← Paul Test
doc11498 914.pdf_v_d06052025.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
32 item(s)
JSON
figure (4)
footer (1)
header (1)
heading (1)
table (2)
table_cell (19)
text (3)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TITLE
6 · TABLE
7
8
9
10
11
12
13
14
15
16
17
18 · TABLE
19
20
21
22
23
24
25
26
27 · FIGURE
28 · HEADING
29 · TEXT
30 · TEXT
31 · TEXT
32 · FOOTER
Table integrity:
3 of 8 cells don't match the text layer at their coordinates.
r1c0 (50%): “Maddie Griffin”
r2c0 (0%): “RoadWork@dot.state.fl.us”
r5c0 (0%): “Kayla.Mejia@dot.state.fl.us”
Page 1 JSON
{
"document_id": 11498,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11609,
"item_count": 32,
"counts_by_type": {
"figure": 4,
"footer": 1,
"header": 1,
"heading": 1,
"table": 2,
"table_cell": 19,
"text": 3,
"title": 1
},
"build_ms": 6,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.48,
"r": 117.6,
"b": 725.52
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.2,
"t": 761.04,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.52,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "title",
"bbox": {
"l": 25.68,
"t": 706.08,
"r": 561.84,
"b": 672.72
},
"text": "SR 60 Repaving from west of Clearwater Harbor Channel to Memorial Causeway Bridge\n441651-1-52-01",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.56,
"t": 661.92,
"r": 217.2,
"b": 319.68
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 6,
"n_cols": 2,
"integrity": {
"cells_checked": 11,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 639.35,
"r": 93.821,
"b": 587.255
},
"text": "Work Type\nPhase\nLimits",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 639.35,
"r": 207.07525,
"b": 523.505
},
"text": "Resurfacing\nCompleted\nFrom west of Clearwater Harbor Channel to the Memorial Causeway Bridge",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 517.1,
"r": 105.6785,
"b": 504.005
},
"text": "Project Start",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 517.1,
"r": 192.394,
"b": 491.255
},
"text": "November 6, 2024",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 484.85,
"r": 73.076,
"b": 413.255
},
"text": "Length\nCity\nCounty\nRoad",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 484.85,
"r": 182.19025,
"b": 387.755
},
"text": "1.2 miles\nClearwater\nPinellas\nMemorial Causeway SR 60",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 381.35,
"r": 97.81475,
"b": 355.505
},
"text": "Estimated Completion",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 381.35,
"r": 188.49025,
"b": 368.255
},
"text": "Spring 2025",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.10",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 349.1,
"r": 93.87725,
"b": 336.005
},
"text": "Contractor",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.11",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 349.1,
"r": 174.13525,
"b": 323.255
},
"text": "Preferred Materials",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 18,
"type": "table",
"bbox": {
"l": 28.8,
"t": 310.8,
"r": 216.72,
"b": 177.6
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 6,
"n_cols": 2,
"integrity": {
"cells_checked": 8,
"cells_flagged": 3,
"flags": [
{
"row": 1,
"col": 0,
"coverage": 0.5,
"text": "Maddie Griffin"
},
{
"row": 2,
"col": 0,
"coverage": 0,
"text": "RoadWork@dot.state.fl.us"
},
{
"row": 5,
"col": 0,
"coverage": 0,
"text": "Kayla.Mejia@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.7.1",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 308.95,
"r": 144.05225,
"b": 275.831
},
"text": "Contact Information\nProject Information",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.2",
"order": 20,
"type": "table_cell",
"bbox": {
"l": 28.8,
"t": 272.7429,
"r": 122.76,
"b": 253.7143
},
"text": "Maddie Griffin",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1
}
},
{
"id": "p1.7.3",
"order": 21,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 263.42600000000004,
"r": 114.6935,
"b": 250.33100000000002
},
"text": "727-575-8334",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.4",
"order": 22,
"type": "table_cell",
"bbox": {
"l": 28.8,
"t": 253.7143,
"r": 216.72,
"b": 234.6857
},
"text": "RoadWork@dot.state.fl.us",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2
}
},
{
"id": "p1.7.5",
"order": 23,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 231.17600000000004,
"r": 114.93725,
"b": 218.08100000000002
},
"text": "Media Contact",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.7.6",
"order": 24,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 218.42600000000004,
"r": 100.86725,
"b": 205.33100000000002
},
"text": "Kayla Mejia",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.7",
"order": 25,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 205.67600000000004,
"r": 114.6935,
"b": 192.58100000000002
},
"text": "813-975-6060",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.8",
"order": 26,
"type": "table_cell",
"bbox": {
"l": 28.8,
"t": 196.6286,
"r": 216.72,
"b": 177.6
},
"text": "Kayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 2
}
}
]
},
{
"id": "p1.8",
"order": 27,
"type": "figure",
"bbox": {
"l": 223.92,
"t": 663.84,
"r": 583.92,
"b": 518.4
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.9",
"order": 28,
"type": "heading",
"bbox": {
"l": 224.4,
"t": 507.84,
"r": 260.88,
"b": 492.96
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.10",
"order": 29,
"type": "text",
"bbox": {
"l": 223.68,
"t": 488.16,
"r": 577.92,
"b": 460.08
},
"text": "As of June 1, 2025, all construction activities associated with this project have been completed."
},
{
"id": "p1.11",
"order": 30,
"type": "text",
"bbox": {
"l": 224.16,
"t": 453.36,
"r": 563.52,
"b": 412.8
},
"text": "This project will repave SR 60 (Memorial Causeway) between the Clearwater Harbor Channel and the Memorial Causeway Bridge in Clearwater."
},
{
"id": "p1.12",
"order": 31,
"type": "text",
"bbox": {
"l": 224.4,
"t": 406.32,
"r": 557.52,
"b": 379.2
},
"text": "Construction is underway and expected to be complete in spring 2025."
},
{
"id": "p1.13",
"order": 32,
"type": "footer",
"bbox": {
"l": 252,
"t": 20.16,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 06/05/2025",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}