← Paul Test

doc12040 303_v_10292026.pdf

⬇ Export JSON

Badge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.

Page 1

20 item(s) JSON
figure (3) footnote (1) header (1) heading (2) table (1) table_cell (10) text (2)
Page 1
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · HEADING
5 · TABLE
6
7
8
9
10
11
12
13
14
15
16 · FIGURE
17 · HEADING
18 · TEXT
19 · TEXT
20 · FOOTNOTE
Table integrity: 1 of 10 cells don't match the text layer at their coordinates.
r6c0 (50%): “Communications Team Brian Bollas 813-262-8549 brian.bollas@…”
Page 1 JSON
{
    "document_id": 12040,
    "page": 1,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 12151,
    "item_count": 20,
    "counts_by_type": {
        "figure": 3,
        "footnote": 1,
        "header": 1,
        "heading": 2,
        "table": 1,
        "table_cell": 10,
        "text": 2
    },
    "build_ms": 4,
    "items": [
        {
            "id": "p1.1",
            "order": 1,
            "type": "figure",
            "bbox": {
                "l": 29.04,
                "t": 768.24,
                "r": 128.88,
                "b": 720.24
            },
            "text": "",
            "attrs": {
                "role": "page_header",
                "block_label": "header_image"
            }
        },
        {
            "id": "p1.2",
            "order": 2,
            "type": "header",
            "bbox": {
                "l": 138.48,
                "t": 761.04,
                "r": 357.36,
                "b": 722.64
            },
            "text": "Southwest Florida\nFlorida Department of Transportation",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p1.3",
            "order": 3,
            "type": "figure",
            "bbox": {
                "l": 28.346,
                "t": 772.158,
                "r": 583.653,
                "b": 705.521
            },
            "text": "",
            "attrs": {
                "source": "pdf_image"
            }
        },
        {
            "id": "p1.4",
            "order": 4,
            "type": "heading",
            "bbox": {
                "l": 27.36,
                "t": 697.68,
                "r": 384.24,
                "b": 681.6
            },
            "text": "I-75 at Daniels Parkway Interchange Improvements 446296-2",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p1.5",
            "order": 5,
            "type": "table",
            "bbox": {
                "l": 28.32,
                "t": 670.043,
                "r": 218.16,
                "b": 143.52
            },
            "text": "",
            "attrs": {
                "block_label": "table",
                "n_rows": 7,
                "n_cols": 2,
                "integrity": {
                    "cells_checked": 10,
                    "cells_flagged": 1,
                    "flags": [
                        {
                            "row": 6,
                            "col": 0,
                            "coverage": 0.5,
                            "text": "Communications Team Brian Bollas 813-262-8549 brian.bollas@…"
                        }
                    ]
                }
            },
            "children": [
                {
                    "id": "p1.5.1",
                    "order": 6,
                    "type": "table_cell",
                    "bbox": {
                        "l": 32.846,
                        "t": 670.043,
                        "r": 111.086,
                        "b": 656.075
                    },
                    "text": "Project Details",
                    "attrs": {
                        "row": 0,
                        "col": 0,
                        "rowspan": 1,
                        "colspan": 2,
                        "bbox_refit": true,
                        "column_header": true,
                        "header_source": "pdf"
                    }
                },
                {
                    "id": "p1.5.2",
                    "order": 7,
                    "type": "table_cell",
                    "bbox": {
                        "l": 32.846,
                        "t": 650.02,
                        "r": 93.821,
                        "b": 636.925
                    },
                    "text": "Work Type",
                    "attrs": {
                        "row": 1,
                        "col": 0,
                        "rowspan": 1,
                        "colspan": 1,
                        "bbox_refit": true
                    }
                },
                {
                    "id": "p1.5.3",
                    "order": 8,
                    "type": "table_cell",
                    "bbox": {
                        "l": 126.874,
                        "t": 650.02,
                        "r": 191.314,
                        "b": 624.175
                    },
                    "text": "Interchange Construction",
                    "attrs": {
                        "row": 1,
                        "col": 1,
                        "rowspan": 1,
                        "colspan": 1,
                        "bbox_refit": true
                    }
                },
                {
                    "id": "p1.5.4",
                    "order": 9,
                    "type": "table_cell",
                    "bbox": {
                        "l": 32.846,
                        "t": 617.77,
                        "r": 67.64225,
                        "b": 585.175
                    },
                    "text": "Phase\nLimits",
                    "attrs": {
                        "row": 2,
                        "col": 0,
                        "rowspan": 1,
                        "colspan": 1,
                        "bbox_refit": true,
                        "merged_continuation": true
                    }
                },
                {
                    "id": "p1.5.5",
                    "order": 10,
                    "type": "table_cell",
                    "bbox": {
                        "l": 126.874,
                        "t": 617.77,
                        "r": 210.4165,
                        "b": 457.675
                    },
