← Paul Test
doc11060 1023.pdf_v_d10272026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
28 item(s)
JSON
figure (4)
footer (1)
footnote (1)
header (1)
heading (1)
table (2)
table_cell (13)
text (4)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TITLE
6 · TABLE
7
8
9
10
11
12
13
14
15
16 · TABLE
17
18
19
20
21 · FIGURE
22 · HEADING
23 · TEXT
24 · TEXT
25 · TEXT
26 · TEXT
27 · FOOTNOTE
28 · FOOTER
Table integrity:
2 of 4 cells don't match the text layer at their coordinates.
r1c0 (0%): “Maricelle.Venegas@dot.state.fl.us”
r3c0 (0%): “Kayla.Mejia@dot.state.fl.us”
Page 1 JSON
{
"document_id": 11060,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11171,
"item_count": 28,
"counts_by_type": {
"figure": 4,
"footer": 1,
"footnote": 1,
"header": 1,
"heading": 1,
"table": 2,
"table_cell": 13,
"text": 4,
"title": 1
},
"build_ms": 3,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.48,
"r": 117.36,
"b": 726
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.44,
"t": 761.04,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.16,
"b": 716.4
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "title",
"bbox": {
"l": 27.36,
"t": 705.6,
"r": 524.16,
"b": 689.04
},
"text": "SR 553 (Park Road) Repaving from US 92 (Baker Street) to north of I-4 441664-1-52-01",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 681.36,
"r": 216.96,
"b": 369.6
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 5,
"n_cols": 2,
"integrity": {
"cells_checked": 9,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 605.255
},
"text": "Work Type\nPhase\nLimits",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 211.75525,
"b": 579.755
},
"text": "Repaving\nCompleted\nfrom US 92 (Baker Street) to north of I-4",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 573.35,
"r": 105.971,
"b": 450.005
},
"text": "Project Start\nLength\nCity\nCounty\nRoad\nConstruction Cost",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 573.35,
"r": 210.5515,
"b": 462.755
},
"text": "August 15, 2025\n1.14 Miles\nPlant City\nHillsborough\nSR 553\n$4.6 million",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 443.6,
"r": 97.81475,
"b": 417.755
},
"text": "Estimated Completion",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 443.6,
"r": 173.48275,
"b": 430.505
},
"text": "Fall 2026",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 411.35,
"r": 93.87725,
"b": 398.255
},
"text": "Contractor",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 411.35,
"r": 191.314,
"b": 372.755
},
"text": "Hubbard Construction Company",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.7",
"order": 16,
"type": "table",
"bbox": {
"l": 28.8,
"t": 359.52,
"r": 217.2,
"b": 214.08
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 4,
"n_cols": 2,
"integrity": {
"cells_checked": 4,
"cells_flagged": 2,
"flags": [
{
"row": 1,
"col": 0,
"coverage": 0,
"text": "Maricelle.Venegas@dot.state.fl.us"
},
{
"row": 3,
"col": 0,
"coverage": 0,
"text": "Kayla.Mejia@dot.state.fl.us"
}
]
}
},
"children": [
{
"id": "p1.7.1",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 358.45,
"r": 144.05225,
"b": 299.831
},
"text": "Contact Information\nProject Information\nMaricelle Venegas\\n813-975-6204",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.2",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 28.8,
"t": 297.1886,
"r": 217.2,
"b": 276.4114
},
"text": "Maricelle.Venegas@dot.state.fl.us",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 2
}
},
{
"id": "p1.7.3",
"order": 19,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 267.92600000000004,
"r": 114.93725,
"b": 229.33100000000002
},
"text": "Media Contact\nKayla Mejia\\n813-975-6060",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.4",
"order": 20,
"type": "table_cell",
"bbox": {
"l": 28.8,
"t": 234.8571,
"r": 217.2,
"b": 214.08
},
"text": "Kayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 2
}
}
]
},
{
"id": "p1.8",
"order": 21,
"type": "figure",
"bbox": {
"l": 221.76,
"t": 681.36,
"r": 583.44,
"b": 535.68
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.9",
"order": 22,
"type": "heading",
"bbox": {
"l": 225.12,
"t": 525.6,
"r": 261.12,
"b": 511.68
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.10",
"order": 23,
"type": "text",
"bbox": {
"l": 223.92,
"t": 506.16,
"r": 568.56,
"b": 478.08
},
"text": "All construction activities associated with this project were completed on Saturday, October 17, 2026."
},
{
"id": "p1.11",
"order": 24,
"type": "text",
"bbox": {
"l": 224.88,
"t": 471.12,
"r": 572.4,
"b": 443.76
},
"text": "This project repaved Park Road (SR 553) from Baker Street to north of I-4 in Plant City."
},
{
"id": "p1.12",
"order": 25,
"type": "text",
"bbox": {
"l": 224.64,
"t": 437.04,
"r": 545.52,
"b": 395.76
},
"text": "Additional improvements included the installation of sidewalk, signing, pavement markings, signalization, lighting, and utility adjustments."
},
{
"id": "p1.13",
"order": 26,
"type": "text",
"bbox": {
"l": 225.12,
"t": 389.76,
"r": 546.24,
"b": 363.36
},
"text": "The $4.6 million repaving project was expected to finish fall of 2026."
},
{
"id": "p1.14",
"order": 27,
"type": "footnote",
"bbox": {
"l": 502.32,
"t": 546.24,
"r": 582.72,
"b": 537.6
},
"text": "Map data ©2026 Google",
"attrs": {
"block_label": "vision_footnote"
}
},
{
"id": "p1.15",
"order": 28,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.16,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 10/27/2026",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}