← Paul Test
doc11280 503.pdf_v_d08012024.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
30 item(s)
JSON
figure (4)
footer (1)
footnote (1)
heading (1)
table (2)
table_cell (16)
text (4)
title (1)
1 · FIGURE
2 · FIGURE
3 · FIGURE
4 · TITLE
5 · TABLE
6
7
8
9
10
11
12
13
14
15
16
17
18
19 · TABLE
20
21
22
23 · FIGURE
24 · HEADING
25 · TEXT
26 · TEXT
27 · TEXT
28 · TEXT
29 · FOOTNOTE
30 · FOOTER
Table integrity:
1 of 13 cells don't match the text layer at their coordinates.
r1c1 (50%): “Median Modifications”
Table integrity:
1 of 3 cells don't match the text layer at their coordinates.
r1c0 (25%): “Maddie Pfingsten 727-575-8334 roadwork@dot.state.fl.us”
Page 1 JSON
{
"document_id": 11280,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11391,
"item_count": 30,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"heading": 1,
"table": 2,
"table_cell": 16,
"text": 4,
"title": 1
},
"build_ms": 5,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.48,
"r": 117.6,
"b": 726.48
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "figure",
"bbox": {
"l": 27.6,
"t": 767.52,
"r": 323.04,
"b": 724.08
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "title",
"bbox": {
"l": 27.84,
"t": 705.36,
"r": 554.64,
"b": 689.52
},
"text": "US 92 (4th Street N.) Median Modifications from 30th Ave N. to 94th Ave N. 439401-1-52-01",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.5",
"order": 5,
"type": "table",
"bbox": {
"l": 28.8,
"t": 679.44,
"r": 216.72,
"b": 357.84
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 7,
"n_cols": 2,
"integrity": {
"cells_checked": 13,
"cells_flagged": 1,
"flags": [
{
"row": 1,
"col": 1,
"coverage": 0.5,
"text": "Median Modifications"
}
]
}
},
"children": [
{
"id": "p1.5.1",
"order": 6,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.5.2",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 644.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.3",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 122.76,
"t": 652.64,
"r": 216.72,
"b": 625.84
},
"text": "Median Modifications",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1
}
},
{
"id": "p1.5.4",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 625.1,
"r": 67.64225,
"b": 592.505
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.5",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 625.1,
"r": 199.864,
"b": 567.005
},
"text": "Completed\nfrom 30th Ave N. to 94th Ave N.",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.6",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 560.6,
"r": 105.6785,
"b": 469.505
},
"text": "Project Start\nLength\nCity\nCounty\nRoad",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.7",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 560.6,
"r": 199.099,
"b": 456.755
},
"text": "April 24, 2023\n4 miles\nSt. Petersburg\nPinellas\n4th Street US 92",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.8",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 450.35,
"r": 105.971,
"b": 424.505
},
"text": "Construction Cost",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.9",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 450.35,
"r": 186.319,
"b": 437.255
},
"text": "$7.1 million",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.10",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 418.1,
"r": 97.81475,
"b": 392.255
},
"text": "Estimated Completion",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.11",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 418.1,
"r": 198.77275,
"b": 405.005
},
"text": "Summer 2024",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.12",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 385.85,
"r": 93.87725,
"b": 372.755
},
"text": "Contractor",
"attrs": {
"row": 6,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.13",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 385.85,
"r": 174.13525,
"b": 360.005
},
"text": "Preferred Materials",
"attrs": {
"row": 6,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.6",
"order": 19,
"type": "table",
"bbox": {
"l": 28.8,
"t": 347.52,
"r": 216.96,
"b": 214.32
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 3,
"n_cols": 2,
"integrity": {
"cells_checked": 3,
"cells_flagged": 1,
"flags": [
{
"row": 1,
"col": 0,
"coverage": 0.25,
"text": "Maddie Pfingsten 727-575-8334 roadwork@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.6.1",
"order": 20,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 345.7,
"r": 144.05225,
"b": 312.581
},
"text": "Contact Information\nProject Information",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.2",
"order": 21,
"type": "table_cell",
"bbox": {
"l": 28.8,
"t": 294.24,
"r": 216.96,
"b": 267.6
},
"text": "Maddie Pfingsten 727-575-8334 roadwork@dot.state.fl.us",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 2
}
},
{
"id": "p1.6.3",
"order": 22,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 267.92600000000004,
"r": 114.93725,
"b": 229.33100000000002
},
"text": "Media Contact\nKayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.7",
"order": 23,
"type": "figure",
"bbox": {
"l": 222.96,
"t": 681.36,
"r": 583.2,
"b": 536.64
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.8",
"order": 24,
"type": "heading",
"bbox": {
"l": 224.88,
"t": 525.84,
"r": 261.36,
"b": 511.44
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.9",
"order": 25,
"type": "text",
"bbox": {
"l": 224.16,
"t": 506.16,
"r": 580.56,
"b": 478.08
},
"text": "As of July 25, 2024, all construction activities associated with this project have been completed."
},
{
"id": "p1.10",
"order": 26,
"type": "text",
"bbox": {
"l": 224.4,
"t": 471.12,
"r": 558.72,
"b": 430.08
},
"text": "This project includes extending left turn lane storage at nine signalized intersections and 15 left turn lanes at existing median openings along the corridor."
},
{
"id": "p1.11",
"order": 27,
"type": "text",
"bbox": {
"l": 224.4,
"t": 423.6,
"r": 578.64,
"b": 332.4
},
"text": "Some existing median openings will be modified, lengthening the left turn lane storage, and others will be closed. Additionally, nine mid-block pedestrian crossings will be built. The median closures and turn lane extensions will improve safety and traffic flow. The new crosswalks with pedestrian signals will allow pedestrians to cross US 92 (4th St. N) at designated locations more safely. U-turn locations are available throughout the corridor to access businesses."
},
{
"id": "p1.12",
"order": 28,
"type": "text",
"bbox": {
"l": 224.64,
"t": 325.92,
"r": 577.92,
"b": 299.52
},
"text": "Construction is underway and anticipated to be complete in summer 2024."
},
{
"id": "p1.13",
"order": 29,
"type": "footnote",
"bbox": {
"l": 505.92,
"t": 546.96,
"r": 583.2,
"b": 537.12
},
"text": "Map data ©2024 INEGI",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.14",
"order": 30,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.16,
"r": 360.24,
"b": 9.6
},
"text": "Last Updated: 08/01/2024",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}