{
    "document_id": 11428,
    "page": 27,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 11539,
    "item_count": 3,
    "counts_by_type": {
        "footer": 1,
        "text": 2
    },
    "build_ms": 0,
    "items": [
        {
            "id": "p27.1",
            "order": 1,
            "type": "text",
            "bbox": {
                "l": 60.48,
                "t": 720.72,
                "r": 537.12,
                "b": 624
            },
            "text": "6. A construction entrance shall be installed prior to commencement of grading. Location of the entrance may be adjusted by the contractor to facilitate grading operations. All construction traffic entering the paved road must cross the construction entrance. The construction entrance shall consist of a bed of 3/4\" gravel of the following minimum dimensions: 15' wide, 30' long and 12\" deep. The construction entrance shall be removed prior to placing base for paving."
        },
        {
            "id": "p27.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 301.2,
                "t": 90.72,
                "r": 336,
                "b": 75.36
            },
            "text": "Ⅱ-15",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p27.3",
            "order": 3,
            "type": "footer",
            "bbox": {
                "l": 11.28,
                "t": 104.16,
                "r": 42,
                "b": 74.64
            },
            "text": "",
            "attrs": {
                "block_label": "footer_image"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}