← Paul Test
doc11256 760.pdf_v_d10282024.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
31 item(s)
JSON
caption (1)
figure (4)
footer (1)
footnote (1)
header (1)
heading (3)
table (2)
table_cell (16)
text (2)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · HEADING
6 · TABLE
7
8
9
10
11
12
13
14
15
16
17
18
19
20 · TABLE
21
22
23
24 · CAPTION
25 · FIGURE
26 · HEADING
27 · HEADING
28 · TEXT
29 · TEXT
30 · FOOTNOTE
31 · FOOTER
Table integrity:
1 of 3 cells don't match the text layer at their coordinates.
r1c0 (25%): “John McShaffrey\n813-975-6930\nroadwork@dot.state.fl.us”
Page 1 JSON
{
"document_id": 11256,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11367,
"item_count": 31,
"counts_by_type": {
"caption": 1,
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 3,
"table": 2,
"table_cell": 16,
"text": 2
},
"build_ms": 4,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.48,
"r": 117.6,
"b": 726
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.2,
"t": 761.04,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.4,
"b": 716.88
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "heading",
"bbox": {
"l": 25.44,
"t": 706.32,
"r": 540.96,
"b": 671.52
},
"text": "SR 44 (Gulf to Lake Hwy) Repaving from Norvell Bryant Hwy to west of N Lopp Point\n432582-1-52-01",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.56,
"t": 662.4,
"r": 216.96,
"b": 299.76
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 7,
"n_cols": 2,
"integrity": {
"cells_checked": 13,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 639.35,
"r": 93.821,
"b": 587.255
},
"text": "Work Type\nPhase\nLimits",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 639.35,
"r": 205.489,
"b": 549.005
},
"text": "Repaving\nCompleted\nfrom Norvell\\nBryant Hwy to\\nwest of N. Lopp\\nPoint",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 542.6,
"r": 105.6785,
"b": 529.505
},
"text": "Project Start",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 542.6,
"r": 186.69025,
"b": 516.755
},
"text": "October 14,\\n2023",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 510.35,
"r": 72.65975,
"b": 477.755
},
"text": "Length\nCity",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 510.35,
"r": 191.7865,
"b": 465.005
},
"text": "2.4 miles\nCrystal River\\nLecanto",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 458.6,
"r": 73.076,
"b": 426.005
},
"text": "County\nRoad",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 458.6,
"r": 211.41775,
"b": 400.505
},
"text": "Citrus\nGulf To Lake\\nHighway (Citrus)\\nSR 44",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.10",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 394.1,
"r": 105.971,
"b": 368.255
},
"text": "Construction Cost",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.11",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 394.1,
"r": 186.319,
"b": 381.005
},
"text": "$5.9 million",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.12",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 361.85,
"r": 97.81475,
"b": 316.505
},
"text": "Estimated Completion\nContractor",
"attrs": {
"row": 6,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.13",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 361.85,
"r": 202.1365,
"b": 303.755
},
"text": "September 16,\\n2024\nSuperior Asphalt, Inc.",
"attrs": {
"row": 6,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.7",
"order": 20,
"type": "table",
"bbox": {
"l": 28.8,
"t": 292.08,
"r": 216.48,
"b": 157.92
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 3,
"n_cols": 2,
"integrity": {
"cells_checked": 3,
"cells_flagged": 1,
"flags": [
{
"row": 1,
"col": 0,
"coverage": 0.25,
"text": "John McShaffrey\\n813-975-6930\\nroadwork@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.7.1",
"order": 21,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 289.45,
"r": 144.05225,
"b": 256.331
},
"text": "Contact Information\nProject Information",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.2",
"order": 22,
"type": "table_cell",
"bbox": {
"l": 28.8,
"t": 238.416,
"r": 216.48,
"b": 211.584
},
"text": "John McShaffrey\\n813-975-6930\\nroadwork@dot.state.fl.us",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 2
}
},
{
"id": "p1.7.3",
"order": 23,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 211.67600000000004,
"r": 114.93725,
"b": 173.08100000000002
},
"text": "Media Contact\nKayla Mejia\\n813-975-6060\\nKayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.8",
"order": 24,
"type": "caption",
"bbox": {
"l": 276.24,
"t": 659.52,
"r": 288.96,
"b": 649.68
},
"text": "44",
"attrs": {
"block_label": "figure_title"
}
},
{
"id": "p1.9",
"order": 25,
"type": "figure",
"bbox": {
"l": 222.72,
"t": 663.6,
"r": 583.44,
"b": 518.64
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.10",
"order": 26,
"type": "heading",
"bbox": {
"l": 224.64,
"t": 507.84,
"r": 260.88,
"b": 493.44
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.11",
"order": 27,
"type": "heading",
"bbox": {
"l": 224.64,
"t": 487.68,
"r": 573.36,
"b": 460.8
},
"text": "This project was accepted from the contractor as completed on October 17, 2024.",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.12",
"order": 28,
"type": "text",
"bbox": {
"l": 224.64,
"t": 453.36,
"r": 553.44,
"b": 425.52
},
"text": "This project milled and resurfaced SR 44 (Gulf to Lake Highway) between Norvell Bryant Highway and North Lopp Point."
},
{
"id": "p1.13",
"order": 29,
"type": "text",
"bbox": {
"l": 224.4,
"t": 418.8,
"r": 567.36,
"b": 340.32
},
"text": "Other work included safety improvements such as sidewalk connectivity, sidewalk repairs, curb ramp reconstruction, and pedestrian lighting installed at signalized intersections. Signing, pavement markings, and minor drainage improvements were also done throughout the project area and signalization upgrades were made at N Rock Crusher Road."
},
{
"id": "p1.14",
"order": 30,
"type": "footnote",
"bbox": {
"l": 502.56,
"t": 528.72,
"r": 582.96,
"b": 519.12
},
"text": "Map data ©2024 Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.15",
"order": 31,
"type": "footer",
"bbox": {
"l": 252,
"t": 20.16,
"r": 360.24,
"b": 9.6
},
"text": "Last Updated: 10/28/2024",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}