            "id": "p201.1",
            "order": 1,
            "type": "text",
            "bbox": {
                "l": 69.36,
                "t": 745.92,
                "r": 542.64,
                "b": 716.64
            },
            "text": "3.2 Crawler Crane Crossings. Should construction operations necessitate the crossing of an existing roadway with crawler cranes, Developer shall adhere to the following specifications:"
        },
        {
            "id": "p201.2",
            "order": 2,
            "type": "list",
            "bbox": {
                "l": 140.88,
                "t": 704.16,
                "r": 543.6,
                "b": 330.72
            },
            "text": "",
            "attrs": {
                "item_count": 6
            },
            "children": [
                {
                    "id": "p201.2.1",
                    "order": 3,
                    "type": "list_item",
                    "bbox": {
                        "l": 141.12,
                        "t": 704.16,
                        "r": 543.6,
                        "b": 662.4
                    },
                    "text": "Developer shall provide County with a map identifying the total number of crossings along with coordinates for each crossing at least ten (10) days prior to crossing.",
                    "marker": "a."
                },
                {
                    "id": "p201.2.2",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 140.88,
                        "t": 648.96,
                        "r": 542.4,
                        "b": 592.56
                    },
                    "text": "Developer shall supply a traffic control plan for the crane crossings detailing how the traffic shall be handled during each of the crossings, the time frame for all road closures, and detail how the closure shall be handled with the Dubuque County Secondary Department and County Law Enforcement Center.",
                    "marker": "b."
                },
                {
                    "id": "p201.2.3",
                    "order": 5,
                    "type": "list_item",
                    "bbox": {
                        "l": 169.68,
                        "t": 580.56,
                        "r": 542.88,
                        "b": 523.68
                    },
                    "text": "No roadway shall be closed without giving forty-eight (48) hours' notice to County Engineer (or his authorized designee) and the Law Enforcement Center. No roadway shall be closed on a weekend or holiday. The maximum closure time closure shall be four (4) hours.",
                    "marker": "i."
                },
                {
                    "id": "p201.2.4",
                    "order": 6,
                    "type": "list_item",
                    "bbox": {
                        "l": 140.88,
                        "t": 510.96,
                        "r": 541.92,
                        "b": 468.96
                    },
                    "text": "At least seven (7) days prior to the mobilization of the crawler crane, the Developer shall provide a detail of how the weight of the crane will be bridged over the roadway.",
                    "marker": "c."
                },
                {
                    "id": "p201.2.5",
                    "order": 7,
                    "type": "list_item",
                    "bbox": {
                        "l": 169.2,
                        "t": 455.76,
                        "r": 542.16,
                        "b": 384.96
                    },
                    "text": "The material used to bridge the roadway shall be removed from the roadway immediately after the crane crosses the roadway. The roadway shall be inspected for any damage. If no major damage has occurred, the roadway shall be reopened to the traveling public. If major damage has occurred County Engineer shall be notified immediately.",
                    "marker": "i."
                },
                {
                    "id": "p201.2.6",
                    "order": 8,
                    "type": "list_item",
                    "bbox": {
                        "l": 166.8,
                        "t": 373.68,
                        "r": 542.64,
                        "b": 330.72
                    },
                    "text": "Developer shall be liable for all costs to repair all damages to the roadway caused by crane crossings and shall make such repairs as directed by County Engineer.",
                    "marker": "ii."
                }
            ]
        },
        {
            "id": "p201.3",
            "order": 9,
            "type": "text",
            "bbox": {
                "l": 69.12,
                "t": 318.24,
                "r": 543.12,
                "b": 274.56
            },
            "text": "3.3 Rough Terrain (RT) Cranes. Developer shall be permitted to drive RT Cranes utilizing rubber tires on Designated Roads and other County roadways provided Developer provides County a map identifying RT Crane routes prior to RT Cranes actually using such other roadways."
        },
        {
            "id": "p201.4",
            "order": 10,
            "type": "text",
            "bbox": {
                "l": 68.16,
                "t": 263.04,
                "r": 543.36,
                "b": 54.24
            },
            "text": "3.4 Maintenance of Roads During Construction. County shall maintain all Designated Roads during construction in a condition that is reasonably satisfactory to allow for the safe passage and use by motor vehicles. Maintenance during construction shall constitute continuous and effective work prosecuted day by day, with adequate equipment and forces to the end that all roadways and structures are kept in such reasonably satisfactory condition at all times. Maintenance may include but is not limited to dust control measures, pavement sweeping, blading of gravel surfaces, aggregate surfacing, and paved surface repairs and surfacing. County may, in its discretion and as staff time permits, make daily inspection of the Designated Roads. For the entire portion of any gravel roadway that is being used for hauling operations, Developer Party shall provide or reimburse County for chemical dust palliative application at its own expense as directed and located by County within thirty (30) days after receipt of a written invoice. Should a roadway become impassable for vehicles in a safe manor due to rutting, potholes, or other deformation of the roadway, corrective action shall be taken by County. County shall respond as soon as practicable but not later than twenty-four (24) hours after any call from Developer concerning any request to improve or maintain Designated Roads. The materials, placement, and workmanship"
        },
        {
            "id": "p201.5",
            "order": 11,
            "type": "footer",
            "bbox": {
                "l": 299.76,
                "t": 45.36,
                "r": 308.4,
                "b": 35.52
            },
            "text": "4",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p201.6",
            "order": 12,
            "type": "footer",
            "bbox": {
                "l": 444.96,
                "t": 45.6,
                "r": 530.16,
                "b": 36
            },
            "text": "DRAFT - Road Use & Repair",
            "attrs": {
                "block_label": "footer"
            }
        },
        {
            "id": "p201.7",
            "order": 13,
            "type": "footer",
            "bbox": {
                "l": 516.96,
                "t": 21.84,
                "r": 593.04,
                "b": 9.12
            },
            "text": "Page 201 of 217",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}