            "type": "text",
            "bbox": {
                "l": 59.76,
                "t": 737.28,
                "r": 534.24,
                "b": 710.64
            },
            "text": "directly into the aquifers that supply drinking water. Contaminants entering a sinkhole receive little or no natural filtration."
        },
        {
            "id": "p2.2",
            "order": 2,
            "type": "list",
            "bbox": {
                "l": 70.56,
                "t": 705.170163,
                "r": 541.44,
                "b": 544.8
            },
            "text": "",
            "attrs": {
                "item_count": 5
            },
            "children": [
                {
                    "id": "p2.2.1",
                    "order": 3,
                    "type": "list_item",
                    "bbox": {
                        "l": 70.56,
                        "t": 705.170163,
                        "r": 541.44,
                        "b": 677.52
                    },
                    "text": "Mandatory setbacks for data center buildings, fuel storage, chemical storage, stormwater basins, and wastewater infrastructure from mapped sinkholes, karst features, losing streams, and springs."
                },
                {
                    "id": "p2.2.2",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.28,
                        "t": 675.410158,
                        "r": 530.4,
                        "b": 635.04
                    },
                    "text": "A required karst and geologic site investigation by a qualified independent geologist before any application is accepted, including identification of unmapped karst features on and adjacent to the site.",
                    "marker": "-"
                },
                {
                    "id": "p2.2.3",
                    "order": 5,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.52,
                        "t": 632.090162,
                        "r": 521.52,
                        "b": 605.28
                    },
                    "text": "Prohibition on siting in areas of active or high-density sinkhole formation, where subsidence also threatens the structures themselves.",
                    "marker": "•"
                },
                {
                    "id": "p2.2.4",
                    "order": 6,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.28,
                        "t": 602.210153,
                        "r": 528.72,
                        "b": 574.56
                    },
                    "text": "Secondary containment for all fuel and chemical storage, sized and designed for karst terrain, with groundwater monitoring wells around the facility."
                },
                {
                    "id": "p2.2.5",
                    "order": 7,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.28,
                        "t": 572.330156,
                        "r": 531.36,
                        "b": 544.8
                    },
                    "text": "Stormwater designs that do not concentrate infiltration near karst features; a pond or basin placed over a sinkhole becomes a direct injection point to the aquifer."
                }
            ]
        },
        {
            "id": "p2.3",
            "order": 8,
            "type": "heading",
            "bbox": {
                "l": 60.72,
                "t": 531.84,
                "r": 215.28,
                "b": 517.68
            },
            "text": "4. Electrical Grid and Energy",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p2.4",
            "order": 9,
            "type": "list",
            "bbox": {
                "l": 70.56,
                "t": 511.610162,
                "r": 548.4,
                "b": 246.24
            },
            "text": "",
            "attrs": {
                "item_count": 9
            },
            "children": [
                {
                    "id": "p2.4.1",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.76,
                        "t": 511.610162,
                        "r": 544.08,
                        "b": 484.32
                    },
                    "text": "Enormous electrical demand — a single large campus can use as much power as a city — straining the regional grid.",
                    "marker": "-"
                },
                {
                    "id": "p2.4.2",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.76,
                        "t": 481.730165,
                        "r": 548.4,
                        "b": 427.68
                    },
                    "text": "Proof of excess power capacity: applicants must provide documented verification from the serving utility and regional grid operator that at least 150% of the facility's projected peak demand is available as excess capacity — beyond existing committed load — before an application is accepted, so a project cannot be approved on power that does not yet exist or that would be taken from existing customers.",
                    "marker": "-"
                },
                {
                    "id": "p2.4.3",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.76,
                        "t": 425.09015,
                        "r": 534.96,
                        "b": 397.92
                    },
                    "text": "Rate increases for residential and small-business customers when utilities build new generation and transmission to serve data centers (documented in Virginia, Georgia, Ohio, and elsewhere).",
                    "marker": "-"
                },
                {
                    "id": "p2.4.4",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 70.56,
                        "t": 395.210176,
                        "r": 506.88,
                        "b": 381.36
                    },
                    "text": "New high-voltage transmission lines and substations crossing farms and rural neighborhoods.",
                    "marker": "•"
                },
                {
                    "id": "p2.4.5",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.76,
                        "t": 378.770143,
                        "r": 492.96,
                        "b": 364.56
                    },
                    "text": "Reliability risk: large loads connecting or disconnecting can destabilize local grid segments.",
                    "marker": "-"
                },
                {
                    "id": "p2.4.6",
                    "order": 15,
                    "type": "list_item",
                    "bbox": {
                        "l": 72,
                        "t": 362.330156,
                        "r": 536.4,
                        "b": 335.52
                    },
                    "text": "On-site fossil generation (diesel or gas turbines) used as primary or bridge power when grid capacity lags."