                    "text": "Construction\nI-75 (S.R. 93) just north and south of Daniels Parkway (C.R. 876) and Daniels Parkway from east of Danport Boulevard to west of Treeline Avenue",
                    "attrs": {
                        "row": 2,
                        "col": 1,
                        "rowspan": 1,
                        "colspan": 1,
                        "bbox_refit": true,
                        "merged_continuation": true
                    }
                },
                {
                    "id": "p1.5.6",
                    "order": 11,
                    "type": "table_cell",
                    "bbox": {
                        "l": 32.846,
                        "t": 451.27,
                        "r": 105.971,
                        "b": 366.925
                    },
                    "text": "City\nCounty\nRoad\nConstruction Cost",
                    "attrs": {
                        "row": 3,
                        "col": 0,
                        "rowspan": 1,
                        "colspan": 1,
                        "bbox_refit": true,
                        "merged_continuation": true
                    }
                },
                {
                    "id": "p1.5.7",
                    "order": 12,
                    "type": "table_cell",
                    "bbox": {
                        "l": 126.874,
                        "t": 451.27,
                        "r": 191.629,
                        "b": 366.925
                    },
                    "text": "Fort Myers\nLee\nI-75\n$42.8 Million (Approx.)",
                    "attrs": {
                        "row": 3,
                        "col": 1,
                        "rowspan": 1,
                        "colspan": 1,
                        "bbox_refit": true,
                        "merged_continuation": true
                    }
                },
                {
                    "id": "p1.5.8",
                    "order": 13,
                    "type": "table_cell",
                    "bbox": {
                        "l": 32.846,
                        "t": 352.619,
                        "r": 203.58725,
                        "b": 261.751
                    },
                    "text": "Contact Information\nCommunications Team FDOT-D1COMM\nConstruction Project Manager Jesten Abraham (863) 519-2889 Jesten.Abraham@dot.state.fl.us",
                    "attrs": {
                        "row": 4,
                        "col": 0,
                        "rowspan": 1,
                        "colspan": 2,
                        "bbox_refit": true,
                        "merged_continuation": true
                    }
                },
                {
                    "id": "p1.5.9",
                    "order": 14,
                    "type": "table_cell",
                    "bbox": {
                        "l": 32.846,
                        "t": 229.846,
                        "r": 162.20975,
                        "b": 184.50099999999998
                    },
                    "text": "Communications Team Michaela Zawodny Michaela.Zawodny@dot.state.fl.us",
                    "attrs": {
                        "row": 5,
                        "col": 0,
                        "rowspan": 1,
                        "colspan": 2,
                        "bbox_refit": true
                    }
                },
                {
                    "id": "p1.5.10",
                    "order": 15,
                    "type": "table_cell",
                    "bbox": {
                        "l": 28.32,
                        "t": 183.7477,
                        "r": 218.16,
                        "b": 143.52
                    },
                    "text": "Communications Team Brian Bollas 813-262-8549 brian.bollas@dot.state.fl.us",
                    "attrs": {
                        "row": 6,
                        "col": 0,
                        "rowspan": 1,
                        "colspan": 2
                    }
                }
            ]
        },
        {
            "id": "p1.6",
            "order": 16,
            "type": "figure",
            "bbox": {
                "l": 222.24,
                "t": 673.92,
                "r": 583.92,
                "b": 529.44
            },
            "text": "",
            "attrs": {
                "block_label": "image"
            }
        },
        {
            "id": "p1.7",
            "order": 17,
            "type": "heading",
            "bbox": {
                "l": 225.12,
                "t": 518.64,
                "r": 261.84,
                "b": 504.24
            },
            "text": "About",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p1.8",
            "order": 18,
            "type": "text",
            "bbox": {
                "l": 223.92,
                "t": 499.2,
                "r": 559.92,
                "b": 432.24
            },
            "text": "The purpose of this design project is to address the existing operational deficiencies of I-75 and Daniels Parkway Interchange within Lee County and to accommodate future travel demand projections because of forecasted population and employment growth."
        },
        {
            "id": "p1.9",
            "order": 19,
            "type": "text",
            "bbox": {
                "l": 224.16,
                "t": 426.24,
                "r": 581.28,
                "b": 333.84
            },
            "text": "The interchange improvements include Improvements include reconstruction of the Daniels Parkway Interchange (Exit 131) converting it to a Diverging Diamond Interchange (DDI) design, reconstruction of the I-75 ramps, construction of pedestrian and bicycle accommodations through the interchange, installation of new signals at the ramps, and resurfacing of Daniels Parkway through the project area."
        },
        {
            "id": "p1.10",
            "order": 20,
            "type": "footnote",
            "bbox": {
                "l": 527.04,
                "t": 539.04,
                "r": 582.48,
                "b": 530.16
            },
            "text": "Map data ©2024",
            "attrs": {
                "block_label": "vision_footnote"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}