{
    "document_id": 11428,
    "page": 26,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 11539,
    "item_count": 15,
    "counts_by_type": {
        "footer": 1,
        "header": 1,
        "list": 2,
        "list_item": 9,
        "text": 2
    },
    "build_ms": 1,
    "items": [
        {
            "id": "p26.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 248.4,
                "t": 792,
                "r": 343.92,
                "b": 786.96
            },
            "text": "",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p26.2",
            "order": 2,
            "type": "list",
            "bbox": {
                "l": 108.72,
                "t": 718.8,
                "r": 492,
                "b": 670.08
            },
            "text": "",
            "attrs": {
                "item_count": 2
            },
            "children": [
                {
                    "id": "p26.2.1",
                    "order": 3,
                    "type": "list_item",
                    "bbox": {
                        "l": 108.72,
                        "t": 718.8,
                        "r": 492,
                        "b": 701.76
                    },
                    "text": "The following notes shall be placed on the Erosion Control plans:",
                    "marker": "3."
                },
                {
                    "id": "p26.2.2",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 137.28,
                        "t": 687.36,
                        "r": 489.12,
                        "b": 670.08
                    },
                    "text": "In case of emergency call _____",
                    "marker": "a."
                }
            ]
        },
        {
            "id": "p26.3",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 138.24,
                "t": 655.68,
                "r": 540.24,
                "b": 591.12
            },
            "text": "b. A standby crew for emergency work shall be available at all times.\nNecessary materials shall be available on-site and stockpiled at convenient locations to facilitate rapid construction of temporary devices or to repair any damaged erosion control measures."
        },
        {
            "id": "p26.4",
            "order": 6,
            "type": "list",
            "bbox": {
                "l": 67.2,
                "t": 576.72,
                "r": 540.72,
                "b": 150.96
            },
            "text": "",
            "attrs": {
                "item_count": 7
            },
            "children": [
                {
                    "id": "p26.4.1",
                    "order": 7,
                    "type": "list_item",
                    "bbox": {
                        "l": 140.64,
                        "t": 576.72,
                        "r": 540,
                        "b": 543.6
                    },
                    "text": "Erosion control devices shall not be moved or modified without the approval of the City Engineer.",
                    "marker": "c."
                },
                {
                    "id": "p26.4.2",
                    "order": 8,
                    "type": "list_item",
                    "bbox": {
                        "l": 137.28,
                        "t": 529.2,
                        "r": 540,
                        "b": 465.6
                    },
                    "text": "All removable protective devices shown shall be in place at the end of each working day in the period from October 1 through April 15, and at any other period when the weather forecast indicates a greater than 50% probability of rain.",
                    "marker": "d."
                },
                {
                    "id": "p26.4.3",
                    "order": 9,
                    "type": "list_item",
                    "bbox": {
                        "l": 136.08,
                        "t": 450.72,
                        "r": 540.48,
                        "b": 387.12
                    },
                    "text": "After a rainstorm, all silt and debris shall be removed from check berms and desiliting basins. Any graded slope surface protection measures damaged during the rainstorm shall also be repaired immediately.",
                    "marker": "e."
                },
                {
                    "id": "p26.4.4",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 141.12,
                        "t": 372.72,
                        "r": 540.24,
                        "b": 339.84
                    },
                    "text": "Fill slopes at the project perimeter must drain away from the top of the slope at the conclusion of each working day.",
                    "marker": "f."
                },
                {
                    "id": "p26.4.5",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 137.76,
                        "t": 325.44,
                        "r": 540,
                        "b": 278.64
                    },
                    "text": "A six-foot high perimeter fence or a 24-hour guard shall be posted on the site whenever the depth of water in any device exceeds 18 inches.",
                    "marker": "g."
                },
                {
                    "id": "p26.4.6",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 67.2,
                        "t": 263.04,
                        "r": 540.72,
                        "b": 214.8
                    },
                    "text": "Placement of devices to reduce erosion damage within the project must be shown on the plan. Stockpile locations for materials shall also be indicated on the drawing.",
                    "marker": "4."
                },
                {
                    "id": "p26.4.7",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 67.44,
                        "t": 199.92,
                        "r": 540.48,
                        "b": 150.96
                    },
                    "text": "Outlet conditions from the desilting basin shall not exceed downstream limitations. The overflow shall be designed to safely pass 1.5 times the 25-year peak discharge.",
                    "marker": "5."
                }
            ]
        },
        {
            "id": "p26.5",
            "order": 14,
            "type": "text",
            "bbox": {
                "l": 302.4,
                "t": 56.4,
                "r": 332.4,
                "b": 42.48
            },
            "text": "Π-14",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p26.6",
            "order": 15,
            "type": "footer",
            "bbox": {
                "l": 12.72,
                "t": 105.36,
                "r": 41.52,
                "b": 76.8
            },
            "text": "",
            "attrs": {
                "block_label": "footer_image"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}