← Paul Test
doc11128 375.pdf_v_d06192026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
28 item(s)
JSON
figure (4)
footer (1)
footnote (1)
header (1)
heading (2)
list (1)
list_item (4)
table (1)
table_cell (7)
text (5)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TITLE
6 · TABLE
7
8
9
10
11
12
13
14 · HEADING
15 · TEXT
16 · LIST
17
18
19
20
21 · TEXT
22 · TEXT
23 · TEXT
24 · FIGURE
25 · HEADING
26 · TEXT
27 · FOOTNOTE
28 · FOOTER
Page 1 JSON
{
"document_id": 11128,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11239,
"item_count": 28,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 2,
"list": 1,
"list_item": 4,
"table": 1,
"table_cell": 7,
"text": 5,
"title": 1
},
"build_ms": 2,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.48,
"r": 117.36,
"b": 726.72
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.2,
"t": 760.8,
"r": 321.36,
"b": 727.92
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.52,
"t": 773.28,
"r": 578.16,
"b": 716.4
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "title",
"bbox": {
"l": 27.36,
"t": 705.36,
"r": 490.08,
"b": 689.28
},
"text": "US 301 Widening and Realignment from SR 39 to south of CR 54 256422-2-52-02",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 677.52,
"r": 216.96,
"b": 486.72
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 4,
"n_cols": 2,
"integrity": {
"cells_checked": 7,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 644.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 196.669,
"b": 631.505
},
"text": "Widening and Realignment",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 625.1,
"r": 67.64225,
"b": 592.505
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 625.1,
"r": 201.49525,
"b": 579.755
},
"text": "Design\nFrom SR 39 to south of CR 54",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 573.35,
"r": 73.076,
"b": 501.755
},
"text": "Length\nCity\nCounty\nRoad",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 573.35,
"r": 201.11275,
"b": 489.005
},
"text": "3 miles\nZephyrhills\nPasco\nGall Boulevard US 301",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.7",
"order": 14,
"type": "heading",
"bbox": {
"l": 31.68,
"t": 474.72,
"r": 141.6,
"b": 460.56
},
"text": "Contact Information",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.8",
"order": 15,
"type": "text",
"bbox": {
"l": 31.68,
"t": 454.08,
"r": 127.2,
"b": 441.84
},
"text": "Design Manager"
},
{
"id": "p1.9",
"order": 16,
"type": "list",
"bbox": {
"l": 31.68,
"t": 441.36,
"r": 180.48,
"b": 384.72
},
"text": "",
"attrs": {
"item_count": 4
},
"children": [
{
"id": "p1.9.1",
"order": 17,
"type": "list_item",
"bbox": {
"l": 34.8,
"t": 441.36,
"r": 100.08,
"b": 429.12
},
"text": "Manan Patel"
},
{
"id": "p1.9.2",
"order": 18,
"type": "list_item",
"bbox": {
"l": 35.52,
"t": 428.88,
"r": 108.96,
"b": 416.88
},
"text": "813-975-6057"
},
{
"id": "p1.9.3",
"order": 19,
"type": "list_item",
"bbox": {
"l": 35.52,
"t": 416.16,
"r": 180.48,
"b": 403.2
},
"text": "Manan.Patel@dot.state.fl.us"
},
{
"id": "p1.9.4",
"order": 20,
"type": "list_item",
"bbox": {
"l": 31.68,
"t": 396.96,
"r": 116.88,
"b": 384.72
},
"text": "Media Contact"
}
]
},
{
"id": "p1.10",
"order": 21,
"type": "text",
"bbox": {
"l": 41.76,
"t": 383.76,
"r": 102,
"b": 371.52
},
"text": "Kayla Mejia"
},
{
"id": "p1.11",
"order": 22,
"type": "text",
"bbox": {
"l": 41.76,
"t": 371.28,
"r": 116.16,
"b": 359.52
},
"text": "813-975-6060"
},
{
"id": "p1.12",
"order": 23,
"type": "text",
"bbox": {
"l": 41.28,
"t": 358.56,
"r": 182.4,
"b": 344.88
},
"text": "Kayla.Mejia@dot.state.fl.us"
},
{
"id": "p1.13",
"order": 24,
"type": "figure",
"bbox": {
"l": 223.44,
"t": 681.36,
"r": 583.68,
"b": 537.12
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.14",
"order": 25,
"type": "heading",
"bbox": {
"l": 224.88,
"t": 525.84,
"r": 261.6,
"b": 511.68
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.15",
"order": 26,
"type": "text",
"bbox": {
"l": 226.56,
"t": 506.16,
"r": 576,
"b": 366
},
"text": "This project will widen US 301 from two lanes to a four lane divided roadway from SR 39 to Corey Street in Downtown Zephyrhills. Once built, the new roadway will connect to two new three lane one way roadways that parallel existing US 301 from Corey Street to CR 54. Other improvements include the addition of bike lanes and sidewalks along both sides of the new roadways.\nIn addition, a portion of SR 39 will be realigned and widened to a four-lane divided roadway at the south end of the project area.\nThis project is currently in design. Construction is not funded at this time.",
"attrs": {
"block_label": "abstract"
}
},
{
"id": "p1.16",
"order": 27,
"type": "footnote",
"bbox": {
"l": 502.32,
"t": 546.48,
"r": 582.72,
"b": 537.36
},
"text": "Map data ©2020 Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.17",
"order": 28,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 19.92,
"r": 360,
"b": 9.6
},
"text": "Last Updated: 06/19/2026",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}