← Paul Test
doc11938 854.pdf_v_d06082022.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
33 item(s)
JSON
figure (4)
footer (1)
footnote (2)
header (1)
heading (1)
list (1)
list_item (4)
table (1)
table_cell (9)
text (9)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TEXT
6 · TABLE
7
8
9
10
11
12
13
14
15
16 · TEXT
17 · TEXT
18 · FIGURE
19 · HEADING
20 · TEXT
21 · TEXT
22 · LIST
23
24
25
26
27 · TEXT
28 · TEXT
29 · TEXT
30 · TEXT
31 · FOOTNOTE
32 · FOOTNOTE
33 · FOOTER
Page 1 JSON
{
"document_id": 11938,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 12049,
"item_count": 33,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 2,
"header": 1,
"heading": 1,
"list": 1,
"list_item": 4,
"table": 1,
"table_cell": 9,
"text": 9
},
"build_ms": 3,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.48,
"r": 117.36,
"b": 725.76
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.44,
"t": 760.8,
"r": 320.88,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.52,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "text",
"bbox": {
"l": 26.16,
"t": 705.84,
"r": 574.32,
"b": 671.28
},
"text": "US 19 Pedestrian Crossing at Cross Bayou Blvd, Grand Blvd, Holiday Hills Blvd and Scenic Dr. 254677-5-12"
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.56,
"t": 662.16,
"r": 216.72,
"b": 416.4
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 5,
"n_cols": 2,
"integrity": {
"cells_checked": 9,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 639.35,
"r": 93.821,
"b": 626.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 639.35,
"r": 200.449,
"b": 613.505
},
"text": "Lighting Improvements",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 607.1,
"r": 105.971,
"b": 483.755
},
"text": "Phase\nProject Start\nCity\nCounty\nRoad\nConstruction Cost",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 607.1,
"r": 209.854,
"b": 496.505
},
"text": "Completed\nJune 16, 2021\nNew Port Richey\nPasco\nUS 19\n$528,014.96",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 477.35,
"r": 97.81475,
"b": 451.505
},
"text": "Estimated Completion",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 477.35,
"r": 198.77275,
"b": 464.255
},
"text": "Summer 2022",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 445.1,
"r": 93.87725,
"b": 432.005
},
"text": "Contractor",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 445.1,
"r": 210.99025,
"b": 432.005
},
"text": "Cone & Graham, Inc.",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 16,
"type": "text",
"bbox": {
"l": 30.96,
"t": 405.6,
"r": 142.32,
"b": 390.72
},
"text": "Contact Information"
},
{
"id": "p1.8",
"order": 17,
"type": "text",
"bbox": {
"l": 32.64,
"t": 384.72,
"r": 144.48,
"b": 347.28
},
"text": "Project Information\nRandy Aebersold\n727-575-8300"
},
{
"id": "p1.9",
"order": 18,
"type": "figure",
"bbox": {
"l": 222.96,
"t": 663.12,
"r": 583.2,
"b": 518.4
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.10",
"order": 19,
"type": "heading",
"bbox": {
"l": 224.64,
"t": 508.08,
"r": 260.88,
"b": 492.96
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.11",
"order": 20,
"type": "text",
"bbox": {
"l": 223.92,
"t": 488.16,
"r": 555.36,
"b": 460.08
},
"text": "As of May 31, 2022, all construction activities associated with this project are complete."
},
{
"id": "p1.12",
"order": 21,
"type": "text",
"bbox": {
"l": 224.16,
"t": 453.36,
"r": 555.84,
"b": 413.04
},
"text": "This project addresses pedestrian safety improvements with the construction of new crosswalks at four (4) intersections in Pasco County:"
},
{
"id": "p1.13",
"order": 22,
"type": "list",
"bbox": {
"l": 244.8,
"t": 404.64,
"r": 376.8,
"b": 345.36
},
"text": "",
"attrs": {
"item_count": 4
},
"children": [
{
"id": "p1.13.1",
"order": 23,
"type": "list_item",
"bbox": {
"l": 244.8,
"t": 404.64,
"r": 376.8,
"b": 390.48
},
"text": "Cross Bayou Boulevard",
"marker": "•"
},
{
"id": "p1.13.2",
"order": 24,
"type": "list_item",
"bbox": {
"l": 245.52,
"t": 389.04,
"r": 346.08,
"b": 375.6
},
"text": "Grand Boulevard",
"marker": "•"
},
{
"id": "p1.13.3",
"order": 25,
"type": "list_item",
"bbox": {
"l": 245.28,
"t": 374.4,
"r": 376.56,
"b": 360.48
},
"text": "Holiday Hills Boulevard",
"marker": "•"
},
{
"id": "p1.13.4",
"order": 26,
"type": "list_item",
"bbox": {
"l": 245.52,
"t": 359.04,
"r": 323.52,
"b": 345.36
},
"text": "Scenic Drive",
"marker": "•"
}
]
},
{
"id": "p1.14",
"order": 27,
"type": "text",
"bbox": {
"l": 35.04,
"t": 334.56,
"r": 210,
"b": 319.92
},
"text": "Randall.Aebersold@dot.state.fl.us"
},
{
"id": "p1.15",
"order": 28,
"type": "text",
"bbox": {
"l": 33.6,
"t": 316.08,
"r": 196.56,
"b": 263.04
},
"text": "Media Contact\nKayla Mejia\n813-975-6060\nKayla.Mejia@dot.state.fl.us"
},
{
"id": "p1.16",
"order": 29,
"type": "text",
"bbox": {
"l": 224.4,
"t": 336.72,
"r": 579.6,
"b": 282.72
},
"text": "Elements of work at all four (4) intersections shall include but are not limited to roadway resurfacing, median improvements, sidewalk and curb ramp improvements, crosswalks and all necessary sign and pavement markings."
},
{
"id": "p1.17",
"order": 30,
"type": "text",
"bbox": {
"l": 225.36,
"t": 277.44,
"r": 543.84,
"b": 260.88
},
"text": "Construction is anticipated to finish in the summer of 2022."
},
{
"id": "p1.18",
"order": 31,
"type": "footnote",
"bbox": {
"l": 225.6,
"t": 533.76,
"r": 264.24,
"b": 519.84
},
"text": "Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.19",
"order": 32,
"type": "footnote",
"bbox": {
"l": 505.2,
"t": 528.96,
"r": 582.96,
"b": 519.36
},
"text": "Map data ©2022 INEGI",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.20",
"order": 33,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.4,
"r": 359.52,
"b": 9.36
},
"text": "Last Updated: 06/08/2022",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}