← Paul Test
doc12040 303_v_10292026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
20 item(s)
JSON
figure (3)
footnote (1)
header (1)
heading (2)
table (1)
table_cell (10)
text (2)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · HEADING
5 · TABLE
6
7
8
9
10
11
12
13
14
15
16 · FIGURE
17 · HEADING
18 · TEXT
19 · TEXT
20 · FOOTNOTE
Table integrity:
1 of 10 cells don't match the text layer at their coordinates.
r6c0 (50%): “Communications Team Brian Bollas 813-262-8549 brian.bollas@…”
Page 1 JSON
{
"document_id": 12040,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 12151,
"item_count": 20,
"counts_by_type": {
"figure": 3,
"footnote": 1,
"header": 1,
"heading": 2,
"table": 1,
"table_cell": 10,
"text": 2
},
"build_ms": 4,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.24,
"r": 128.88,
"b": 720.24
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 138.48,
"t": 761.04,
"r": 357.36,
"b": 722.64
},
"text": "Southwest Florida\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 583.653,
"b": 705.521
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "heading",
"bbox": {
"l": 27.36,
"t": 697.68,
"r": 384.24,
"b": 681.6
},
"text": "I-75 at Daniels Parkway Interchange Improvements 446296-2",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.5",
"order": 5,
"type": "table",
"bbox": {
"l": 28.32,
"t": 670.043,
"r": 218.16,
"b": 143.52
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 7,
"n_cols": 2,
"integrity": {
"cells_checked": 10,
"cells_flagged": 1,
"flags": [
{
"row": 6,
"col": 0,
"coverage": 0.5,
"text": "Communications Team Brian Bollas 813-262-8549 brian.bollas@…"
}
]
}
},
"children": [
{
"id": "p1.5.1",
"order": 6,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 670.043,
"r": 111.086,
"b": 656.075
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.5.2",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 650.02,
"r": 93.821,
"b": 636.925
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.3",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 650.02,
"r": 191.314,
"b": 624.175
},
"text": "Interchange Construction",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.4",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 617.77,
"r": 67.64225,
"b": 585.175
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.5",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 617.77,
"r": 210.4165,
"b": 457.675
},
"text": "Construction\nI-75 (S.R. 93) just north and south of Daniels Parkway (C.R. 876) and Daniels Parkway from east of Danport Boulevard to west of Treeline Avenue",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.6",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 451.27,
"r": 105.971,
"b": 366.925
},
"text": "City\nCounty\nRoad\nConstruction Cost",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.7",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 451.27,
"r": 191.629,
"b": 366.925
},
"text": "Fort Myers\nLee\nI-75\n$42.8 Million (Approx.)",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.8",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 352.619,
"r": 203.58725,
"b": 261.751
},
"text": "Contact Information\nCommunications Team FDOT-D1COMM\nConstruction Project Manager Jesten Abraham (863) 519-2889 Jesten.Abraham@dot.state.fl.us",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.9",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 229.846,
"r": 162.20975,
"b": 184.50099999999998
},
"text": "Communications Team Michaela Zawodny Michaela.Zawodny@dot.state.fl.us",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.5.10",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 28.32,
"t": 183.7477,
"r": 218.16,
"b": 143.52
},
"text": "Communications Team Brian Bollas 813-262-8549 brian.bollas@dot.state.fl.us",
"attrs": {
"row": 6,
"col": 0,
"rowspan": 1,
"colspan": 2
}
}
]
},
{
"id": "p1.6",
"order": 16,
"type": "figure",
"bbox": {
"l": 222.24,
"t": 673.92,
"r": 583.92,
"b": 529.44
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.7",
"order": 17,
"type": "heading",
"bbox": {
"l": 225.12,
"t": 518.64,
"r": 261.84,
"b": 504.24
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.8",
"order": 18,
"type": "text",
"bbox": {
"l": 223.92,
"t": 499.2,
"r": 559.92,
"b": 432.24
},
"text": "The purpose of this design project is to address the existing operational deficiencies of I-75 and Daniels Parkway Interchange within Lee County and to accommodate future travel demand projections because of forecasted population and employment growth."
},
{
"id": "p1.9",
"order": 19,
"type": "text",
"bbox": {
"l": 224.16,
"t": 426.24,
"r": 581.28,
"b": 333.84
},
"text": "The interchange improvements include Improvements include reconstruction of the Daniels Parkway Interchange (Exit 131) converting it to a Diverging Diamond Interchange (DDI) design, reconstruction of the I-75 ramps, construction of pedestrian and bicycle accommodations through the interchange, installation of new signals at the ramps, and resurfacing of Daniels Parkway through the project area."
},
{
"id": "p1.10",
"order": 20,
"type": "footnote",
"bbox": {
"l": 527.04,
"t": 539.04,
"r": 582.48,
"b": 530.16
},
"text": "Map data ©2024",
"attrs": {
"block_label": "vision_footnote"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}