← Paul Test
doc11363 284.pdf_v_d07312024.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
39 item(s)
JSON
figure (4)
footer (1)
footnote (1)
header (1)
heading (2)
table (2)
table_cell (21)
text (6)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TITLE
6 · TABLE
7
8
9
10
11
12
13
14
15
16
17
18
19
20 · TABLE
21
22
23
24
25
26
27
28
29 · FIGURE
30 · HEADING
31 · TEXT
32 · TEXT
33 · TEXT
34 · TEXT
35 · HEADING
36 · TEXT
37 · TEXT
38 · FOOTNOTE
39 · FOOTER
Table integrity:
3 of 8 cells don't match the text layer at their coordinates.
r1c0 (50%): “John McShaffrey”
r2c0 (0%): “roadwork@dot.state.fl.us”
r5c0 (0%): “Kayla.Mejia@dot.state.fl.us”
Page 1 JSON
{
"document_id": 11363,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11474,
"item_count": 39,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 2,
"table": 2,
"table_cell": 21,
"text": 6,
"title": 1
},
"build_ms": 6,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.72,
"r": 117.36,
"b": 726.24
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.68,
"t": 761.04,
"r": 320.88,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "title",
"bbox": {
"l": 27.6,
"t": 705.36,
"r": 575.04,
"b": 689.04
},
"text": "SR 52 Widening and New Alignment between Uradco Place and Fort King Road 435142-1-52-01",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 681.12,
"r": 216.72,
"b": 318.24
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 7,
"n_cols": 2,
"integrity": {
"cells_checked": 13,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 644.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 196.669,
"b": 618.755
},
"text": "Widening and New Road Construction",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 612.35,
"r": 67.64225,
"b": 579.755
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 612.35,
"r": 207.09775,
"b": 554.255
},
"text": "Completed\nFrom Uradco Place to west of Fort King Road",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 547.85,
"r": 105.6785,
"b": 495.755
},
"text": "Project Start\nLength\nCity",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 547.85,
"r": 208.4815,
"b": 483.005
},
"text": "November 2019\n7 miles\nDade City San Antonio",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 476.6,
"r": 105.971,
"b": 411.755
},
"text": "County\nRoad\nConstruction Cost",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 476.6,
"r": 183.1015,
"b": 424.505
},
"text": "Pasco\nSR 52\n$84 million",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.10",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 405.35,
"r": 97.81475,
"b": 379.505
},
"text": "Estimated Completion",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.11",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 405.35,
"r": 198.77275,
"b": 392.255
},
"text": "Summer 2024",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.12",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 373.1,
"r": 93.87725,
"b": 360.005
},
"text": "Contractor",
"attrs": {
"row": 6,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.13",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 373.1,
"r": 202.73275,
"b": 321.755
},
"text": "Superior Construction Company Southeast, LLC",
"attrs": {
"row": 6,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 20,
"type": "table",
"bbox": {
"l": 30.24,
"t": 308.4,
"r": 216.96,
"b": 178.08
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 6,
"n_cols": 2,
"integrity": {
"cells_checked": 8,
"cells_flagged": 3,
"flags": [
{
"row": 1,
"col": 0,
"coverage": 0.5,
"text": "John McShaffrey"
},
{
"row": 2,
"col": 0,
"coverage": 0,
"text": "roadwork@dot.state.fl.us"
},
{
"row": 5,
"col": 0,
"coverage": 0,
"text": "Kayla.Mejia@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.7.1",
"order": 21,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 307.45,
"r": 144.05225,
"b": 274.331
},
"text": "Contact Information\nProject Information",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.2",
"order": 22,
"type": "table_cell",
"bbox": {
"l": 30.24,
"t": 271.1657,
"r": 123.6,
"b": 252.5486
},
"text": "John McShaffrey",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1
