← Paul Test
doc11462 954.pdf_v_d02242025.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
39 item(s)
JSON
figure (4)
footer (1)
footnote (1)
header (1)
heading (3)
list (1)
list_item (5)
table (1)
table_cell (9)
text (12)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · HEADING
6 · TABLE
7
8
9
10
11
12
13
14
15
16 · TEXT
17 · TEXT
18 · TEXT
19 · TEXT
20 · TEXT
21 · TEXT
22 · TEXT
23 · TEXT
24 · TEXT
25 · FIGURE
26 · HEADING
27 · TEXT
28 · HEADING
29 · LIST
30
31
32
33
34
35 · TITLE
36 · TEXT
37 · TEXT
38 · FOOTNOTE
39 · FOOTER
Page 1 JSON
{
"document_id": 11462,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11572,
"item_count": 39,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 3,
"list": 1,
"list_item": 5,
"table": 1,
"table_cell": 9,
"text": 12,
"title": 1
},
"build_ms": 4,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.48,
"r": 117.36,
"b": 726.24
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.44,
"t": 761.28,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.52,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "heading",
"bbox": {
"l": 25.68,
"t": 705.84,
"r": 570.96,
"b": 671.76
},
"text": "I-75/I-275 Collector-Distributor Roadway from SR 56 to south of County Line Road 430573-2, 430573-3",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 662.4,
"r": 216.72,
"b": 429.12
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 5,
"n_cols": 2,
"integrity": {
"cells_checked": 9,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 639.35,
"r": 93.821,
"b": 626.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 639.35,
"r": 191.314,
"b": 613.505
},
"text": "New Road Construction",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 607.1,
"r": 67.64225,
"b": 574.505
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 607.1,
"r": 198.8515,
"b": 549.005
},
"text": "Design\nFrom south of County Line Road to SR 56",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 542.6,
"r": 73.076,
"b": 490.505
},
"text": "Length\nCity\nCounty",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 542.6,
"r": 201.78775,
"b": 477.755
},
"text": "3.9 miles\nWesley Chapel\nHillsborough Pasco",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 471.35,
"r": 61.6685,
"b": 458.255
},
"text": "Road",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 471.35,
"r": 156.4165,
"b": 432.755
},
"text": "I-275 I-75 SR 56",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 16,
"type": "text",
"bbox": {
"l": 31.2,
"t": 419.04,
"r": 141.84,
"b": 404.64
},
"text": "Contact Information"
},
{
"id": "p1.8",
"order": 17,
"type": "text",
"bbox": {
"l": 31.68,
"t": 398.16,
"r": 128.16,
"b": 385.44
},
"text": "Design Manager"
},
{
"id": "p1.9",
"order": 18,
"type": "text",
"bbox": {
"l": 34.56,
"t": 384.96,
"r": 129.6,
"b": 372.72
},
"text": "Dinyar Sharifabad"
},
{
"id": "p1.10",
"order": 19,
"type": "text",
"bbox": {
"l": 35.76,
"t": 373.2,
"r": 117.36,
"b": 360.24
},
"text": "(813) 975-6172"
},
{
"id": "p1.11",
"order": 20,
"type": "text",
"bbox": {
"l": 35.52,
"t": 360.24,
"r": 209.52,
"b": 346.56
},
"text": "Dinyar.Sharifabad@dot.state.fl.us"
},
{
"id": "p1.12",
"order": 21,
"type": "text",
"bbox": {
"l": 31.68,
"t": 340.8,
"r": 117.12,
"b": 327.84
},
"text": "Media Contact"
},
{
"id": "p1.13",
"order": 22,
"type": "text",
"bbox": {
"l": 41.28,
"t": 327.36,
"r": 102.48,
"b": 314.88
},
"text": "Kayla Mejia"
},
{
"id": "p1.14",
"order": 23,
"type": "text",
"bbox": {
"l": 41.28,
"t": 315.12,
"r": 116.16,
"b": 302.88
},
"text": "813-975-6060"
},
{
"id": "p1.15",
"order": 24,
"type": "text",
"bbox": {
"l": 40.8,
"t": 302.64,
"r": 182.88,
"b": 288.24
},
"text": "Kayla.Mejia@dot.state.fl.us"
},
{
"id": "p1.16",
"order": 25,
"type": "figure",
"bbox": {
"l": 221.76,
"t": 663.12,
"r": 583.68,
"b": 518.64
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.17",
"order": 26,
"type": "heading",
"bbox": {
"l": 224.64,
"t": 508.08,
"r": 261.6,
"b": 493.2
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.18",
"order": 27,
"type": "text",
"bbox": {
"l": 224.16,
"t": 488.16,
"r": 572.16,
"b": 434.4
},
"text": "This project will construct a 3-lane southbound Collector-Distributor (CD) road system from the SR 56 southbound on-ramp to the I-75 / I-275 apex to complement the northbound CD road system in Wesley Chapel."
