.35,
"r": 105.971,
"b": 471.005
},
"text": "City\nCounty\nRoad\nConstruction Cost",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 555.35,
"r": 190.414,
"b": 483.755
},
"text": "Tampa\nHillsborough\nSR 60\n$466,000",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 464.6,
"r": 97.81475,
"b": 438.755
},
"text": "Estimated Completion",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 464.6,
"r": 188.49025,
"b": 451.505
},
"text": "Spring 2026",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.10",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 432.35,
"r": 93.87725,
"b": 419.255
},
"text": "Contractor",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.11",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 432.35,
"r": 210.99025,
"b": 419.255
},
"text": "Cone & Graham, Inc.",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 18,
"type": "text",
"bbox": {
"l": 31.44,
"t": 392.4,
"r": 142.08,
"b": 378.24
},
"text": "Contact Information"
},
{
"id": "p1.8",
"order": 19,
"type": "text",
"bbox": {
"l": 32.88,
"t": 373.2,
"r": 200.4,
"b": 320.88
},
"text": "Project Information\nMaddie Griffin\n727-575-8334\nMaddie.Griffin@dot.state.fl.us"
},
{
"id": "p1.9",
"order": 20,
"type": "text",
"bbox": {
"l": 33.36,
"t": 313.44,
"r": 183.6,
"b": 263.76
},
"text": "Media Contact\nKayla Mejia\n813-975-6060\nKayla.Mejia@dot.state.fl.us"
},
{
"id": "p1.10",
"order": 21,
"type": "figure",
"bbox": {
"l": 222.24,
"t": 662.88,
"r": 583.44,
"b": 519.12
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.11",
"order": 22,
"type": "heading",
"bbox": {
"l": 224.88,
"t": 507.6,
"r": 260.64,
"b": 493.44
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.12",
"order": 23,
"type": "text",
"bbox": {
"l": 224.4,
"t": 487.68,
"r": 566.64,
"b": 460.8
},
"text": "As of March 23, 2026, all construction activities associated with this project have been completed."
},
{
"id": "p1.13",
"order": 24,
"type": "text",
"bbox": {
"l": 224.64,
"t": 452.88,
"r": 578.16,
"b": 400.08
},
"text": "The Florida Department of Transportation's Design-Build firm, Cone & Graham, Inc., is making roadway lighting improvements to SR 694 (Gandy Boulevard) (Causeway Boulevard) from west of 94th Street to Derby Lane in Pinellas County."
},
{
"id": "p1.14",
"order": 25,
"type": "text",
"bbox": {
"l": 224.4,
"t": 391.44,
"r": 566.88,
"b": 366
},
"text": "Safety improvements include retrofitting existing roadway lighting fixtures with LED luminaires."
},
{
"id": "p1.15",
"order": 26,
"type": "text",
"bbox": {
"l": 225.6,
"t": 358.56,
"r": 564.24,
"b": 344.16
},
"text": "Construction activities are expected to be complete in early 2027."
},
{
"id": "p1.16",
"order": 27,
"type": "text",
"bbox": {
"l": 225.12,
"t": 337.2,
"r": 577.44,
"b": 315.12
},
"text": "*****\n*****"
},
{
"id": "p1.17",
"order": 28,
"type": "text",
"bbox": {
"l": 224.64,
"t": 302.4,
"r": 576.96,
"b": 210.96
},
"text": "What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously."
},
{
"id": "p1.18",
"order": 29,
"type": "footnote",
"bbox": {
"l": 502.08,
"t": 533.52,
"r": 582.72,
"b": 520.56
},
"text": "Arrowhead Park",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.19",
"order": 30,
"type": "footnote",
"bbox": {
"l": 225.36,
"t": 532.8,
"r": 263.28,
"b": 520.32
},
"text": "Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.20",
"order": 31,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.16,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 03/24/2026",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}