}
},
{
"id": "p1.7.3",
"order": 23,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 261.92600000000004,
"r": 114.6935,
"b": 248.83100000000002
},
"text": "813-975-6930",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.4",
"order": 24,
"type": "table_cell",
"bbox": {
"l": 30.24,
"t": 252.5486,
"r": 216.96,
"b": 233.9314
},
"text": "roadwork@dot.state.fl.us",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2
}
},
{
"id": "p1.7.5",
"order": 25,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 229.67600000000004,
"r": 114.93725,
"b": 216.58100000000002
},
"text": "Media Contact",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.7.6",
"order": 26,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 216.92600000000004,
"r": 100.86725,
"b": 203.83100000000002
},
"text": "Kayla Mejia",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.7",
"order": 27,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 204.17600000000004,
"r": 114.6935,
"b": 191.08100000000002
},
"text": "813-975-6060",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.8",
"order": 28,
"type": "table_cell",
"bbox": {
"l": 30.24,
"t": 196.6971,
"r": 216.96,
"b": 178.08
},
"text": "Kayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 2
}
}
]
},
{
"id": "p1.8",
"order": 29,
"type": "figure",
"bbox": {
"l": 222.72,
"t": 681.6,
"r": 583.92,
"b": 536.64
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.9",
"order": 30,
"type": "heading",
"bbox": {
"l": 224.64,
"t": 525.84,
"r": 261.36,
"b": 511.68
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.10",
"order": 31,
"type": "text",
"bbox": {
"l": 223.92,
"t": 505.92,
"r": 571.68,
"b": 478.32
},
"text": "As of July 24, 2024, all work was completed and this project was final-accepted from the contractor."
},
{
"id": "p1.11",
"order": 32,
"type": "text",
"bbox": {
"l": 224.4,
"t": 471.36,
"r": 573.84,
"b": 430.32
},
"text": "This project widened and realigned SR 52 from Uradco Place to Fort King Road in eastern Pasco County. All work in the original project contract has been completed."
},
{
"id": "p1.12",
"order": 33,
"type": "text",
"bbox": {
"l": 224.4,
"t": 423.84,
"r": 576.72,
"b": 345.12
},
"text": "Tasks were added to improve safety and operations -- widening and drainage work was done on westbound SR 52 approaching I-75 to construct a low-profile 4-foot-wide concrete separator between the SR 52 thru-lanes and the lane leading to the southbound I-75 entrance ramp. Milling, repaving, and pavement markings were also done in this area to complete the project."
},
{
"id": "p1.13",
"order": 34,
"type": "text",
"bbox": {
"l": 224.64,
"t": 338.88,
"r": 576.96,
"b": 310.8
},
"text": "A development permit - not associated with the project - is installing a traffic signal at Pasco Road."
},
{
"id": "p1.14",
"order": 35,
"type": "heading",
"bbox": {
"l": 225.6,
"t": 304.08,
"r": 337.68,
"b": 288.72
},
"text": "Original project work:",
"level": 3
},
{
"id": "p1.15",
"order": 36,
"type": "text",
"bbox": {
"l": 244.8,
"t": 280.8,
"r": 563.52,
"b": 251.76
},
"text": "- Between Uradco Place and Bayou Branch Canal the existing road was widened to a four lane divided roadway."
},
{
"id": "p1.16",
"order": 37,
"type": "text",
"bbox": {
"l": 224.16,
"t": 250.8,
"r": 581.52,
"b": 106.08
},
"text": "• East of Bayou Branch Canal, the new alignment of four-lane\ndivided SR 52 was built south of the former SR 52 (now CR 52)\ntying into Clinton Avenue.\n• Clinton Avenue between CR 579 and Fort King Road was widened to a four-lane divided road.\nClinton Avenue between Pasadena Avenue and US 301 is now part of the new SR 52.\nThe section of the former SR 52 between Bayou Branch Canal (west of Mirada Blvd.) and US 301 is now designated CR 52."
},
{
"id": "p1.17",
"order": 38,
"type": "footnote",
"bbox": {
"l": 502.56,
"t": 546,
"r": 582.96,
"b": 537.36
},
"text": "Map data ©2024 Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.18",
"order": 39,
"type": "footer",
"bbox": {
"l": 251.52,
"t": 20.4,
"r": 360.48,
"b": 9.36
},
"text": "Last Updated: 07/31/2024",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}