← Paul Test
doc11043 1017.pdf_v_d04032026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
25 item(s)
JSON
figure (4)
footer (1)
header (1)
heading (1)
table (2)
table_cell (11)
text (4)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TITLE
6 · TABLE
7
8
9
10
11
12
13
14
15
16 · TABLE
17
18
19 · FIGURE
20 · HEADING
21 · TEXT
22 · TEXT
23 · TEXT
24 · TEXT
25 · FOOTER
Page 1 JSON
{
"document_id": 11043,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11154,
"item_count": 25,
"counts_by_type": {
"figure": 4,
"footer": 1,
"header": 1,
"heading": 1,
"table": 2,
"table_cell": 11,
"text": 4,
"title": 1
},
"build_ms": 2,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 28.8,
"t": 768.48,
"r": 117.6,
"b": 726.24
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.44,
"t": 760.8,
"r": 320.88,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.16,
"b": 716.4
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "title",
"bbox": {
"l": 27.12,
"t": 705.36,
"r": 478.8,
"b": 689.28
},
"text": "SR 52 Resurfacing From E. of Hicks Rd. to W. of Moon Lake Rd. 449173-1-32-01",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 679.44,
"r": 216.24,
"b": 436.08
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 5,
"n_cols": 2,
"integrity": {
"cells_checked": 9,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 644.255
},
"text": "Work Type",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 205.4665,
"b": 593.255
},
"text": "Resurfacing, Intersection Enhancements, Safety Improvements",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 586.85,
"r": 67.64225,
"b": 554.255
},
"text": "Phase\nLimits",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 586.85,
"r": 209.044,
"b": 528.755
},
"text": "Design\nFrom E. of Hicks Rd. To W. of Moon Lake Rd.",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.6",
"order": 12,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 522.35,
"r": 72.65975,
"b": 489.755
},
"text": "Length\nCity",
"attrs": {
"row": 3,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.7",
"order": 13,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 522.35,
"r": 209.854,
"b": 477.005
},
"text": "2.9 Miles\nHudson New Port Richey",
"attrs": {
"row": 3,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.8",
"order": 14,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 470.6,
"r": 73.076,
"b": 438.005
},
"text": "County\nRoad",
"attrs": {
"row": 4,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.9",
"order": 15,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 470.6,
"r": 156.4165,
"b": 438.005
},
"text": "Pasco\nSR 52",
"attrs": {
"row": 4,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.7",
"order": 16,
"type": "table",
"bbox": {
"l": 28.32,
"t": 425.04,
"r": 217.2,
"b": 292.56
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 2,
"n_cols": 1,
"integrity": {
"cells_checked": 2,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.7.1",
"order": 17,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 423.7,
"r": 140.93,
"b": 365.081
},
"text": "Contact Information\nDesign Manager\\nAnh-Thu Nguyen\\n813-975-6179\\nAnh-Thu.Nguyen@dot.state.fl.us",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.7.2",
"order": 18,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 345.926,
"r": 114.93725,
"b": 307.331
},
"text": "Media Contact\\nKayla Mejia\\n813-975-6060\\nKayla.Mejia@dot.state.fl.us",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true
}
}
]
},
{
"id": "p1.8",
"order": 19,
"type": "figure",
"bbox": {
"l": 224.4,
"t": 681.12,
"r": 583.92,
"b": 537.12
},
"text": "",
"attrs": {
"block_label": "image"
}
},
{
"id": "p1.9",
"order": 20,
"type": "heading",
"bbox": {
"l": 225.36,
"t": 525.6,
"r": 261.12,
"b": 511.68
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.10",
"order": 21,
"type": "text",
"bbox": {
"l": 224.16,
"t": 506.16,
"r": 579.12,
"b": 465.12
},
"text": "The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road 52 in Pasco County."
},
{
"id": "p1.11",
"order": 22,
"type": "text",
"bbox": {
"l": 224.4,
"t": 455.04,
"r": 568.32,
"b": 413.76
},
"text": "In addition to resurfacing, the project also includes minor drainage improvements, ADA facility upgrades, as well as general corridor safety modification work."
},
{
"id": "p1.12",
"order": 23,
"type": "text",
"bbox": {
"l": 224.64,
"t": 395.28,
"r": 564.96,
"b": 354.24
},
"text": "Other improvements include intersection lighting and intersection upgrades, signing and pavement markings, and a traffic signal warrant analysis at the SR 52/Shadow Ridge Blvd. intersection."
},
{
"id": "p1.13",
"order": 24,
"type": "text",
"bbox": {
"l": 225.36,
"t": 348,
"r": 503.28,
"b": 332.64
},
"text": "Construction is currently anticipated to begin in 2027."
},
{
"id": "p1.14",
"order": 25,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.16,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 04/03/2026",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}