← Paul Test
doc11183 996.pdf_v_d02102026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
30 item(s)
JSON
figure (4)
footer (1)
footnote (2)
heading (1)
link (1)
table (2)
table_cell (17)
text (1)
title (1)
1 · FIGURE
2 · FIGURE
3 · FIGURE
4 · TITLE
5 · TABLE
6
7
8
9
10
11
12
13
14
15
16
17 · FIGURE
18 · HEADING
19 · TEXT
20 · TABLE
21
22
23
24
25
26
27 · FOOTNOTE
28 · FOOTNOTE
29 · FOOTER
30
Table integrity:
2 of 6 cells don't match the text layer at their coordinates.
r1c1 (0%): “john.mcshaffrey@dot.state.fl.us”
r3c1 (0%): “Kayla.Mejia@dot.state.fl.us”
Page 1 JSON
{
"document_id": 11183,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11294,
"item_count": 30,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 2,
"heading": 1,
"link": 1,
"table": 2,
"table_cell": 17,
"text": 1,
"title": 1
},
"build_ms": 3,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.48,
"r": 117.6,
"b": 726.24
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "figure",
"bbox": {
"l": 28.08,
"t": 766.56,
"r": 322.8,
"b": 726.72
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.16,
"b": 716.4
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "title",
"bbox": {
"l": 27.6,
"t": 705.36,
"r": 508.8,
"b": 689.28
},
"text": "SR 39 Repaving from north of Central Avenue to US 301 (Gall Blvd.) 447951-1-52-01",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.5",
"order": 5,
"type": "table",
"bbox": {
"l": 28.8,
"t": 679.44,
"r": 217.2,
"b": 331.2
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 6,
"n_cols": 2,
"integrity": {
"cells_checked": 11,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.5.1",
"order": 6,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.5.2",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 605.255
},
"text": "Work Type\nPhase\nLimits",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.3",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 207.05275,
"b": 554.255
},
"text": "Resurfacing\nConstruction\nSR 39 from north of Central Avenue to US 301/Gall Boulevard",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.4",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 547.85,
"r": 105.6785,
"b": 534.755
},
"text": "Project Start",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.5",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 547.85,
"r": 192.24775,
"b": 522.005
},
"text": "December 1, 2025",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.6",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 515.6,
"r": 105.971,
"b": 411.755
},
"text": "Length\nCity\nCounty\nRoad\nConstruction Cost",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.7",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 515.6,
"r": 203.49775,
"b": 424.505
},
"text": "2.769 Miles\nCrystal Springs\nPasco\nSR 39\n$5.2 million",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.5.8",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 405.35,
"r": 97.81475,
"b": 379.505
},
"text": "Estimated Completion",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.9",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 405.35,
"r": 173.48275,
"b": 392.255
},
"text": "Fall 2026",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.10",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 373.1,
"r": 93.87725,
"b": 360.005
},
"text": "Contractor",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.5.11",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 373.1,
"r": 197.569,
"b": 334.505
},
"text": "Pigott Asphalt and Sitework LLC",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.6",
"order": 17,
"type": "figure",
"bbox": {
"l": 223.44,
"t": 681.36,
"r": 583.44,
"b": 536.88
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.7",
"order": 18,
"type": "heading",
"bbox": {
"l": 224.88,
"t": 525.84,
"r": 261.12,
"b": 511.68
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.8",
"order": 19,
"type": "text",
"bbox": {
"l": 225.12,
"t": 420.96,
"r": 428.16,
"b": 405.6
},
"text": "Construction began in December 2025."
},
{
"id": "p1.9",
"order": 20,
"type": "table",
"bbox": {
"l": 28.56,
"t": 322.32,
"r": 217.2,
"b": 188.88
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 4,
"n_cols": 2,
"integrity": {
"cells_checked": 6,
"cells_flagged": 2,
"flags": [
{
"row": 1,
"col": 1,
"coverage": 0,
"text": "john.mcshaffrey@dot.state.fl.us"
},
{
"row": 3,
"col": 1,
"coverage": 0,
"text": "Kayla.Mejia@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.9.1",
"order": 21,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 320.2,
"r": 144.05225,
"b": 287.081
},
"text": "Contact Information\nProject Information",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.9.2",
"order": 22,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 287.426,
"r": 114.6935,
"b": 261.581
},
"text": "John McShaffrey\\n813-975-6930",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.9.3",
"order": 23,
"type": "table_cell",
"bbox": {
"l": 122.88,
"t": 268.944,
"r": 217.2,
"b": 242.256
},
"text": "john.mcshaffrey@dot.state.fl.us",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1
}
},
{
"id": "p1.9.4",
"order": 24,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 242.42600000000004,
"r": 114.93725,
"b": 229.33100000000002
},
"text": "Media Contact",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.9.5",
"order": 25,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 229.67600000000004,
"r": 114.6935,
"b": 203.83100000000002
},
"text": "Kayla Mejia\\n813-975-6060",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.9.6",
"order": 26,
"type": "table_cell",
"bbox": {
"l": 122.88,
"t": 215.568,
"r": 217.2,
"b": 188.88
},
"text": "Kayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1
}
}
]
},
{
"id": "p1.10",
"order": 27,
"type": "footnote",
"bbox": {
"l": 502.32,
"t": 546.48,
"r": 582.72,
"b": 537.36
},
"text": "Map data ©2025 Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.11",
"order": 28,
"type": "footnote",
"bbox": {
"l": 223.92,
"t": 506.16,
"r": 578.4,
"b": 425.28
},
"text": "Improvement to this roadway segment will include milling and resurfacing, minor widening and drainage upgrades, sidewalk repairs/minor reconstruction, curb and gutter repairs/minor reconstruction, signing and pavement markings, traffic signal head replacements/enhancements at Chancey Road, and performing general safety upgrades along SR 39 in Pasco County.",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.12",
"order": 29,
"type": "footer",
"bbox": {
"l": 30.96,
"t": 50.16,
"r": 580.56,
"b": 11.52
},
"text": "For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 447951-1-52-01)\nLast Updated: 02/10/2026",
"attrs": {
"block_label": "footer"
},
"children": [
{
"id": "p1.12.1",
"order": 30,
"type": "link",
"bbox": {
"l": 176.912,
"t": 34.458,
"r": 459.163,
"b": 21.363
},
"text": "FDOTtampabay.com (Project Number: 447951-1-52-01)",
"attrs": {
"uri": "https://fdottampabay.com/project/996/447951-1-52-01",
"action_type": "/URI"
}
}
]
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}