← Paul Test
doc11215 353.pdf_v_d12032021.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
34 item(s)
JSON
figure (4)
footer (1)
footnote (1)
header (1)
heading (1)
table (2)
table_cell (19)
text (4)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TITLE
6 · TABLE
7
8
9
10
11
12
13
14
15
16
17
18 · TABLE
19
20
21
22
23
24
25
26
27 · FIGURE
28 · HEADING
29 · TEXT
30 · TEXT
31 · TEXT
32 · TEXT
33 · FOOTNOTE
34 · FOOTER
Table integrity:
2 of 8 cells don't match the text layer at their coordinates.
r2c0 (0%): “Anna.Geismar@dot.state.fl.us”
r5c0 (0%): “Kayla.Mejia@dot.state.fl.us”
Page 1 JSON
{
"document_id": 11215,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11326,
"item_count": 34,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 1,
"table": 2,
"table_cell": 19,
"text": 4,
"title": 1
},
"build_ms": 3,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.48,
"r": 117.6,
"b": 726.48
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.2,
"t": 761.04,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "title",
"bbox": {
"l": 27.36,
"t": 705.12,
"r": 542.64,
"b": 689.04
},
"text": "I-75 Northbound Rest Area Replacement in southern Hillsborough County 437638-1-52-01",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 29.04,
"t": 678.24,
"r": 217.2,
"b": 389.52
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 6,
"n_cols": 2,
"integrity": {
"cells_checked": 11,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 644.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 193.84525,
"b": 631.505
},
"text": "Rest Area Replacement",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 625.1,
"r": 67.64225,
"b": 592.505
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 625.1,
"r": 190.414,
"b": 554.255
},
"text": "Completed\nI-75 NB Rest Area in Hillsborough County",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 547.85,
"r": 105.971,
"b": 444.005
},
"text": "Project Start\nCity\nCounty\nRoad\nConstruction Cost",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 547.85,
"r": 192.754,
"b": 456.755
},
"text": "June 2019\nRuskin\nHillsborough\nI-75\n$17.5 million",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 437.6,
"r": 97.81475,
"b": 411.755
},
"text": "Estimated Completion",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 437.6,
"r": 173.48275,
"b": 424.505
},
"text": "Fall 2021",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.10",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 405.35,
"r": 93.87725,
"b": 392.255
},
"text": "Contractor",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.11",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 405.35,
"r": 195.78025,
"b": 392.255
},
"text": "PCS Civil, Inc.",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 18,
"type": "table",
"bbox": {
"l": 28.32,
"t": 379.2,
"r": 217.44,
"b": 246
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 6,
"n_cols": 2,
"integrity": {
"cells_checked": 8,
"cells_flagged": 2,
"flags": [
{
"row": 2,
"col": 0,
"coverage": 0,
"text": "Anna.Geismar@dot.state.fl.us"
},
{
"row": 5,
"col": 0,
"coverage": 0,
"text": "Kayla.Mejia@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.7.1",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 377.95,
"r": 144.05225,
"b": 344.831
},
"text": "Contact Information\nProject Information",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.2",
"order": 20,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 345.176,
"r": 114.56975,
"b": 332.081
},
"text": "Anna Geismar",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.3",
"order": 21,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 332.426,
"r": 114.6935,
"b": 319.331
},
"text": "813-975-3553",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.4",
"order": 22,
"type": "table_cell",
"bbox": {
"l": 28.32,
"t": 322.1143,
"r": 217.44,
"b": 303.0857
},
"text": "Anna.Geismar@dot.state.fl.us",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2
}
},
{
"id": "p1.7.5",
"order": 23,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 300.176,
"r": 114.93725,
"b": 287.081
},
"text": "Media Contact",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.7.6",
"order": 24,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 287.426,
"r": 100.86725,
"b": 274.331
},
"text": "Kayla Mejia",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.7",
"order": 25,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 274.67600000000004,
"r": 114.6935,
"b": 261.581
},
"text": "813-975-6060",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.8",
"order": 26,
"type": "table_cell",
"bbox": {
"l": 28.32,
"t": 265.0286,
"r": 217.44,
"b": 246
},
"text": "Kayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 2
}
}
]
},
{
"id": "p1.8",
"order": 27,
"type": "figure",
"bbox": {
"l": 223.44,
"t": 681.84,
"r": 583.44,
"b": 536.64
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.9",
"order": 28,
"type": "heading",
"bbox": {
"l": 225.12,
"t": 525.84,
"r": 261.12,
"b": 511.68
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.10",
"order": 29,
"type": "text",
"bbox": {
"l": 224.16,
"t": 506.16,
"r": 571.68,
"b": 478.08
},
"text": "As of Wednesday, November 3, 2021, all construction activities associated with this project have been completed."
},
{
"id": "p1.11",
"order": 30,
"type": "text",
"bbox": {
"l": 226.08,
"t": 471.12,
"r": 364.32,
"b": 456.72
},
"text": "The rest area is now open!"
},
{
"id": "p1.12",
"order": 31,
"type": "text",
"bbox": {
"l": 225.12,
"t": 450,
"r": 559.92,
"b": 421.68
},
"text": "This design-build project is replaced the existing northbound I-75 rest area at mile marker 238 in Hillsborough County."
},
{
"id": "p1.13",
"order": 32,
"type": "text",
"bbox": {
"l": 224.64,
"t": 414.96,
"r": 578.64,
"b": 374.16
},
"text": "Improvements included the demolition of the existing structures and the construction of new buildings, parking areas, dog parks, picnic pavilions, lighting, and other improvements."
},
{
"id": "p1.14",
"order": 33,
"type": "footnote",
"bbox": {
"l": 526.32,
"t": 546.48,
"r": 582.48,
"b": 537.36
},
"text": "Map data ©2021",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.15",
"order": 34,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.16,
"r": 358.8,
"b": 9.36
},
"text": "Last Updated: 12/03/2021",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}