            "text": "been identified for removal by Developer. Developer will be responsible for installing additional temporary regulatory signs on crash-tested portable supports to supplement the permanent signs where appropriate due to the modifications performed."
        },
        {
            "id": "p203.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 140.64,
                "t": 689.04,
                "r": 506.4,
                "b": 675.12
            },
            "text": "d. Costs associated with all modifications shall be borne by the developer."
        },
        {
            "id": "p203.3",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 68.88,
                "t": 661.68,
                "r": 541.92,
                "b": 632.88
            },
            "text": "4.2 Compliance with Law. Developer agrees that all modifications made pursuant to Section 4.1 shall comply with all applicable laws and subject to inspection by County Engineer."
        },
        {
            "id": "p203.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 68.64,
                "t": 620.4,
                "r": 542.88,
                "b": 563.76
            },
            "text": "4.3 Collection System. County hereby acknowledges, agrees and consents that Developer may desire to route certain underground and overhead wires, cables, conduits and/or lines (and their associated equipment) related to the transmission of electricity or data (“Utility”) from the Project at a location adjacent to, over, across, or beneath certain Designated Roads."
        },
        {
            "id": "p203.5",
            "order": 5,
            "type": "heading",
            "bbox": {
                "l": 69.36,
                "t": 551.28,
                "r": 465.36,
                "b": 536.64
            },
            "text": "5. Completion of Repairs and Restoration and Certificate of Completion",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p203.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 67.92,
                "t": 524.4,
                "r": 543.12,
                "b": 356.16
            },
            "text": "5.1 Preliminary Punchlist. Upon request to be made by Developer approximately thirty (30) to forty-five (45) days before the installation of the last inverter or solar panel on the Project, County shall issue a preliminary punch list of items requiring restoration or repair under this Agreement. Developer shall review the preliminary punch list and provide comments to County within thirty (30) days of receipt of the preliminary punch list. County will proceed with correcting all punch list items upon which Developer and County agree. If there are items upon which Developer and County disagree or which County wishes to have added to the punch list, Developer and County shall meet to attempt to reach agreement on all such items. If agreement cannot be reached, Developer shall, at its own expense, hire a qualified independent engineer to review the items and this Agreement and determine whether the items in dispute should be part of the punch list. The determination of the Engineer shall be final. Developer shall make repairs in accordance with the determination by the Engineer."
        },
        {
            "id": "p203.7",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 68.16,
                "t": 341.28,
                "r": 543.36,
                "b": 174.24
            },
            "text": "5.2 Final Punch List. No later than five (5) days after receiving notification from Developer that the final inverter or solar panel has been installed, County shall issue a final punch list or items requiring repair or restoration under this Agreement. Developer shall review the final punch list and provide comments to County within five (5) days of receipt of the final punch list. Developer will reimburse County for correcting all punch list items upon which Developer and County agree. If there are items upon which Developer and County disagree or which County wishes to have added to the punch list, Developer and County shall meet to attempt to reach agreement on all such items. If agreement cannot be reached, Developer shall, at its own expense, hire a qualified independent engineer to review the items and this Agreement and determine whether the items in dispute should be part of the punch list. The determination of the Engineer shall be final. Developer shall reimburse County for repairs in accordance with the determination by the Engineer."
        },
        {
            "id": "p203.8",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 68.4,
                "t": 161.76,
                "r": 542.88,
                "b": 64.32
            },
            "text": "5.3 Completion of Punch List. Developer shall reimburse County for all final punch list items no later than thirty (30) days after receipt of an invoice from the County for associated costs. The County shall complete final punch list items within thirty (30) days after the list becomes final unless the Parties agree otherwise; provided, however, that if seasonal issues or weather conditions warrant completion of the final punch list items the following spring/summer, the Parties will reasonably agree on a mutually acceptable outside date for completion of these items when weather permits."
        },
        {
            "id": "p203.9",
            "order": 9,
            "type": "footer",
            "bbox": {
                "l": 300,
                "t": 45.84,
                "r": 308.16,
                "b": 34.8
            },
            "text": "6",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p203.10",
            "order": 10,
            "type": "footer",
            "bbox": {
                "l": 444.72,
                "t": 45.84,
                "r": 530.16,
                "b": 36
            },
            "text": "DRAFT - Road Use & Repair",
            "attrs": {
                "block_label": "footer"
            }
        },
        {
            "id": "p203.11",
            "order": 11,
            "type": "footer",
            "bbox": {
                "l": 517.2,
                "t": 21.84,
                "r": 593.04,
                "b": 9.12
            },
            "text": "Page 203 of 217",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}