← Paul Test
doc11546 1142.pdf_v_d10052026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
28 item(s)
JSON
figure (4)
footer (1)
footnote (1)
header (1)
heading (2)
table (1)
table_cell (9)
text (8)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · HEADING
6 · TABLE
7
8
9
10
11
12
13
14
15
16 · TEXT
17 · TEXT
18 · TEXT
19 · FIGURE
20 · HEADING
21 · TEXT
22 · TEXT
23 · TEXT
24 · TITLE
25 · TEXT
26 · TEXT
27 · FOOTNOTE
28 · FOOTER
Page 1 JSON
{
"document_id": 11546,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11657,
"item_count": 28,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 2,
"table": 1,
"table_cell": 9,
"text": 8,
"title": 1
},
"build_ms": 3,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.48,
"r": 117.6,
"b": 726.48
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 126.96,
"t": 760.8,
"r": 321.36,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.52,
"t": 773.52,
"r": 578.4,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "heading",
"bbox": {
"l": 27.36,
"t": 705.36,
"r": 470.4,
"b": 689.28
},
"text": "SR 54 at Altamont Lane Median Improvements in Pasco County 254677-6-24",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.56,
"t": 680.16,
"r": 216.96,
"b": 414.72
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 5,
"n_cols": 2,
"integrity": {
"cells_checked": 9,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 605.255
},
"text": "Work Type\nPhase\nLimits",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 186.589,
"b": 592.505
},
"text": "Safety\nCompleted\nat Altamont Lane",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 586.1,
"r": 105.971,
"b": 482.255
},
"text": "Project Start\nCity\nCounty\nRoad\nConstruction Cost",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 586.1,
"r": 198.2665,
"b": 495.005
},
"text": "April 20, 2026\nOdessa\nPasco\nSR 54\n$640,000",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 475.85,
"r": 97.81475,
"b": 450.005
},
"text": "Estimated Completion",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 475.85,
"r": 186.89275,
"b": 462.755
},
"text": "July 9, 2026",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 443.6,
"r": 93.87725,
"b": 430.505
},
"text": "Contractor",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 443.6,
"r": 210.99025,
"b": 430.505
},
"text": "Cone & Graham, Inc",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 16,
"type": "text",
"bbox": {
"l": 30.96,
"t": 403.92,
"r": 142.08,
"b": 388.8
},
"text": "Contact Information"
},
{
"id": "p1.8",
"order": 17,
"type": "text",
"bbox": {
"l": 32.4,
"t": 383.52,
"r": 197.76,
"b": 330.48
},
"text": "Project Information\nMaddie Griffin\n727-575-8334\nMaddie.Griffin@dot.state.fl.us"
},
{
"id": "p1.9",
"order": 18,
"type": "text",
"bbox": {
"l": 37.44,
"t": 320.64,
"r": 184.32,
"b": 272.4
},
"text": "Media Contact\nKayla Mejia\n813-975-6060\nKayla.Mejia@dot.state.fl.us"
},
{
"id": "p1.10",
"order": 19,
"type": "figure",
"bbox": {
"l": 222.48,
"t": 682.08,
"r": 583.2,
"b": 536.16
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.11",
"order": 20,
"type": "heading",
"bbox": {
"l": 224.88,
"t": 526.08,
"r": 261.36,
"b": 511.44
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.12",
"order": 21,
"type": "text",
"bbox": {
"l": 224.16,
"t": 506.4,
"r": 573.36,
"b": 477.84
},
"text": "As of July 9, 2026, all construction activities associated with this project have been completed."
},
{
"id": "p1.13",
"order": 22,
"type": "text",
"bbox": {
"l": 224.4,
"t": 471.36,
"r": 571.92,
"b": 430.32
},
"text": "The Florida Department of Transportation's Design-Build firm, Cone & Graham, Inc., is making median improvements on SR 54 at Altamonte Lane in Pasco County."
},
{
"id": "p1.14",
"order": 23,
"type": "text",
"bbox": {
"l": 224.4,
"t": 424.32,
"r": 567.84,
"b": 396
},
"text": "Other safety improvements include roadway widening, milling and resurfacing, and installing a new traffic separator."
},
{
"id": "p1.15",
"order": 24,
"type": "title",
"bbox": {
"l": 224.88,
"t": 389.76,
"r": 564,
"b": 362.88
},
"text": "Construction activities are expected to be complete in summer of 2026.",
"level": 2
},
{
"id": "p1.16",
"order": 25,
"type": "text",
"bbox": {
"l": 224.88,
"t": 355.68,
"r": 577.2,
"b": 332.16
},
"text": "*****\n*****"
},
{
"id": "p1.17",
"order": 26,
"type": "text",
"bbox": {
"l": 224.64,
"t": 320.88,
"r": 577.2,
"b": 227.76
},
"text": "What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously."
},
{
"id": "p1.18",
"order": 27,
"type": "footnote",
"bbox": {
"l": 501.84,
"t": 546.96,
"r": 582.96,
"b": 536.88
},
"text": "Map data ©2026 Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.19",
"order": 28,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.4,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 10/05/2026",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}