                },
                {
                    "id": "p2.4.7",
                    "order": 16,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.52,
                        "t": 332.450181,
                        "r": 517.44,
                        "b": 305.04
                    },
                    "text": "Require a backup power plan with operating restrictions, together with a generator testing plan specifying frequency, duration, permitted hours, and neighbor notification.",
                    "marker": "-"
                },
                {
                    "id": "p2.4.8",
                    "order": 17,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.52,
                        "t": 302.690141,
                        "r": 542.16,
                        "b": 275.76
                    },
                    "text": "Underground and overhead line routes must not interfere with non-participating parcels and must be installed at the applicant's expense.",
                    "marker": "-"
                },
                {
                    "id": "p2.4.9",
                    "order": 18,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.28,
                        "t": 272.810167,
                        "r": 520.08,
                        "b": 246.24
                    },
                    "text": "A plan identifying all grid interconnection points must be established and demonstrated suitable before approval.",
                    "marker": "-"
                }
            ]
        },
        {
            "id": "p2.5",
            "order": 19,
            "type": "heading",
            "bbox": {
                "l": 60.72,
                "t": 231.84,
                "r": 224.64,
                "b": 218.16
            },
            "text": "5. Airport and Aviation Safety",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p2.6",
            "order": 20,
            "type": "list",
            "bbox": {
                "l": 71.28,
                "t": 212.09015,
                "r": 545.04,
                "b": 61.92
            },
            "text": "",
            "attrs": {
                "item_count": 6
            },
            "children": [
                {
                    "id": "p2.6.1",
                    "order": 21,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.76,
                        "t": 212.09015,
                        "r": 545.04,
                        "b": 185.04
                    },
                    "text": "Proximity to the Dubuque Regional Airport raises specific hazards that require FAA review before local approval.",
                    "marker": "-"
                },
                {
                    "id": "p2.6.2",
                    "order": 22,
                    "type": "list_item",
                    "bbox": {
                        "l": 72,
                        "t": 182.21017600000005,
                        "r": 531.36,
                        "b": 155.04
                    },
                    "text": "The airport's heavy presence of student pilots and small general-aviation aircraft, which operate at lower altitudes and are more vulnerable to plume turbulence and visibility hazards."
                },
                {
                    "id": "p2.6.3",
                    "order": 23,
                    "type": "list_item",
                    "bbox": {
                        "l": 72,
                        "t": 152.330156,
                        "r": 539.04,
                        "b": 125.52
                    },
                    "text": "Structure and crane heights penetrating FAR Part 77 airspace surfaces (FAA Form 7460-1 obstruction review).",
                    "marker": "-"
                },
                {
                    "id": "p2.6.4",
                    "order": 24,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.52,
                        "t": 122.45018100000004,
                        "r": 540,
                        "b": 95.52
                    },
                    "text": "Thermal plumes from cooling equipment and generator exhaust creating turbulence hazards for low-flying aircraft (per FAA guidance in AIM 7-6-16).",
                    "marker": "-"
                },
                {
                    "id": "p2.6.5",
                    "order": 25,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.52,
                        "t": 92.69014100000004,
                        "r": 542.88,
                        "b": 78.72
                    },
                    "text": "Steam from exhaust and cooling towers can cause icing on aircraft operating in the vicinity of the site."
                },
                {
                    "id": "p2.6.6",
                    "order": 26,
                    "type": "list_item",
                    "bbox": {
                        "l": 71.28,
                        "t": 76.25015399999995,
                        "r": 467.04,
                        "b": 61.92
                    },
                    "text": "Glint and glare from rooftop solar or reflective surfaces affecting pilots on approach.",
                    "marker": "•"
                }
            ]
        }
    ],