← Paul Test
doc11147 1237.pdf_v_d07242026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
22 item(s)
JSON
figure (4)
footer (1)
footnote (1)
header (1)
heading (3)
table (2)
table_cell (7)
text (3)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · HEADING
6 · TABLE
7
8
9
10
11
12 · TABLE
13
14
15 · FIGURE
16
17 · HEADING
18 · TEXT
19 · TEXT
20 · TEXT
21 · FOOTNOTE
22 · FOOTER
Page 1 JSON
{
"document_id": 11147,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11258,
"item_count": 22,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 3,
"table": 2,
"table_cell": 7,
"text": 3
},
"build_ms": 2,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.48,
"r": 117.6,
"b": 725.76
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 126.96,
"t": 761.04,
"r": 321.36,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.52,
"t": 773.52,
"r": 578.16,
"b": 716.88
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "heading",
"bbox": {
"l": 25.44,
"t": 705.84,
"r": 550.08,
"b": 671.52
},
"text": "SR 582 (Fowler Avenue) Resurfacing from east of Florida Avenue to west of Nebraska Avenue 455591-1-52-01",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 660.72,
"r": 217.2,
"b": 443.04
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 3,
"n_cols": 2,
"integrity": {
"cells_checked": 5,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 639.35,
"r": 93.821,
"b": 587.255
},
"text": "Work Type\nPhase\nLimits",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 639.35,
"r": 210.11275,
"b": 536.255
},
"text": "Resurfacing\nDesign\nSR 582 (Fowler Avenue) from east of Florida Avenue to west of Nebraska Ave",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 529.85,
"r": 73.076,
"b": 458.255
},
"text": "Length\nCity\nCounty\nRoad",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 529.85,
"r": 201.78775,
"b": 445.505
},
"text": "0.46 miles\nTampa\nHillsborough\nFowler Avenue SR 582",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.7",
"order": 12,
"type": "table",
"bbox": {
"l": 30.48,
"t": 432.48,
"r": 217.2,
"b": 301.2
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 2,
"n_cols": 1,
"integrity": {
"cells_checked": 2,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.7.1",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 431.2,
"r": 140.93,
"b": 372.581
},
"text": "Contact Information\nDesign Manager\\nJason Jordan\\n813-975-6169\\nJason.Jordan@dot.state.fl.us",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.2",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 353.426,
"r": 114.93725,
"b": 314.831
},
"text": "Media Contact\\nKayla Mejia\\n813-975-6060\\nKayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.8",
"order": 15,
"type": "figure",
"bbox": {
"l": 222.96,
"t": 663.84,
"r": 583.68,
"b": 519.12
},
"text": "",
"attrs": {
"block_label": "image"
},
"children": [
{
"id": "p1.8.1",
"order": 16,
"type": "heading",
"bbox": {
"l": 225.6,
"t": 532.8,
"r": 265.44,
"b": 520.08
},
"text": "Google",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
}
]
},
{
"id": "p1.9",
"order": 17,
"type": "heading",
"bbox": {
"l": 224.4,
"t": 508.08,
"r": 261.6,
"b": 492.96
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.10",
"order": 18,
"type": "text",
"bbox": {
"l": 223.92,
"t": 487.92,
"r": 571.68,
"b": 446.88
},
"text": "The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of SR 582 (Fowler Avenue) in Hillsborough County."
},
{
"id": "p1.11",
"order": 19,
"type": "text",
"bbox": {
"l": 224.88,
"t": 441.12,
"r": 559.2,
"b": 412.8
},
"text": "Other improvements include ADA upgrades, sidewalk repair, and safety improvements."
},
{
"id": "p1.12",
"order": 20,
"type": "text",
"bbox": {
"l": 225.12,
"t": 406.32,
"r": 526.56,
"b": 390.48
},
"text": "Construction is currently anticipated to begin Spring 2029."
},
{
"id": "p1.13",
"order": 21,
"type": "footnote",
"bbox": {
"l": 527.04,
"t": 528.48,
"r": 582.24,
"b": 519.6
},
"text": "Map data ©2026",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.14",
"order": 22,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.16,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 07/24/2026",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}