{
    "document_id": 11894,
    "page": 6,
    "width_pt": 613.44,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 12005,
    "item_count": 18,
    "counts_by_type": {
        "header": 1,
        "heading": 1,
        "text": 16
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p6.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 487.2,
                "t": 757.68,
                "r": 539.28,
                "b": 744.48
            },
            "text": "Page 6 of 9",
            "attrs": {
                "block_label": "number"
            },
            "level": 2
        },
        {
            "id": "p6.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 162.48,
                "t": 718.32,
                "r": 540.24,
                "b": 666.72
            },
            "text": "The Township Engineer may issue a soil removal permit, in conjunction with a building permit application, for removal of soil for building foundations and other structures, provided that the total amount of soil to be removed from any site does not exceed 500 cubic yards."
        },
        {
            "id": "p6.3",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 161.28,
                "t": 666.48,
                "r": 540,
                "b": 600.48
            },
            "text": "The Planning Board may approve a soil removal permit, as a condition of its approval of an application for development, upon finding that the removal is necessary for the development of the site as approved by the Board, and further provided that the amount of soil to be removed from the property or site does not exceed 1,000 cubic yards."
        },
        {
            "id": "p6.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 174.96,
                "t": 588.72,
                "r": 538.8,
                "b": 562.08
            },
            "text": "The applicant should confirm the 1000 CY limitation will not be exceeded or if a soil removal permit is required."
        },
        {
            "id": "p6.5",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 142.08,
                "t": 550.8,
                "r": 539.28,
                "b": 510.96
            },
            "text": "b. The proposed stormwater management system consists of a series of interconnected driveway parking and yard area inlet structures discharging to an underground recharge area to the rear of the site."
        },
        {
            "id": "p6.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 138.96,
                "t": 498.96,
                "r": 476.64,
                "b": 485.04
            },
            "text": "Although conceptually acceptable, the applicant should address the following:"
        },
        {
            "id": "p6.7",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 143.52,
                "t": 473.04,
                "r": 539.04,
                "b": 446.64
            },
            "text": "Proposals for future ownership and maintenance of the stormwater collection and management facilities."
        },
        {
            "id": "p6.8",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 143.28,
                "t": 434.64,
                "r": 538.08,
                "b": 408
            },
            "text": "Subsurface soil conditions, available permeability as well as restricted layers which were encountered and anticipated \"Time to Drain\"."
        },
        {
            "id": "p6.9",
            "order": 9,
            "type": "text",
            "bbox": {
                "l": 143.04,
                "t": 396,
                "r": 466.08,
                "b": 382.08
            },
            "text": "Downstream impacts associated with any drainage system overflow."
        },
        {
            "id": "p6.10",
            "order": 10,
            "type": "text",
            "bbox": {
                "l": 143.28,
                "t": 370.32,
                "r": 516.48,
                "b": 356.16
            },
            "text": "Provisions for drainage basin security, maintenance access and screen buffering."
        },
        {
            "id": "p6.11",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 143.28,
                "t": 344.64,
                "r": 524.64,
                "b": 330.48
            },
            "text": "The ability to provide proper separation distance to the seasonal high-water table."
        },
        {
            "id": "p6.12",
            "order": 12,
            "type": "text",
            "bbox": {
                "l": 142.32,
                "t": 318.72,
                "r": 503.04,
                "b": 304.56
            },
            "text": "Design inconsistencies with the Pinelands Comprehensive Management Plan."
        },
        {
            "id": "p6.13",
            "order": 13,
            "type": "text",
            "bbox": {
                "l": 119.28,
                "t": 292.8,
                "r": 539.28,
                "b": 200.4
            },
            "text": "c. All stormwater management systems approved by the Township require the submission of written and recorded documentation ensuring that the future maintenance of the system shall be the responsibility of the property owner. Copies of fully executed and recorded documents shall be submitted prior to signing of the development plans, commencement of any onsite construction or issuance of any construction permits. The applicant should confirm that specific provisions of Ordinance Section 244-209.J detailing maintenance plans/agreement requirements will be met."
        },
        {
            "id": "p6.14",
            "order": 14,
            "type": "heading",
            "bbox": {
                "l": 101.28,
                "t": 189.84,
                "r": 230.88,
                "b": 176.16
            },
            "text": "6. Lighting and Landscaping",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p6.15",
            "order": 15,
            "type": "text",
            "bbox": {
                "l": 118.56,
                "t": 163.68,
                "r": 538.56,
                "b": 124.08
            },
            "text": "a. Site Plan Drawing Sheet 10 of 22 detail the site lighting facilities which are proposed. Based on the lighting levels indicated, proposed site illumination is acceptable. However, the applicant should also be prepared to address:"
        },
        {
            "id": "p6.16",
            "order": 16,
            "type": "text",
            "bbox": {
                "l": 145.44,
                "t": 112.32,
                "r": 510.24,
                "b": 98.16
            },
            "text": "Confirmation that shielding will be provided to eliminate offsite glare impacts."
        },
        {
            "id": "p6.17",
            "order": 17,
            "type": "text",
            "bbox": {
                "l": 145.92,
                "t": 86.64,
                "r": 485.52,
                "b": 72.72
            },
            "text": "Provisions for automatic activation/deactivation of site lighting facilities."
        },
        {
            "id": "p6.18",
            "order": 18,
            "type": "text",
            "bbox": {
                "l": 145.92,
                "t": 60.96,
                "r": 363.6,
                "b": 46.56
            },
            "text": "Extent of all new building mounted lighting."
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}