← Paul Test
doc11145 905.pdf_v_d10162025.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
30 item(s)
JSON
figure (4)
footer (1)
footnote (1)
header (1)
heading (2)
table (2)
table_cell (11)
text (8)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · HEADING
6 · TABLE
7
8
9
10
11
12
13
14
15
16 · TEXT
17 · TABLE
18
19
20 · FIGURE
21
22 · HEADING
23 · TEXT
24 · TEXT
25 · TEXT
26 · TEXT
27 · TEXT
28 · TEXT
29 · FOOTNOTE
30 · FOOTER
Page 1 JSON
{
"document_id": 11145,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11256,
"item_count": 30,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 2,
"table": 2,
"table_cell": 11,
"text": 8
},
"build_ms": 4,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.48,
"r": 117.6,
"b": 725.76
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.44,
"t": 761.04,
"r": 320.88,
"b": 727.44
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.52,
"t": 773.52,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "heading",
"bbox": {
"l": 25.92,
"t": 706.08,
"r": 530.64,
"b": 671.28
},
"text": "US 19 (Commercial Way) New Traffic Signal at Centralia Road in Hernando County\n254677-5-29",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 662.64,
"r": 216.96,
"b": 416.4
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 5,
"n_cols": 2,
"integrity": {
"cells_checked": 9,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 639.35,
"r": 93.821,
"b": 626.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 122.88,
"t": 638.016,
"r": 216.96,
"b": 613.392
},
"text": "New Traffic Signal",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 607.1,
"r": 105.971,
"b": 483.755
},
"text": "Phase\nProject Start\nCity\nCounty\nRoad\nConstruction Cost",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 607.1,
"r": 207.05275,
"b": 496.505
},
"text": "Completed\nJanuary 9, 2023\nBrooksville\nHernando\nUS 19\n$900,000",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 477.35,
"r": 97.81475,
"b": 451.505
},
"text": "Estimated Completion",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 477.35,
"r": 177.87025,
"b": 464.255
},
"text": "Late 2024",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 445.1,
"r": 93.87725,
"b": 432.005
},
"text": "Contractor",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 445.1,
"r": 210.99025,
"b": 432.005
},
"text": "Cone & Graham, Inc.",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 16,
"type": "text",
"bbox": {
"l": 30.72,
"t": 405.6,
"r": 142.32,
"b": 390.96
},
"text": "Contact Information"
},
{
"id": "p1.8",
"order": 17,
"type": "table",
"bbox": {
"l": 30.72,
"t": 395.28,
"r": 211.68,
"b": 274.08
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 2,
"n_cols": 1,
"integrity": {
"cells_checked": 2,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.8.1",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 384.926,
"r": 144.05225,
"b": 346.331
},
"text": "Project Information\\nMaddie Griffin\\n727-575-8334\\nroadwork@dot.state.fl.us",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.8.2",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 327.176,
"r": 114.93725,
"b": 288.581
},
"text": "Media Contact\\nKayla Mejia\\n813-975-6060\\nKayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.9",
"order": 20,
"type": "figure",
"bbox": {
"l": 222.72,
"t": 663.84,
"r": 583.44,
"b": 518.4
},
"text": "",
"attrs": {
"block_label": "image"
},
"children": [
{
"id": "p1.9.1",
"order": 21,
"type": "text",
"bbox": {
"l": 225.36,
"t": 534,
"r": 264.96,
"b": 519.84
},
"text": "Google"
}
]
},
{
"id": "p1.10",
"order": 22,
"type": "heading",
"bbox": {
"l": 224.4,
"t": 508.08,
"r": 260.88,
"b": 493.2
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.11",
"order": 23,
"type": "text",
"bbox": {
"l": 223.92,
"t": 488.16,
"r": 558.72,
"b": 460.32
},
"text": "As of April 12, 2024, all construction activities associated with this project have been completed."
},
{
"id": "p1.12",
"order": 24,
"type": "text",
"bbox": {
"l": 224.64,
"t": 453.36,
"r": 579.84,
"b": 412.8
},
"text": "This project addressed safety improvements with the construction of a new traffic signal at Commercial Way (US 19) at Centralia Road in Hernando County (Brooksville)."
},
{
"id": "p1.13",
"order": 25,
"type": "text",
"bbox": {
"l": 224.4,
"t": 406.32,
"r": 580.32,
"b": 339.6
},
"text": "Elements of work included, but were not limited to, installation of the signal mentioned above, resurfacing of the roadway, sidewalk construction, and pedestrian features as necessary to accommodate pedestrian traffic with minimum impact to the current vehicular traffic patterns."
},
{
"id": "p1.14",
"order": 26,
"type": "text",
"bbox": {
"l": 224.64,
"t": 333.6,
"r": 517.44,
"b": 318.24
},
"text": "Construction activities are complete as of April 12, 2024."
},
{
"id": "p1.15",
"order": 27,
"type": "text",
"bbox": {
"l": 224.88,
"t": 311.76,
"r": 577.44,
"b": 290.4
},
"text": "*****\n*****"
},
{
"id": "p1.16",
"order": 28,
"type": "text",
"bbox": {
"l": 224.64,
"t": 278.16,
"r": 577.68,
"b": 184.56
},
"text": "What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously."
},
{
"id": "p1.17",
"order": 29,
"type": "footnote",
"bbox": {
"l": 527.04,
"t": 528.96,
"r": 582.72,
"b": 519.12
},
"text": "Map data ©2025",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.18",
"order": 30,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.4,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 10/16/2025",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}