← Paul Test
doc11274 55.pdf_v_d08182020.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
29 item(s)
JSON
figure (4)
footer (1)
footnote (1)
header (1)
heading (2)
table (1)
table_cell (15)
text (3)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TITLE
6 · TABLE
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22 · FIGURE
23 · HEADING
24 · HEADING
25 · TEXT
26 · TEXT
27 · TEXT
28 · FOOTNOTE
29 · FOOTER
Page 1 JSON
{
"document_id": 11274,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11385,
"item_count": 29,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 2,
"table": 1,
"table_cell": 15,
"text": 3,
"title": 1
},
"build_ms": 4,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.48,
"r": 117.6,
"b": 726.24
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.44,
"t": 761.04,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.52,
"t": 773.28,
"r": 578.16,
"b": 716.4
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "title",
"bbox": {
"l": 27.6,
"t": 705.36,
"r": 507.36,
"b": 689.52
},
"text": "SR 56 New Roadway Extension from Meadow Pointe Blvd to US 301 434765-1-52-01",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 29.04,
"t": 677.373,
"r": 217.68,
"b": 214.8
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 9,
"n_cols": 2,
"integrity": {
"cells_checked": 15,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 644.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 198.48025,
"b": 631.505
},
"text": "New Roadway Project",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 625.1,
"r": 67.64225,
"b": 592.505
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 625.1,
"r": 208.6615,
"b": 567.005
},
"text": "Completed\nMeadow Pointe Boulevard to US 301",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 560.6,
"r": 105.6785,
"b": 508.505
},
"text": "Project Start\nLength\nCity",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 560.6,
"r": 201.78775,
"b": 495.755
},
"text": "February 2017\n6 miles\nWesley Chapel Zephyrhills",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 489.35,
"r": 105.971,
"b": 424.505
},
"text": "County\nRoad\nConstruction Cost",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 489.35,
"r": 183.1015,
"b": 437.255
},
"text": "Pasco\nSR 56\n$60 million",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.10",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 418.1,
"r": 97.81475,
"b": 392.255
},
"text": "Estimated Completion",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.11",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 418.1,
"r": 177.87025,
"b": 405.005
},
"text": "Late 2019",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.12",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 385.85,
"r": 93.87725,
"b": 372.755
},
"text": "Contractor",
"attrs": {
"row": 6,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.13",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 385.85,
"r": 210.99025,
"b": 372.755
},
"text": "Cone & Graham, Inc.",
"attrs": {
"row": 6,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.14",
"order": 20,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 345.7,
"r": 144.05225,
"b": 287.081
},
"text": "Contact Information\nProject Information Greg Deese, P.E. 813-975-3563 gregory.deese@dot.state.fl.us",
"attrs": {
"row": 7,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.15",
"order": 21,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 267.92600000000004,
"r": 114.93725,
"b": 229.33100000000002
},
"text": "Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 8,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 22,
"type": "figure",
"bbox": {
"l": 222.72,
"t": 681.36,
"r": 583.44,
"b": 536.64
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.8",
"order": 23,
"type": "heading",
"bbox": {
"l": 224.4,
"t": 525.84,
"r": 261.36,
"b": 511.68
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.9",
"order": 24,
"type": "heading",
"bbox": {
"l": 224.4,
"t": 505.92,
"r": 545.28,
"b": 491.52
},
"text": "THIS PROJECT WAS ACCEPTED ON NOVEMBER 25, 2019.",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.10",
"order": 25,
"type": "text",
"bbox": {
"l": 223.92,
"t": 483.84,
"r": 571.2,
"b": 430.56
},
"text": "Cone and Graham, Inc., on behalf of the Florida Department of Transportation, began construction on the $60 million extension of SR 56 between Meadow Pointe Blvd and US 301 in southeastern Pasco County in February 2017."
},
{
"id": "p1.11",
"order": 26,
"type": "text",
"bbox": {
"l": 224.4,
"t": 424.08,
"r": 577.2,
"b": 370.56
},
"text": "The new six-mile long, four-lane divided roadway includes a ten-foot wide multi-use trail on the south side of the road, a five-foot wide sidewalk on the north side of the road and seven-foot wide bicycle lanes on the shoulders in each direction."
},
{
"id": "p1.12",
"order": 27,
"type": "text",
"bbox": {
"l": 223.92,
"t": 363.84,
"r": 575.28,
"b": 324.72
},
"text": "There are new signalized intersections on Morris Bridge Road where the new SR 56 crosses it and on US 301 where the new SR 56 ties into it."
},
{
"id": "p1.13",
"order": 28,
"type": "footnote",
"bbox": {
"l": 502.32,
"t": 546.72,
"r": 582.48,
"b": 537.36
},
"text": "Map data ©2020 Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.14",
"order": 29,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.16,
"r": 360.24,
"b": 9.6
},
"text": "Last Updated: 08/18/2020",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}