← Paul Test
doc11026 789.pdf_v_d04202026.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
19 item(s)
JSON
figure (4)
footer (1)
header (1)
heading (1)
table (1)
table_cell (5)
text (5)
title (1)
1 · FIGURE
2 · HEADER
3 · FIGURE
4 · FIGURE
5 · TITLE
6 · TABLE
7
8
9
10
11
12 · TEXT
13 · TEXT
14 · FIGURE
15
16
17 · HEADING
18 · TEXT
19 · FOOTER
Page 1 JSON
{
"document_id": 11026,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 11137,
"item_count": 19,
"counts_by_type": {
"figure": 4,
"footer": 1,
"header": 1,
"heading": 1,
"table": 1,
"table_cell": 5,
"text": 5,
"title": 1
},
"build_ms": 2,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 29.04,
"t": 768.48,
"r": 117.36,
"b": 726
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 127.68,
"t": 761.04,
"r": 321.12,
"b": 727.68
},
"text": "Tampa Bay\nFlorida Department of Transportation",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "figure",
"bbox": {
"l": 521.76,
"t": 773.28,
"r": 578.16,
"b": 716.64
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.4",
"order": 4,
"type": "figure",
"bbox": {
"l": 28.346,
"t": 772.158,
"r": 522.569,
"b": 712.851
},
"text": "",
"attrs": {
"source": "pdf_image"
}
},
{
"id": "p1.5",
"order": 5,
"type": "title",
"bbox": {
"l": 27.6,
"t": 705.12,
"r": 517.2,
"b": 689.52
},
"text": "SR 52 Widening from east of Secretariat Road to east of Ehren Cutoff 256334-3-52-01",
"attrs": {
"block_label": "doc_title"
},
"level": 2
},
{
"id": "p1.6",
"order": 6,
"type": "table",
"bbox": {
"l": 28.8,
"t": 679.92,
"r": 216.72,
"b": 506.64
},
"text": "",
"attrs": {
"block_label": "table",
"n_rows": 3,
"n_cols": 2,
"integrity": {
"cells_checked": 5,
"cells_flagged": 0
}
},
"children": [
{
"id": "p1.6.1",
"order": 7,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 677.373,
"r": 111.086,
"b": 663.405
},
"text": "Project Details",
"attrs": {
"row": 0,
"col": 0,
"rowspan": 1,
"colspan": 2,
"bbox_refit": true,
"column_header": true,
"header_source": "pdf"
}
},
{
"id": "p1.6.2",
"order": 8,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 657.35,
"r": 93.821,
"b": 605.255
},
"text": "Work Type\nPhase\nLimits",
"attrs": {
"row": 1,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.3",
"order": 9,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 657.35,
"r": 208.29025,
"b": 567.005
},
"text": "Widening\nDesign\nSR 52 from east of Secretariat Road to east of Ehren Cutoff",
"attrs": {
"row": 1,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.4",
"order": 10,
"type": "table_cell",
"bbox": {
"l": 32.846,
"t": 560.6,
"r": 73.076,
"b": 508.505
},
"text": "Length\nCounty\nRoad",
"attrs": {
"row": 2,
"col": 0,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
},
{
"id": "p1.6.5",
"order": 11,
"type": "table_cell",
"bbox": {
"l": 126.874,
"t": 560.6,
"r": 163.51525,
"b": 508.505
},
"text": "3 miles\nPasco\nSR 52",
"attrs": {
"row": 2,
"col": 1,
"rowspan": 1,
"colspan": 1,
"bbox_refit": true,
"merged_continuation": true
}
}
]
},
{
"id": "p1.7",
"order": 12,
"type": "text",
"bbox": {
"l": 31.44,
"t": 494.4,
"r": 141.6,
"b": 480.48
},
"text": "Contact Information"
},
{
"id": "p1.8",
"order": 13,
"type": "text",
"bbox": {
"l": 31.68,
"t": 474.72,
"r": 189.36,
"b": 364.8
},
"text": "Design Manager\nOmar Chehab\n813-975-6468\nOmar.Chehab@dot.state.fl.us\nMedia Contact\nKayla Mejia\n813-975-6060\nKayla.Mejia@dot.state.fl.us"
},
{
"id": "p1.9",
"order": 14,
"type": "figure",
"bbox": {
"l": 222.96,
"t": 681.6,
"r": 583.44,
"b": 536.64
},
"text": "",
"attrs": {
"block_label": "image"
},
"children": [
{
"id": "p1.9.1",
"order": 15,
"type": "text",
"bbox": {
"l": 225.6,
"t": 553.68,
"r": 353.76,
"b": 536.64
},
"text": "Google Bio Control Model... Bay City Flyers"
},
{
"id": "p1.9.2",
"order": 16,
"type": "text",
"bbox": {
"l": 502.32,
"t": 546.72,
"r": 582.72,
"b": 537.36
},
"text": "Map data ©2025 Google"
}
]
},
{
"id": "p1.10",
"order": 17,
"type": "heading",
"bbox": {
"l": 224.88,
"t": 525.84,
"r": 261.6,
"b": 511.68
},
"text": "About",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.11",
"order": 18,
"type": "text",
"bbox": {
"l": 225.12,
"t": 508.8,
"r": 575.76,
"b": 347.76
},
"text": "This project involves widening SR 52 (Schrader Highway) from the existing two-lane road to a four-lane divided road. To minimize right of way acquisition, the widening will generally occur to the north of the existing roadway. A 12-foot wide multi-use trail will be constructed along the north side of the road as well.\nAdditional improvements to SR 52 (Schrader Highway) include the construction of two wildlife crossings, a pedestrian underpass, and upgrading the Ehren Cutoff intersection to a signalized, four-leg intersection.\nThe project is currently under design. Construction is anticipated to begin in Fall 2027.",
"attrs": {
"block_label": "abstract"
}
},
{
"id": "p1.12",
"order": 19,
"type": "footer",
"bbox": {
"l": 251.76,
"t": 20.16,
"r": 360,
"b": 9.36
},
"text": "Last Updated: 04/20/2026",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}