← Paul Test
doc11265 866.pdf_v_d05302023.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
32 item(s)
JSON
figure (4)
footer (1)
header (1)
heading (2)
table (2)
table_cell (18)
text (4)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · HEADING
6 · TABLE
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22 · TABLE
23
24
25
26 · FIGURE
27 · HEADING
28 · TEXT
29 · TEXT
30 · TEXT
31 · TEXT
32 · FOOTER
Table integrity:
1 of 15 cells don't match the text layer at their coordinates.
r5c1 (0%): “$680,000”
Table integrity:
1 of 3 cells don't match the text layer at their coordinates.
r1c0 (40%): “Maddie Pfingsten 727-575- 8334 roadwork@dot.state.fl.us”
Page 1 JSON
{
"document_id": 11265,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11376,
"item_count": 32,
"counts_by_type": {
"figure": 4,
"footer": 1,
"header": 1,
"heading": 2,
"table": 2,
"table_cell": 18,
"text": 4
},
"build_ms": 3,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.48,
"r": 117.6,
"b": 725.76
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.2,
"t": 761.04,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 522,
"t": 773.28,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "heading",
"bbox": {
"l": 24.96,
"t": 705.84,
"r": 532.32,
"b": 671.76
},
"text": "Alt US 19 (5th Ave N.) Urban Corridor Improvements from 4th St. to west of 6th St.\n448221-1-52-01",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 661.44,
"r": 216.96,
"b": 346.08
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 8,
"n_cols": 2,
"integrity": {
"cells_checked": 15,
"cells_flagged": 1,
"flags": [
{
"row": 5,
"col": 1,
"coverage": 0,
"text": "$680,000"
}
]
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 639.35,
"r": 93.821,
"b": 626.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 639.35,
"r": 201.8665,
"b": 613.505
},
"text": "Urban Corridor Improvements",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 607.1,
"r": 67.64225,
"b": 574.505
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 607.1,
"r": 207.52525,
"b": 561.755
},
"text": "Completed\nbetween 4th St. to west 6th St.",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 555.35,
"r": 105.6785,
"b": 542.255
},
"text": "Project Start",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 555.35,
"r": 186.69025,
"b": 529.505
},
"text": "October 31, 2022",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 523.1,
"r": 73.076,
"b": 471.005
},
"text": "City\nCounty\nRoad",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 523.1,
"r": 199.099,
"b": 445.505
},
"text": "St. Petersburg\nPinellas\n5th Avenue North Alt US 19",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.10",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 439.1,
"r": 105.971,
"b": 413.255
},
"text": "Construction Cost",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.11",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 122.88,
"t": 432.0873,
"r": 216.96,
"b": 403.4182
},
"text": "$680,000",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1
}
},
{
"id": "p1.6.12",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 406.85,
"r": 97.81475,
"b": 381.005
},
"text": "Estimated Completion",
"attrs": {
"row": 6,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.13",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 406.85,
"r": 198.77275,
"b": 393.755
},
"text": "Summer 2023",
"attrs": {
"row": 6,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.14",
"order": 20,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 374.6,
"r": 93.87725,
"b": 361.505
},
"text": "Contractor",
"attrs": {
"row": 7,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.15",
"order": 21,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 374.6,
"r": 194.18275,
"b": 348.755
},
"text": "Blacktip Services, Inc.",
"attrs": {
"row": 7,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 22,
"type": "table",
"bbox": {
"l": 28.8,
"t": 336.24,
"r": 216.48,
"b": 203.52
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 3,
"n_cols": 2,
"integrity": {
"cells_checked": 3,
"cells_flagged": 1,
"flags": [
{
"row": 1,
"col": 0,
"coverage": 0.4,
"text": "Maddie Pfingsten 727-575- 8334 roadwork@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.7.1",
"order": 23,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 334.45,
"r": 144.05225,
"b": 301.331
},
"text": "Contact Information\nProject Information",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.2",
"order": 24,
"type": "table_cell",
"bbox": {
"l": 28.8,
"t": 283.152,
"r": 216.48,
"b": 256.608
},
"text": "Maddie Pfingsten 727-575- 8334 roadwork@dot.state.fl.us",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 2
}
},
{
"id": "p1.7.3",
"order": 25,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 256.67600000000004,
"r": 114.93725,
"b": 218.08100000000002
},
"text": "Media Contact\nKayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.8",
"order": 26,
"type": "figure",
"bbox": {
"l": 222.72,
"t": 663.36,
"r": 583.68,
"b": 519.12
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.9",
"order": 27,
"type": "heading",
"bbox": {
"l": 224.88,
"t": 507.6,
"r": 260.88,
"b": 493.44
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.10",
"order": 28,
"type": "text",
"bbox": {
"l": 224.4,
"t": 487.68,
"r": 558,
"b": 460.8
},
"text": "As of April 20, 2023, all construction activities associated with this project have been completed."
},
{
"id": "p1.11",
"order": 29,
"type": "text",
"bbox": {
"l": 224.64,
"t": 452.88,
"r": 554.16,
"b": 413.04
},
"text": "This project will provide urban corridor improvements along 5th Avenue North between 4th Street and 6th Street to enhance pedestrian safety."
},
{
"id": "p1.12",
"order": 30,
"type": "text",
"bbox": {
"l": 224.16,
"t": 405.84,
"r": 580.32,
"b": 340.08
},
"text": "These improvements will include repaving the roadway to accommodate lane reductions, curb extensions at three intersections, two new pedestrian crosswalks with Rectangular Rapid Flashing Beacons, and a ten-foot wide concrete sidewalk on the southside of the roadway from 5th Street North to 6th Street North."
},
{
"id": "p1.13",
"order": 31,
"type": "text",
"bbox": {
"l": 224.64,
"t": 332.88,
"r": 571.2,
"b": 306.72
},
"text": "Construction is currently underway and is expected to be complete in summer 2023."
},
{
"id": "p1.14",
"order": 32,
"type": "footer",
"bbox": {
"l": 252,
"t": 19.92,
"r": 360,
"b": 9.6
},
"text": "Last Updated: 05/30/2023",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}