← Paul Test
doc11102 986.pdf_v_d09122025.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
30 item(s)
JSON
figure (3)
footer (1)
header (1)
table (3)
table_cell (21)
text (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TEXT
6 · TABLE
7
8
9
10
11
12
13
14
15
16
17
18
19
20 · TABLE
21
22
23
24
25
26
27 · TABLE
28
29
30 · FOOTER
Table integrity:
2 of 6 cells don't match the text layer at their coordinates.
r1c1 (0%): “Bryce.Johns@dot.state.fl.us”
r3c1 (0%): “Kayla.Mejia@dot.state.fl.us”
Page 1 JSON
{
"document_id": 11102,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11213,
"item_count": 30,
"counts_by_type": {
"figure": 3,
"footer": 1,
"header": 1,
"table": 3,
"table_cell": 21,
"text": 1
},
"build_ms": 5,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.72,
"r": 117.6,
"b": 725.76
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 126.96,
"t": 760.8,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.16,
"b": 716.88
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "text",
"bbox": {
"l": 25.68,
"t": 705.84,
"r": 561.36,
"b": 670.8
},
"text": "SR 60 (Courtney Campbell Causeway) New Traffic Signal east of Bayshore Boulevard in Pinellas County 254677-5-48"
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 661.2,
"r": 217.2,
"b": 306.72
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 7,
"n_cols": 2,
"integrity": {
"cells_checked": 13,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 659.373,
"r": 111.086,
"b": 645.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 639.35,
"r": 93.821,
"b": 626.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 639.35,
"r": 200.449,
"b": 613.505
},
"text": "Safety Improvements",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 607.1,
"r": 67.64225,
"b": 574.505
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 607.1,
"r": 210.58525,
"b": 523.505
},
"text": "Completed\nSR 60 (Courtney Campbell Causeway), east of Bayshore Boulevard",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 517.1,
"r": 105.6785,
"b": 445.505
},
"text": "Project Start\nCity\nCounty\nRoad",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 517.1,
"r": 204.1165,
"b": 407.255
},
"text": "August 6, 2024\nClearwater\nPinellas\nCourtney Campbell Causeway SR 60",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 400.85,
"r": 105.971,
"b": 375.005
},
"text": "Construction Cost",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 400.85,
"r": 175.1365,
"b": 387.755
},
"text": "$800,000",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.10",
"order": 16,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 368.6,
"r": 97.81475,
"b": 342.755
},
"text": "Estimated Completion",
"attrs": {
"row": 5,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.11",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 368.6,
"r": 198.77275,
"b": 355.505
},
"text": "Summer 2025",
"attrs": {
"row": 5,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.12",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 336.35,
"r": 93.87725,
"b": 323.255
},
"text": "Contractor",
"attrs": {
"row": 6,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.13",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 336.35,
"r": 210.99025,
"b": 323.255
},
"text": "Cone & Graham, Inc.",
"attrs": {
"row": 6,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 20,
"type": "table",
"bbox": {
"l": 29.52,
"t": 297.84,
"r": 217.2,
"b": 164.88
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 4,
"n_cols": 2,
"integrity": {
"cells_checked": 6,
"cells_flagged": 2,
"flags": [
{
"row": 1,
"col": 1,
"coverage": 0,
"text": "Bryce.Johns@dot.state.fl.us"
},
{
"row": 3,
"col": 1,
"coverage": 0,
"text": "Kayla.Mejia@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.7.1",
"order": 21,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 296.2,
"r": 144.05225,
"b": 263.081
},
"text": "Contact Information\nProject Information",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.2",
"order": 22,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 263.42600000000004,
"r": 114.6935,
"b": 237.58100000000002
},
"text": "Bryce Johns\\n727-575-8334",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.3",
"order": 23,
"type": "table_cell",
"bbox": {
"l": 123.36,
"t": 244.656,
"r": 217.2,
"b": 218.064
},
"text": "Bryce.Johns@dot.state.fl.us",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1
}
},
{
"id": "p1.7.4",
"order": 24,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 218.42600000000004,
"r": 114.93725,
"b": 205.33100000000002
},
"text": "Media Contact",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true
}
},
{
"id": "p1.7.5",
"order": 25,
"type": "table_cell",
"bbox": {
"l": 43.031,
"t": 205.67600000000004,
"r": 114.6935,
"b": 179.83100000000002
},
"text": "Kayla Mejia\\n813-975-6060",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.7.6",
"order": 26,
"type": "table_cell",
"bbox": {
"l": 123.36,
"t": 191.472,
"r": 217.2,
"b": 164.88
},
"text": "Kayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1
}
}
]
},
{
"id": "p1.8",
"order": 27,
"type": "table",
"bbox": {
"l": 222.24,
"t": 660.48,
"r": 583.92,
"b": 206.4
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 2,
"n_cols": 1,
"integrity": {
"cells_checked": 2,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.8.1",
"order": 28,
"type": "table_cell",
"bbox": {
"l": 227.204,
"t": 507.247,
"r": 259.112,
"b": 493.279
},
"text": "About",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.8.2",
"order": 29,
"type": "table_cell",
"bbox": {
"l": 222.24,
"t": 433.44,
"r": 583.92,
"b": 206.4
},
"text": "As of June 30, 2025, all construction activities associated with this project have been completed. The Florida Department of Transportation's Design-Build firm, Cone & Graham, Inc., installed a new traffic signal on SR 60 (Courtney Campbell Causeway), just east of Bayshore Boulevard in Pinellas County Other safety and operational improvements included roadway resurfacing and installing sidewalk. Construction activities completed in summer 2025. What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1
}
}
]
},
{
"id": "p1.9",
"order": 30,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.4,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 09/12/2025",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}