{
    "document_id": 11437,
    "page": 24,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 11548,
    "item_count": 11,
    "counts_by_type": {
        "list": 1,
        "list_item": 5,
        "text": 5
    },
    "build_ms": 1,
    "items": [
        {
            "id": "p24.1",
            "order": 1,
            "type": "text",
            "bbox": {
                "l": 88.08,
                "t": 719.28,
                "r": 528,
                "b": 690
            },
            "text": "access and sidewalks will remain closed. Weather can affect the schedule, and additional nights may be needed."
        },
        {
            "id": "p24.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 52.8,
                "t": 676.56,
                "r": 528.96,
                "b": 589.2
            },
            "text": "U.S 301 (S.R. 43) and Harrison Ranch Boulevard: Permit project: There will be intermittent east and westbound lane closures on U.S. 301 (S.R. 43) and Harrison Ranch Boulevard for intersection improvements, signals and turn lanes through October 31 during daytime/nighttime hours. Motorists should remain alert for daytime and nighttime lane closures, workers, equipment, and signage throughout the intersection."
        },
        {
            "id": "p24.3",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 52.8,
                "t": 575.04,
                "r": 528.96,
                "b": 505.2
            },
            "text": "U.S. 301 (S.R. 43) from North of Erie Road to North of Moccasin Wallow Road: Testing project: FDOT will have a mobile operation on October 26 as crews conduct a falling weight deflection test from 12:30 p.m. to 5 p.m. No lane closures are anticipated, but motorists are advised to be aware of lane changes and the potential for workers in or near the roadway."
        },
        {
            "id": "p24.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 52.56,
                "t": 498,
                "r": 528.48,
                "b": 358.56
            },
            "text": "U.S. 41/ State Road (S.R.) 45 from Edwards Drive to Magellan Drive: Construction project: The Florida Department of Transportation (FDOT) has begun milling and resurfacing U.S. 41/ S.R. 45 from Edwards Drive to Magellan Drive, U.S. 41/S.R. 45 from South of General Spaatz Boulevard to North of Edwards Drive and U.S. 41/S.R. 45 over Bowlees Creek Bridge. Improvements will also include median modifications, lighting, signalization, drainage, curb and gutter, and guardrail removal/replacement within the project limits. Part of the project will include median modifications to the center lane, where raised medians will be installed to increase safety and reduce conflict points along the corridor. The project spans just over 2.5 miles."
        },
        {
            "id": "p24.5",
            "order": 5,
            "type": "list",
            "bbox": {
                "l": 89.04,
                "t": 345.6702,
                "r": 528.48,
                "b": 123.84
            },
            "text": "",
            "attrs": {
                "item_count": 5
            },
            "children": [
                {
                    "id": "p24.5.1",
                    "order": 6,
                    "type": "list_item",
                    "bbox": {
                        "l": 89.04,
                        "t": 345.6702,
                        "r": 528.48,
                        "b": 286.32
                    },
                    "text": "Motorists should expect temporary median barriers to be in place while median modifications are underway. Watch for changes to traffic patterns, lane shifts, lane closures and the potential for construction vehicles entering/exiting the work areas."
                },
                {
                    "id": "p24.5.2",
                    "order": 7,
                    "type": "list_item",
                    "bbox": {
                        "l": 89.52,
                        "t": 273.91020000000003,
                        "r": 527.76,
                        "b": 241.92
                    },
                    "text": "Motorists can expect temporary daytime/overnight lane closures with lane shifts and the potential for uneven lanes throughout the project limits."
                },
                {
                    "id": "p24.5.3",
                    "order": 8,
                    "type": "list_item",
                    "bbox": {
                        "l": 89.52,
                        "t": 229.63019999999995,
                        "r": 528,
                        "b": 197.76
                    },
                    "text": "Motorists can expect typical construction sounds from construction equipment during daytime /overnight hours."
                },
                {
                    "id": "p24.5.4",
                    "order": 9,
                    "type": "list_item",
                    "bbox": {
                        "l": 89.52,
                        "t": 185.47019999999998,
                        "r": 527.76,
                        "b": 153.12
                    },
                    "text": "Pedestrians may encounter sidewalk construction and detours throughout the project. Please use caution and follow signage."
                },
                {
                    "id": "p24.5.5",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 89.04,
                        "t": 141.3102,
                        "r": 300.48,
                        "b": 123.84
                    },
                    "text": "Estimated completion is early 2028.",
                    "marker": "•"
                }
            ]
        },
        {
            "id": "p24.6",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 53.04,
                "t": 110.4,
                "r": 528.96,
                "b": 80.64
            },
            "text": "U.S. 41 (S.R. 45) from South of S Dock Street to just North of N Dock Street: Permit project: Seaport Manatee contractors will be constructing roadway improvements"
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}