← Paul Test
doc11348 1126.pdf_v_d08122026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
35 item(s)
JSON
figure (4)
footer (1)
footnote (1)
header (1)
heading (1)
list (1)
list_item (5)
table (1)
table_cell (7)
text (12)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TITLE
6 · TABLE
7
8
9
10
11
12
13
14 · TEXT
15 · TEXT
16 · TEXT
17 · TEXT
18 · TEXT
19 · TEXT
20 · TEXT
21 · TEXT
22 · TEXT
23 · FIGURE
24 · HEADING
25 · TEXT
26 · TEXT
27 · LIST
28
29
30
31
32
33 · TEXT
34 · FOOTNOTE
35 · FOOTER
Page 1 JSON
{
"document_id": 11348,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11458,
"item_count": 35,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 1,
"list": 1,
"list_item": 5,
"table": 1,
"table_cell": 7,
"text": 12,
"title": 1
},
"build_ms": 3,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.24,
"r": 117.6,
"b": 726.48
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 126.72,
"t": 761.04,
"r": 321.36,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "title",
"bbox": {
"l": 27.36,
"t": 705.84,
"r": 531.84,
"b": 671.76
},
"text": "Highland Avenue Corridor Improvements from Violet Street to US 92 (Hillsborough Avenue) 440511-4-52-01",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 29.04,
"t": 659.373,
"r": 216.96,
"b": 416.4
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 4,
"n_cols": 2,
"integrity": {
"cells_checked": 7,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 639.35,
"r": 93.821,
"b": 626.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 639.35,
"r": 201.8665,
"b": 613.505
},
"text": "Urban Corridor Improvements",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 607.1,
"r": 67.64225,
"b": 574.505
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 607.1,
"r": 203.3965,
"b": 510.755
},
"text": "Design\nHighland Avenue from Violet Street to US 92 (Hillsborough Avenue)",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 504.35,
"r": 73.076,
"b": 432.755
},
"text": "Length\nCity\nCounty\nRoad",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 504.35,
"r": 190.414,
"b": 420.005
},
"text": "0.3 miles\nTampa\nHillsborough\nHighland Avenue",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.7",
"order": 14,
"type": "text",
"bbox": {
"l": 30.72,
"t": 406.08,
"r": 141.84,
"b": 391.68
},
"text": "Contact Information"
},
{
"id": "p1.8",
"order": 15,
"type": "text",
"bbox": {
"l": 31.44,
"t": 385.44,
"r": 127.44,
"b": 372.72
},
"text": "Design Manager"
},
{
"id": "p1.9",
"order": 16,
"type": "text",
"bbox": {
"l": 34.8,
"t": 372.72,
"r": 101.28,
"b": 360
},
"text": "Carlos Perez"
},
{
"id": "p1.10",
"order": 17,
"type": "text",
"bbox": {
"l": 35.28,
"t": 360,
"r": 109.44,
"b": 347.76
},
"text": "813-975-6929"
},
{
"id": "p1.11",
"order": 18,
"type": "text",
"bbox": {
"l": 35.28,
"t": 347.52,
"r": 188.88,
"b": 333.84
},
"text": "CarlosH.Perez@dot.state.fl.us"
},
{
"id": "p1.12",
"order": 19,
"type": "text",
"bbox": {
"l": 31.68,
"t": 327.84,
"r": 117.12,
"b": 315.36
},
"text": "Media Contact"
},
{
"id": "p1.13",
"order": 20,
"type": "text",
"bbox": {
"l": 41.52,
"t": 314.88,
"r": 102.48,
"b": 301.92
},
"text": "Kayla Mejia"
},
{
"id": "p1.14",
"order": 21,
"type": "text",
"bbox": {
"l": 41.28,
"t": 302.16,
"r": 116.16,
"b": 289.92
},
"text": "813-975-6060"
},
{
"id": "p1.15",
"order": 22,
"type": "text",
"bbox": {
"l": 41.04,
"t": 289.68,
"r": 182.64,
"b": 276
},
"text": "Kayla.Mejia@dot.state.fl.us"
},
{
"id": "p1.16",
"order": 23,
"type": "figure",
"bbox": {
"l": 222.24,
"t": 662.64,
"r": 583.44,
"b": 519.12
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.17",
"order": 24,
"type": "heading",
"bbox": {
"l": 224.64,
"t": 507.84,
"r": 261.12,
"b": 493.2
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.18",
"order": 25,
"type": "text",
"bbox": {
"l": 224.16,
"t": 487.92,
"r": 554.4,
"b": 460.32
},
"text": "This project will improve the urban corridor on Highland Avenue from Violet Street to US 92 (Hillsborough Avenue) in Tampa."
},
{
"id": "p1.19",
"order": 26,
"type": "text",
"bbox": {
"l": 224.88,
"t": 453.6,
"r": 491.28,
"b": 438.24
},
"text": "Key improvements within the project limits include:"
},
{
"id": "p1.20",
"order": 27,
"type": "list",
"bbox": {
"l": 244.8,
"t": 430.32,
"r": 579.12,
"b": 340.32
},
"text": "",
"attrs": {
"item_count": 5
},
"children": [
{
"id": "p1.20.1",
"order": 28,
"type": "list_item",
"bbox": {
"l": 244.8,
"t": 430.32,
"r": 579.12,
"b": 415.92
},
"text": "Add 8 foot sidewalk along the western side of Highland Avenue",
"marker": "•"
},
{
"id": "p1.20.2",
"order": 29,
"type": "list_item",
"bbox": {
"l": 245.04,
"t": 414.96,
"r": 447.84,
"b": 401.04
},
"text": "Adding a crosswalk at Wilder Avenue",
"marker": "•"
},
{
"id": "p1.20.3",
"order": 30,
"type": "list_item",
"bbox": {
"l": 245.04,
"t": 399.6,
"r": 456.96,
"b": 385.92
},
"text": "Adding a crosswalk at Giddens Avenue",
"marker": "•"
},
{
"id": "p1.20.4",
"order": 31,
"type": "list_item",
"bbox": {
"l": 245.52,
"t": 384.48,
"r": 400.56,
"b": 371.28
},
"text": "Restore roadway pavement",
"marker": "•"
},
{
"id": "p1.20.5",
"order": 32,
"type": "list_item",
"bbox": {
"l": 244.8,
"t": 370.08,
"r": 577.44,
"b": 340.32
},
"text": "Upgrading the corridor lighting, ADA, pavement markings, and signage",
"marker": "•"
}
]
},
{
"id": "p1.21",
"order": 33,
"type": "text",
"bbox": {
"l": 225.6,
"t": 332.64,
"r": 525.6,
"b": 317.52
},
"text": "Construction is currently anticipated to begin in late 2027."
},
{
"id": "p1.22",
"order": 34,
"type": "footnote",
"bbox": {
"l": 503.04,
"t": 528,
"r": 582.24,
"b": 519.6
},
"text": "Map data ©2025 Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.23",
"order": 35,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.16,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 08/12/2026",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}