},
{
"id": "p1.19",
"order": 28,
"type": "heading",
"bbox": {
"l": 226.32,
"t": 427.92,
"r": 297.84,
"b": 413.52
},
"text": "This includes:",
"level": 3
},
{
"id": "p1.20",
"order": 29,
"type": "list",
"bbox": {
"l": 244.8,
"t": 404.64,
"r": 578.16,
"b": 256.08
},
"text": "",
"attrs": {
"item_count": 5
},
"children": [
{
"id": "p1.20.1",
"order": 30,
"type": "list_item",
"bbox": {
"l": 245.04,
"t": 404.64,
"r": 568.32,
"b": 360.48
},
"text": "A new 2-lane southbound on-ramp from the CD roadway to southbound I-75, which will require widening the bridge over Cypress Creek.",
"marker": "-"
},
{
"id": "p1.20.2",
"order": 31,
"type": "list_item",
"bbox": {
"l": 244.8,
"t": 359.76,
"r": 547.2,
"b": 331.44
},
"text": "A new bridge over Cypress Creek for the southbound CD roadway",
"marker": "•"
},
{
"id": "p1.20.3",
"order": 32,
"type": "list_item",
"bbox": {
"l": 245.04,
"t": 330,
"r": 448.56,
"b": 315.6
},
"text": "A new fork of I-75 / I-275 southbound",
"marker": "•"
},
{
"id": "p1.20.4",
"order": 33,
"type": "list_item",
"bbox": {
"l": 245.28,
"t": 314.64,
"r": 569.28,
"b": 286.32
},
"text": "A new bridge for southbound I-275 over the CD road ramp to southbound I-75",
"marker": "-"
},
{
"id": "p1.20.5",
"order": 34,
"type": "list_item",
"bbox": {
"l": 245.04,
"t": 285.12,
"r": 578.16,
"b": 256.08
},
"text": "New concrete barrier wall separation between the southbound I-75 mainline lanes and the proposed southbound CD roadway.",
"marker": "-"
}
]
},
{
"id": "p1.21",
"order": 35,
"type": "title",
"bbox": {
"l": 244.8,
"t": 254.88,
"r": 535.68,
"b": 226.08
},
"text": "• A proposed ramp from the southbound CD roadway to southbound I-75.",
"level": 2
},
{
"id": "p1.22",
"order": 36,
"type": "text",
"bbox": {
"l": 224.88,
"t": 217.68,
"r": 574.08,
"b": 190.08
},
"text": "The project is currently in the design phase and has been combined with FPN 430573-3."
},
{
"id": "p1.23",
"order": 37,
"type": "text",
"bbox": {
"l": 225.36,
"t": 183.36,
"r": 414.48,
"b": 167.76
},
"text": "Construction is not currently funded."
},
{
"id": "p1.24",
"order": 38,
"type": "footnote",
"bbox": {
"l": 464.64,
"t": 533.52,
"r": 582.96,
"b": 519.6
},
"text": "Pebble Creek Map data ©2022",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.25",
"order": 39,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.4,
"r": 360,
"b": 9.12
},
"text": "Last Updated: 02/24/2025",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}