← Paul Test
doc11149 457.pdf_v_d05172023.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
31 item(s)
JSON
figure (4)
footer (1)
header (1)
heading (2)
table (2)
table_cell (16)
text (5)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · HEADING
6 · TABLE
7
8
9
10
11
12
13
14
15
16
17
18
19
20 · TABLE
21
22
23
24 · FIGURE
25 · HEADING
26 · TEXT
27 · TEXT
28 · TEXT
29 · TEXT
30 · TEXT
31 · FOOTER
Table integrity:
1 of 13 cells don't match the text layer at their coordinates.
r3c1 (57%): “From Old PascoRoad to BoyetteRd on OverpassRoad”
Table integrity:
1 of 3 cells don't match the text layer at their coordinates.
r1c0 (25%): “John McShaffrey\n813-975-6930\nroadwork@dot.state.fl.us”
Page 1 JSON
{
"document_id": 11149,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11260,
"item_count": 31,
"counts_by_type": {
"figure": 4,
"footer": 1,
"header": 1,
"heading": 2,
"table": 2,
"table_cell": 16,
"text": 5
},
"build_ms": 4,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.48,
"r": 117.6,
"b": 726.24
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.44,
"t": 761.04,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.52,
"t": 773.28,
"r": 578.16,
"b": 716.4
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "heading",
"bbox": {
"l": 26.88,
"t": 704.88,
"r": 338.88,
"b": 689.04
},
"text": "I-75 at Overpass Road New Interchange 432734-2-52-01",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 29.04,
"t": 679.92,
"r": 217.2,
"b": 357.36
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 7,
"n_cols": 2,
"integrity": {
"cells_checked": 13,
"cells_flagged": 1,
"flags": [
{
"row": 3,
"col": 1,
"coverage": 0.57,
"text": "From Old PascoRoad to BoyetteRd on OverpassRoad"
}
]
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 644.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 187.88275,
"b": 631.505
},
"text": "New Interchange",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 625.1,
"r": 67.19225,
"b": 612.005
},
"text": "Phase",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 625.1,
"r": 182.07775,
"b": 612.005
},
"text": "Completed",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 605.6,
"r": 67.64225,
"b": 592.505
},
"text": "Limits",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 123.12,
"t": 599.28,
"r": 217.2,
"b": 572.4
},
"text": "From Old PascoRoad to BoyetteRd on OverpassRoad",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 547.85,
"r": 105.971,
"b": 424.505
},
"text": "Project Start\nLength\nCity\nCounty\nRoad\nConstruction Cost",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 547.85,
"r": 201.78775,
"b": 437.255
},
"text": "October 2020\n.9 miles\nWesley Chapel\nPasco\nI-75\n$65 million",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.10",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 418.1,
"r": 97.81475,
"b": 392.255
},
"text": "Estimated Completion",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.11",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 418.1,
"r": 188.49025,
"b": 405.005
},
"text": "Spring 2023",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.12",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 385.85,
"r": 93.87725,
"b": 372.755
},
"text": "Contractor",
"attrs": {
"row": 6,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.13",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 385.85,
"r": 199.8415,
"b": 360.005
},
"text": "The Middlesex Corporation",
"attrs": {
"row": 6,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 20,
"type": "table",
"bbox": {
"l": 28.32,
"t": 347.28,
"r": 217.2,
"b": 214.32
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 3,
"n_cols": 2,
"integrity": {
"cells_checked": 3,
"cells_flagged": 1,
"flags": [
{
"row": 1,
"col": 0,
"coverage": 0.25,
"text": "John McShaffrey\\n813-975-6930\\nroadwork@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.7.1",
"order": 21,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 345.7,
"r": 144.05225,
"b": 312.581
},
"text": "Contact Information\nProject Information",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.2",
"order": 22,
"type": "table_cell",
"bbox": {
"l": 28.32,
"t": 294.096,
"r": 217.2,
"b": 267.504
},
"text": "John McShaffrey\\n813-975-6930\\nroadwork@dot.state.fl.us",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 2
}
},
{
"id": "p1.7.3",
"order": 23,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 267.92600000000004,
"r": 114.93725,
"b": 229.33100000000002
},
"text": "Media Contact\nKayla Mejia\\n813-975-6060\\nKayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.8",
"order": 24,
"type": "figure",
"bbox": {
"l": 223.44,
"t": 681.6,
"r": 583.44,
"b": 536.88
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.9",
"order": 25,
"type": "heading",
"bbox": {
"l": 224.88,
"t": 525.84,
"r": 261.36,
"b": 511.44
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.10",
"order": 26,
"type": "text",
"bbox": {
"l": 224.16,
"t": 506.4,
"r": 574.32,
"b": 478.08
},
"text": "As of May 15, 2023, all work was completed and this project was final-accepted from the contractor."
},
{
"id": "p1.11",
"order": 27,
"type": "text",
"bbox": {
"l": 224.64,
"t": 471.36,
"r": 576.96,
"b": 430.8
},
"text": "This design-build project constructed a new interstate interchange on I-75 at Overpass Road, approximately 3.5 miles south of SR 52 in Pasco County."
},
{
"id": "p1.12",
"order": 28,
"type": "text",
"bbox": {
"l": 225.12,
"t": 424.08,
"r": 524.16,
"b": 396
},
"text": "The new diamond interchange includes a flyover ramp for westbound Overpass Road access onto southbound I-75."
},
{
"id": "p1.13",
"order": 29,
"type": "text",
"bbox": {
"l": 224.4,
"t": 389.52,
"r": 577.68,
"b": 323.04
},
"text": "To accommodate the new interchange, Overpass Road was widened from two lanes to four lanes between the interstate and Old Pasco Road and six lanes between the interstate and Boyette Road. Blair Drive was realigned to connect with Old Pasco Road. McKendree Road was realigned to connect with Boyette Road."
},
{
"id": "p1.14",
"order": 30,
"type": "text",
"bbox": {
"l": 224.64,
"t": 317.28,
"r": 575.28,
"b": 263.04
},
"text": "Sidewalks were built along Overpass Road. A 10-foot wide sidewalk was constructed on the north side of Overpass Road (next to the westbound traffic lanes) and a 6-foot wide sidewalk was built on the south side (next to the eastbound traffic lanes)."
},
{
"id": "p1.15",
"order": 31,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.16,
"r": 360.24,
"b": 9.36
},
"text": "Last Updated: 05/17/2023",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}