← Paul Test
doc11431 1078.pdf_v_d05122026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
34 item(s)
JSON
figure (4)
footer (1)
header (1)
heading (1)
link (1)
list (1)
list_item (2)
table (1)
table_cell (13)
text (9)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TEXT
6 · TABLE
7
8
9
10
11
12
13
14
15
16
17
18
19
20 · TEXT
21 · TEXT
22 · TEXT
23 · FIGURE
24 · HEADING
25 · TEXT
26 · TEXT
27 · LIST
28
29
30 · TEXT
31 · TEXT
32 · TEXT
33 · FOOTER
34
Page 1 JSON
{
"document_id": 11431,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11542,
"item_count": 34,
"counts_by_type": {
"figure": 4,
"footer": 1,
"header": 1,
"heading": 1,
"link": 1,
"list": 1,
"list_item": 2,
"table": 1,
"table_cell": 13,
"text": 9
},
"build_ms": 4,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.72,
"r": 117.6,
"b": 726.24
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.2,
"t": 760.8,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.28,
"t": 773.52,
"r": 578.4,
"b": 716.88
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "text",
"bbox": {
"l": 25.92,
"t": 706.08,
"r": 568.32,
"b": 670.56
},
"text": "SR 580 (W Hillsborough Avenue) Operational Freight Improvements at SR 589 (Veterans Expressway) and Benjamin Road 254677-6-11"
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.56,
"t": 661.2,
"r": 216.96,
"b": 351.12
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 7,
"n_cols": 2,
"integrity": {
"cells_checked": 13,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 639.35,
"r": 93.821,
"b": 626.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 639.35,
"r": 200.449,
"b": 613.505
},
"text": "Operational Improvements",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 607.1,
"r": 67.64225,
"b": 574.505
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 607.1,
"r": 196.804,
"b": 523.505
},
"text": "Construction\nat SR 589 (Veterans Expressway) and Benjamin Road",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 517.1,
"r": 73.076,
"b": 465.005
},
"text": "City\nCounty\nRoad",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 517.1,
"r": 190.414,
"b": 452.255
},
"text": "Tampa\nHillsborough\nSR 580 SR 589",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 445.85,
"r": 105.971,
"b": 420.005
},
"text": "Construction Cost",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 445.85,
"r": 186.319,
"b": 432.755
},
"text": "$1.6 million",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.10",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 413.6,
"r": 97.81475,
"b": 387.755
},
"text": "Estimated Completion",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.11",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 413.6,
"r": 198.77275,
"b": 400.505
},
"text": "Summer 2026",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.12",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 381.35,
"r": 93.87725,
"b": 368.255
},
"text": "Contractor",
"attrs": {
"row": 6,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.13",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 381.35,
"r": 210.99025,
"b": 368.255
},
"text": "Cone & Graham, Inc.",
"attrs": {
"row": 6,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 20,
"type": "text",
"bbox": {
"l": 30.72,
"t": 342.24,
"r": 142.32,
"b": 326.88
},
"text": "Contact Information"
},
{
"id": "p1.8",
"order": 21,
"type": "text",
"bbox": {
"l": 31.44,
"t": 321.36,
"r": 197.52,
"b": 251.04
},
"text": "Project Information\nMaddie Griffin\n727-575-8334\nMaddie.Griffin@dot.state.fl.us\nMedia Contact"
},
{
"id": "p1.9",
"order": 22,
"type": "text",
"bbox": {
"l": 39.6,
"t": 252,
"r": 182.88,
"b": 210.72
},
"text": "Kayla Mejia\n813-975-6060\nKayla.Mejia@dot.state.fl.us"
},
{
"id": "p1.10",
"order": 23,
"type": "figure",
"bbox": {
"l": 223.2,
"t": 663.84,
"r": 583.68,
"b": 518.4
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.11",
"order": 24,
"type": "heading",
"bbox": {
"l": 224.4,
"t": 508.08,
"r": 261.12,
"b": 492.96
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.12",
"order": 25,
"type": "text",
"bbox": {
"l": 224.16,
"t": 488.4,
"r": 573.36,
"b": 433.92
},
"text": "The Florida Department of Transportation's Design-Build Firm, Cone & Graham, Inc., is making operational improvements by modifying the turning radii for freight trucks at two locations on SR 580 (W. Hillsborough Avenue) in Hillsborough County:"
},
{
"id": "p1.13",
"order": 26,
"type": "text",
"bbox": {
"l": 225.36,
"t": 428.16,
"r": 411.84,
"b": 412.56
},
"text": "Type of modifications and locations:"
},
{
"id": "p1.14",
"order": 27,
"type": "list",
"bbox": {
"l": 244.8,
"t": 405.12,
"r": 575.04,
"b": 314.88
},
"text": "",
"attrs": {
"item_count": 2
},
"children": [
{
"id": "p1.14.1",
"order": 28,
"type": "list_item",
"bbox": {
"l": 245.28,
"t": 405.12,
"r": 563.28,
"b": 360.72
},
"text": "at SR 589 (Veterans Expressway) - extension of the 580 (W. Hillsborough Avenue) right turn lane onto SR 589 (Veterans Expressway)",
"marker": "-"
},
{
"id": "p1.14.2",
"order": 29,
"type": "list_item",
"bbox": {
"l": 244.8,
"t": 359.76,
"r": 575.04,
"b": 314.88
},
"text": "at Benjamin Road - conversion of the southbound approach to dual left and dual right lane configuration onto 580 (W. Hillsborough Avenue).",
"marker": "-"
}
]
},
{
"id": "p1.15",
"order": 30,
"type": "text",
"bbox": {
"l": 224.64,
"t": 307.2,
"r": 552.96,
"b": 292.08
},
"text": "Construction activities are expected to complete summer 2026."
},
{
"id": "p1.16",
"order": 31,
"type": "text",
"bbox": {
"l": 224.64,
"t": 285.6,
"r": 577.68,
"b": 261.36
},
"text": "*****\n*****"
},
{
"id": "p1.17",
"order": 32,
"type": "text",
"bbox": {
"l": 224.64,
"t": 251.52,
"r": 577.68,
"b": 158.64
},
"text": "What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously."
},
{
"id": "p1.18",
"order": 33,
"type": "footer",
"bbox": {
"l": 30.72,
"t": 50.4,
"r": 580.08,
"b": 11.04
},
"text": "For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 254677-6-11)\nLast Updated: 05/12/2026",
"attrs": {
"block_label": "footer"
},
"children": [
{
"id": "p1.18.1",
"order": 34,
"type": "link",
"bbox": {
"l": 185.175,
"t": 34.458,
"r": 450.9,
"b": 21.363
},
"text": "FDOTtampabay.com (Project Number: 254677-6-11)",
"attrs": {
"uri": "https://fdottampabay.com/project/1078/254677-6-11",
"action_type": "/URI"
}
}
]
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}