← Paul Test
doc11615 1179.pdf_v_d01072026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
21 item(s)
JSON
figure (4)
footer (1)
footnote (2)
header (1)
heading (3)
table (1)
table_cell (5)
text (4)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · HEADING
6 · TABLE
7
8
9
10
11
12 · TEXT
13 · TEXT
14 · TEXT
15 · FIGURE
16
17 · HEADING
18 · TEXT
19 · FOOTNOTE
20 · FOOTNOTE
21 · FOOTER
Page 1 JSON
{
"document_id": 11615,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11726,
"item_count": 21,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 2,
"header": 1,
"heading": 3,
"table": 1,
"table_cell": 5,
"text": 4
},
"build_ms": 2,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.48,
"r": 117.6,
"b": 726.72
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.2,
"t": 760.8,
"r": 321.36,
"b": 727.92
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.04,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "heading",
"bbox": {
"l": 27.36,
"t": 705.36,
"r": 482.88,
"b": 689.28
},
"text": "I-75 Resurfacing from north of S.R. 52 to Hernando County Line 454499-1-52-01",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 679.92,
"r": 216.72,
"b": 506.64
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 3,
"n_cols": 2,
"integrity": {
"cells_checked": 5,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 605.255
},
"text": "Work Type\nPhase\nLimits",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 203.72275,
"b": 567.005
},
"text": "Resurfacing\nDesign\nI-75 from north of S.R. 52 to Hernando County Line",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 560.6,
"r": 73.076,
"b": 508.505
},
"text": "City\nCounty\nRoad",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 560.6,
"r": 176.5765,
"b": 508.505
},
"text": "Dade City\nPasco\nI-75",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.7",
"order": 12,
"type": "text",
"bbox": {
"l": 30.96,
"t": 494.64,
"r": 142.32,
"b": 480.24
},
"text": "Contact Information"
},
{
"id": "p1.8",
"order": 13,
"type": "text",
"bbox": {
"l": 31.2,
"t": 476.64,
"r": 213.36,
"b": 423.12
},
"text": "Design Manager\nDinyar Sharifabad\n(813) 975-6172\nDinyar.Sharifabad@dot.state.fl.us"
},
{
"id": "p1.9",
"order": 14,
"type": "text",
"bbox": {
"l": 36.96,
"t": 415.2,
"r": 184.56,
"b": 364.32
},
"text": "Media Contact\nKayla Mejia\n813-975-6060\nKayla.Mejia@dot.state.fl.us"
},
{
"id": "p1.10",
"order": 15,
"type": "figure",
"bbox": {
"l": 223.2,
"t": 681.12,
"r": 583.44,
"b": 537.36
},
"text": "",
"attrs": {
"block_label": "image"
},
"children": [
{
"id": "p1.10.1",
"order": 16,
"type": "heading",
"bbox": {
"l": 230.16,
"t": 670.08,
"r": 280.56,
"b": 659.28
},
"text": "Masaryktown",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
}
]
},
{
"id": "p1.11",
"order": 17,
"type": "heading",
"bbox": {
"l": 224.88,
"t": 526.08,
"r": 261.6,
"b": 511.44
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.12",
"order": 18,
"type": "text",
"bbox": {
"l": 225.12,
"t": 507.6,
"r": 575.76,
"b": 374.64
},
"text": "The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing on I-75 from north of S.R. 52 to the Hernando County line.\n\nThe interchange at County Road (C.R.) 41 will also be resurfaced, including the ramps and the northwest and southeast access roads.\n\nOther improvements include signing and pavement markings, signalization, and minor drainage upgrades.\nConstruction is currently anticipated to begin March 2028."
},
{
"id": "p1.13",
"order": 19,
"type": "footnote",
"bbox": {
"l": 225.6,
"t": 550.56,
"r": 264.96,
"b": 538.32
},
"text": "Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.14",
"order": 20,
"type": "footnote",
"bbox": {
"l": 502.56,
"t": 546.24,
"r": 582.72,
"b": 537.6
},
"text": "Map data ©2025 Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.15",
"order": 21,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.16,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 01/07/2026",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}