← Paul Test
doc11203 456.pdf_v_d08012023.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
34 item(s)
JSON
figure (4)
footer (1)
header (1)
heading (2)
list (1)
list_item (4)
table (2)
table_cell (15)
text (3)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TEXT
6 · TABLE
7
8
9
10
11
12
13
14
15
16 · TABLE
17
18
19
20
21
22
23 · FIGURE
24 · HEADING
25 · TEXT
26 · TEXT
27 · HEADING
28 · LIST
29
30
31
32
33 · TITLE
34 · FOOTER
Table integrity:
2 of 6 cells don't match the text layer at their coordinates.
r1c1 (0%): “813-975-6204 roadwork@dot.state.fl.us”
r3c1 (0%): “813-975-6060 Kayla.Mejia@dot.state.fl.us”
Page 1 JSON
{
"document_id": 11203,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11314,
"item_count": 34,
"counts_by_type": {
"figure": 4,
"footer": 1,
"header": 1,
"heading": 2,
"list": 1,
"list_item": 4,
"table": 2,
"table_cell": 15,
"text": 3,
"title": 1
},
"build_ms": 5,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.48,
"r": 117.6,
"b": 725.76
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.2,
"t": 760.8,
"r": 320.88,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "text",
"bbox": {
"l": 26.4,
"t": 705.84,
"r": 573.6,
"b": 670.56
},
"text": "US 301 Repaving from Lake St Charles Blvd to Progress Blvd/Bloomingdale Ave & NB I-75\nOn-ramp Improvements 441388-1-52-01"
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 659.373,
"r": 216.96,
"b": 318.96
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 5,
"n_cols": 2,
"integrity": {
"cells_checked": 9,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.511,
"t": 639.66936,
"r": 88.0389,
"b": 592.22918
},
"text": "Work Type\nPhase\nLimits",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.505,
"t": 639.66936,
"r": 212.901085,
"b": 510.95218
},
"text": "Repaving\nCompleted\nfrom Lake St Charles Blvd to Progress Blvd/Bloomingdale Avenue and the northbound I-75 On-ramp from US 301",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.511,
"t": 505.11936,
"r": 99.1035,
"b": 392.79418
},
"text": "Project Start\nLength\nCity\nCounty\nRoad\nConstruction Cost",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.505,
"t": 505.11936,
"r": 196.84717,
"b": 404.40518
},
"text": "August 4, 2021\n1.5 miles\nRiverview\nHillsborough\nUS 301\n$21.4 million",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.511,
"t": 386.96136,
"r": 91.675875,
"b": 363.42518
},
"text": "Estimated Completion",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.505,
"t": 386.96136,
"r": 191.980795,
"b": 375.03618
},
"text": "Summer 2023",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.511,
"t": 357.59236,
"r": 88.090125,
"b": 345.66718
},
"text": "Contractor",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.505,
"t": 357.59236,
"r": 183.805285,
"b": 322.44518
},
"text": "Ajax Paving Industries of Florida, LLC",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 16,
"type": "table",
"bbox": {
"l": 30.24,
"t": 310.32,
"r": 217.2,
"b": 180.48
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 4,
"n_cols": 2,
"integrity": {
"cells_checked": 6,
"cells_flagged": 2,
"flags": [
{
"row": 1,
"col": 1,
"coverage": 0,
"text": "813-975-6204 roadwork@dot.state.fl.us"
},
{
"row": 3,
"col": 1,
"coverage": 0,
"text": "813-975-6060 Kayla.Mejia@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.7.1",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 308.393,
"r": 144.05225,
"b": 275.275
},
"text": "Contact Information\nProject Information",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.2",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 275.62,
"r": 135.506,
"b": 262.525
},
"text": "Maricelle Venegas",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.3",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 123.72,
"t": 258.384,
"r": 217.2,
"b": 232.416
},
"text": "813-975-6204 roadwork@dot.state.fl.us",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1
}
},
{
"id": "p1.7.4",
"order": 20,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 230.62,
"r": 114.93725,
"b": 217.52499999999998
},
"text": "Media Contact",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.7.5",
"order": 21,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 217.87,
"r": 100.86725,
"b": 204.77499999999998
},
"text": "Kayla Mejia",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.6",
"order": 22,
"type": "table_cell",
"bbox": {
"l": 123.72,
"t": 206.448,
"r": 217.2,
"b": 180.48
},
"text": "813-975-6060 Kayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1
}
}
]
},
{
"id": "p1.8",
"order": 23,
"type": "figure",
"bbox": {
"l": 222.72,
"t": 664.08,
"r": 583.68,
"b": 519.12
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.9",
"order": 24,
"type": "heading",
"bbox": {
"l": 224.64,
"t": 507.84,
"r": 260.88,
"b": 493.2
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.10",
"order": 25,
"type": "text",
"bbox": {
"l": 223.92,
"t": 487.68,
"r": 568.32,
"b": 459.6
},
"text": "All construction activities associated with this project were completed on Friday, July 28, 2023."
},
{
"id": "p1.11",
"order": 26,
"type": "text",
"bbox": {
"l": 224.64,
"t": 453.36,
"r": 570.72,
"b": 413.52
},
"text": "This design-build project repaved US 301 between Lake St. Charles Boulevard and Progress Boulevard/Bloomingdale Avenue in Riverview."
},
{
"id": "p1.12",
"order": 27,
"type": "heading",
"bbox": {
"l": 225.36,
"t": 406.08,
"r": 359.76,
"b": 391.2
},
"text": "Additional improvements:",
"level": 3
},
{
"id": "p1.13",
"order": 28,
"type": "list",
"bbox": {
"l": 245.28,
"t": 382.8,
"r": 573.12,
"b": 292.8
},
"text": "",
"attrs": {
"item_count": 4
},
"children": [
{
"id": "p1.13.1",
"order": 29,
"type": "list_item",
"bbox": {
"l": 245.76,
"t": 382.8,
"r": 573.12,
"b": 338.88
},
"text": "replaced the asphalt pavement with a durable concrete surface at the intersection of US 301 and Progress Boulevard/Bloomindale Avenue.",
"marker": "•"
},
{
"id": "p1.13.2",
"order": 30,
"type": "list_item",
"bbox": {
"l": 245.28,
"t": 337.92,
"r": 557.28,
"b": 323.28
},
"text": "added a through lane to westbound Bloomingdale Avenue.",
"marker": "•"
},
{
"id": "p1.13.3",
"order": 31,
"type": "list_item",
"bbox": {
"l": 245.28,
"t": 322.56,
"r": 494.16,
"b": 308.64
},
"text": "added sidewalk along the east side of US 301.",
"marker": "•"
},
{
"id": "p1.13.4",
"order": 32,
"type": "list_item",
"bbox": {
"l": 245.28,
"t": 307.92,
"r": 521.52,
"b": 292.8
},
"text": "widened the northbound I-75 on-ramp from US 301.",
"marker": "•"
}
]
},
{
"id": "p1.14",
"order": 33,
"type": "title",
"bbox": {
"l": 224.88,
"t": 285.36,
"r": 572.16,
"b": 258.48
},
"text": "This project was combined with 427454-3 into a single construction contract.",
"level": 2
},
{
"id": "p1.15",
"order": 34,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.4,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 08/01/2023",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}