← Paul Test
doc11217 480.pdf_v_d11072022.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
30 item(s)
JSON
figure (4)
footer (1)
footnote (1)
header (1)
heading (2)
list (1)
list_item (4)
table (1)
table_cell (9)
text (5)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TITLE
6 · TABLE
7
8
9
10
11
12
13
14
15
16 · TEXT
17 · TEXT
18 · FIGURE
19 · HEADING
20 · TEXT
21 · TEXT
22 · HEADING
23 · LIST
24
25
26
27
28 · TEXT
29 · FOOTNOTE
30 · FOOTER
Page 1 JSON
{
"document_id": 11217,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11328,
"item_count": 30,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 2,
"list": 1,
"list_item": 4,
"table": 1,
"table_cell": 9,
"text": 5,
"title": 1
},
"build_ms": 4,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.48,
"r": 117.6,
"b": 726.48
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.2,
"t": 760.8,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.52,
"t": 773.28,
"r": 578.16,
"b": 716.4
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "title",
"bbox": {
"l": 27.6,
"t": 705.12,
"r": 495.84,
"b": 689.28
},
"text": "Morris Bridge Road Repaving from Davis Road to Fletcher Avenue 439532-1-52-01",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 29.04,
"t": 677.373,
"r": 216.72,
"b": 389.28
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 5,
"n_cols": 2,
"integrity": {
"cells_checked": 9,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 605.255
},
"text": "Work Type\nPhase\nLimits",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 210.979,
"b": 579.755
},
"text": "Repaving\nCompleted\nfrom Davis Road to Fletcher Avenue",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 573.35,
"r": 105.971,
"b": 469.505
},
"text": "Project Start\nLength\nCity\nCounty\nConstruction Cost",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 573.35,
"r": 206.55775,
"b": 482.255
},
"text": "March 2021\n2.2 miles\nTemple Terrace\nHillsborough\n$4.5 million",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 463.1,
"r": 97.81475,
"b": 437.255
},
"text": "Estimated Completion",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 463.1,
"r": 177.87025,
"b": 450.005
},
"text": "Late 2022",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 430.85,
"r": 93.87725,
"b": 417.755
},
"text": "Contractor",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 430.85,
"r": 201.45025,
"b": 392.255
},
"text": "Ranger Construction Industries, Inc.",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 16,
"type": "text",
"bbox": {
"l": 30.96,
"t": 378.48,
"r": 142.32,
"b": 363.84
},
"text": "Contact Information"
},
{
"id": "p1.8",
"order": 17,
"type": "text",
"bbox": {
"l": 31.44,
"t": 359.76,
"r": 213.84,
"b": 247.68
},
"text": "Project Information\nAndrew Williams\n813-612-3200\nAndrew.Williams@dot.state.fl.us\nMedia Contact\nKayla Mejia\n813-975-6060\nKayla.Mejia@dot.state.fl.us"
},
{
"id": "p1.9",
"order": 18,
"type": "figure",
"bbox": {
"l": 222.48,
"t": 681.12,
"r": 583.44,
"b": 536.88
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.10",
"order": 19,
"type": "heading",
"bbox": {
"l": 224.88,
"t": 525.84,
"r": 261.36,
"b": 511.44
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.11",
"order": 20,
"type": "text",
"bbox": {
"l": 224.16,
"t": 505.92,
"r": 564.72,
"b": 478.08
},
"text": "As of Monday, October 31, 2022, all construction activities associated with this project have been completed."
},
{
"id": "p1.12",
"order": 21,
"type": "text",
"bbox": {
"l": 224.64,
"t": 449.76,
"r": 563.04,
"b": 422.16
},
"text": "This project repaved Morris Bridge Road between Davis Road and Fletcher Avenue in Temple Terrace."
},
{
"id": "p1.13",
"order": 22,
"type": "heading",
"bbox": {
"l": 225.6,
"t": 414.72,
"r": 337.68,
"b": 400.32
},
"text": "Other improvements:",
"level": 3
},
{
"id": "p1.14",
"order": 23,
"type": "list",
"bbox": {
"l": 244.8,
"t": 391.44,
"r": 569.52,
"b": 257.52
},
"text": "",
"attrs": {
"item_count": 4
},
"children": [
{
"id": "p1.14.1",
"order": 24,
"type": "list_item",
"bbox": {
"l": 245.28,
"t": 391.44,
"r": 549.12,
"b": 363.12
},
"text": "added a six-foot sidewalk along the west side of the road between Davis Road and Fowler Avenue",
"marker": "•"
},
{
"id": "p1.14.2",
"order": 25,
"type": "list_item",
"bbox": {
"l": 245.52,
"t": 361.68,
"r": 569.52,
"b": 318.72
},
"text": "widened the roadway between Fowler Avenue and Fletcher Avenue to provide five-foot paved shoulders on both sides of the road",
"marker": "-"
},
{
"id": "p1.14.3",
"order": 26,
"type": "list_item",
"bbox": {
"l": 245.76,
"t": 316.8,
"r": 519.6,
"b": 288.24
},
"text": "added an eight-foot-wide shared-use path between Fisherman's Point and 127th Avenue",
"marker": "•"
},
{
"id": "p1.14.4",
"order": 27,
"type": "list_item",
"bbox": {
"l": 244.8,
"t": 287.28,
"r": 562.8,
"b": 257.52
},
"text": "eliminated the gaps in the existing sidewalk between 127th Avenue and Fletcher Avenue",
"marker": "-"
}
]
},
{
"id": "p1.15",
"order": 28,
"type": "text",
"bbox": {
"l": 224.64,
"t": 249.6,
"r": 564.24,
"b": 209.28
},
"text": "Project numbers 439532-1 and 439532-2 were combined into a single construction contract. All updates for both project numbers will be posted on this page."
},
{
"id": "p1.16",
"order": 29,
"type": "footnote",
"bbox": {
"l": 527.52,
"t": 546.48,
"r": 582.72,
"b": 537.84
},
"text": "Map data ©2022",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.17",
"order": 30,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.4,
"r": 359.76,
"b": 9.36
},
"text": "Last Updated: 11/07/2022",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}