← Paul Test
doc12351 444_v_09182026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
20 item(s)
JSON
figure (3)
heading (2)
table (2)
table_cell (11)
text (2)
1 · FIGURE
2 · FIGURE
3 · HEADING
4 · TABLE
5
6
7
8
9
10
11
12 · TABLE
13
14
15
16
17 · FIGURE
18
19 · HEADING
20 · TEXT
Table integrity:
1 of 4 cells don't match the text layer at their coordinates.
r2c0 (0%): “Sandra.Mancil@dot.state.fl.us”
Page 1 JSON
{
"document_id": 12351,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 12462,
"item_count": 20,
"counts_by_type": {
"figure": 3,
"heading": 2,
"table": 2,
"table_cell": 11,
"text": 2
},
"build_ms": 2,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 25.44,
"t": 768,
"r": 358.32,
"b": 719.04
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768,
"r": 128.88,
"b": 720.48
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.3",
"order": 3,
"type": "heading",
"bbox": {
"l": 26.16,
"t": 697.68,
"r": 282.72,
"b": 681.84
},
"text": "US 98 at Lyle Parkway Intersection 453810-1",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.4",
"order": 4,
"type": "table",
"bbox": {
"l": 28.08,
"t": 673.44,
"r": 216.72,
"b": 448.08
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 4,
"n_cols": 2,
"integrity": {
"cells_checked": 7,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.4.1",
"order": 5,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 670.043,
"r": 111.086,
"b": 656.075
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.4.2",
"order": 6,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 650.02,
"r": 93.821,
"b": 636.925
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.4.3",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 122.4,
"t": 648.4,
"r": 216.72,
"b": 623.36
},
"text": "New Traffic Signal",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1
}
},
{
"id": "p1.4.4",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 617.77,
"r": 67.64225,
"b": 585.175
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.4.5",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 617.77,
"r": 199.8865,
"b": 559.675
},
"text": "Construction\nat the intersection of Lyle Parkway",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.4.6",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 553.27,
"r": 105.6785,
"b": 449.425
},
"text": "Project Start\nCity\nCounty\nRoad\nEstimated Completion",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.4.7",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 553.27,
"r": 181.38025,
"b": 462.175
},
"text": "Late 2025\nBartow\nPolk\nUS 98\nEarly 2027",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.5",
"order": 12,
"type": "table",
"bbox": {
"l": 28.8,
"t": 435.6,
"r": 214.32,
"b": 362.64
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 3,
"n_cols": 2,
"integrity": {
"cells_checked": 4,
"cells_flagged": 1,
"flags": [
{
"row": 2,
"col": 0,
"coverage": 0,
"text": "Sandra.Mancil@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.5.1",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 435.119,
"r": 162.20975,
"b": 402.001
},
"text": "Contact Information\nCommunications Team",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.2",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 36.596,
"t": 402.346,
"r": 108.1685,
"b": 389.251
},
"text": "Sandra Mancil",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.3",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 36.596,
"t": 389.596,
"r": 108.2585,
"b": 376.501
},
"text": "863-519-4116",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.4",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 28.8,
"t": 380.88,
"r": 214.32,
"b": 362.64
},
"text": "Sandra.Mancil@dot.state.fl.us",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2
}
}
]
},
{
"id": "p1.6",
"order": 17,
"type": "figure",
"bbox": {
"l": 223.2,
"t": 673.92,
"r": 583.68,
"b": 529.44
},
"text": "",
"attrs": {
"block_label": "image"
},
"children": [
{
"id": "p1.6.1",
"order": 18,
"type": "text",
"bbox": {
"l": 527.04,
"t": 539.04,
"r": 582.96,
"b": 530.16
},
"text": "Map data ©2025"
}
]
},
{
"id": "p1.7",
"order": 19,
"type": "heading",
"bbox": {
"l": 224.64,
"t": 519.36,
"r": 262.56,
"b": 504.24
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.8",
"order": 20,
"type": "text",
"bbox": {
"l": 224.88,
"t": 500.88,
"r": 580.08,
"b": 321.36
},
"text": "A Florida Department of Transportation (FDOT) to install a new traffic signal on US 98 at Lyle Parkway begins in early October 2025. The signal project also includes drainage improvements, widening the turn radius at the northwest and southeast corners, adding a raised concrete pedestrian pad on the northwest corner and adding intersection lighting with high visibility crosswalk striping and pedestrian signals.\nThe project goes with another project to resurface US 98 from Bartow to Lakeland (452617-1). This much needed project includes removing the old asphalt, replacing it with new asphalt, repaving the side street aprons and installing new signal sensors at the signalized intersections. Motorists can expect nighttime/overnight lane closures between 6:30 p.m. and 5:30 a.m.",
"attrs": {
"block_label": "abstract"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}