    "document_id": 10901,
    "page": 41,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 11014,
    "item_count": 16,
    "counts_by_type": {
        "heading": 2,
        "link": 1,
        "list": 1,
        "list_item": 6,
        "text": 6
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p41.1",
            "order": 1,
            "type": "list_item",
            "bbox": {
                "l": 89.52,
                "t": 719.94,
                "r": 527.52,
                "b": 690
            },
            "text": "Crews will be working on excavation, groundwork, concrete work, signals and lighting."
        },
        {
            "id": "p41.2",
            "order": 2,
            "type": "heading",
            "bbox": {
                "l": 89.52,
                "t": 677.28,
                "r": 305.76,
                "b": 663.6
            },
            "text": "Toledo Blade Boulevard Interchange:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p41.3",
            "order": 3,
            "type": "list_item",
            "bbox": {
                "l": 89.04,
                "t": 664.02,
                "r": 526.8,
                "b": 648
            },
            "text": "Crews will be working on excavation, groundwork, asphalt, signals and lighting."
        },
        {
            "id": "p41.4",
            "order": 4,
            "type": "heading",
            "bbox": {
                "l": 89.52,
                "t": 635.28,
                "r": 272.88,
                "b": 621.84
            },
            "text": "Lane/ramp closure restrictions:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p41.5",
            "order": 5,
            "type": "list_item",
            "bbox": {
                "l": 89.04,
                "t": 620.64,
                "r": 528.48,
                "b": 537.36
            },
            "text": "When necessary, motorists should anticipate lane closures on the I-75 ramps between 10 p.m. and 4 a.m. and full ramp closures between 11 p.m. and 5 a.m. Single-lane closures on Sumter Boulevard and Toledo Blade Boulevard can be expected from 9 a.m. to 4 p.m. as well as 7 p.m. to 7 a.m., and double lane closures from 8 p.m. to 6 a.m. As major closures are added to the schedule, more information will be included in the weekly update.",
            "marker": "-"
        },
        {
            "id": "p41.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 88.8,
                "t": 524.88,
                "r": 528.72,
                "b": 481.92
            },
            "text": "Please use caution and watch for workers and construction vehicles entering and leaving the roadway. The expected completion date is early 2027. For more information please visit: https://www.swflroads.com/project/452356-1.",
            "children": [
                {
                    "id": "p41.6.1",
                    "order": 7,
                    "type": "link",
                    "bbox": {
                        "l": 217.974,
                        "t": 497.602,
                        "r": 457.91,
                        "b": 483.803
                    },
                    "text": "https://www.swflroads.com/project/452356-1.",
                    "attrs": {
                        "uri": "https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.swflroads.com%2Fproject%2F452356-1&data=05%7C02%7CNancy.Morgan%40dot.state.fl.us%7C74c5c90b7df24c58ecd508df0e938aa1%7Cdb21de5dbc9c420c8f3f8f08f85b5ada%7C0%7C0%7C639245699060164225%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=5cD%2BsuqLKYhIPI5FuIqPwr6sAsF3GEJj0SoiyB%2B4SLs%3D&reserved=0",
                        "action_type": "/URI"
                    }
                }
            ]
        },
        {
            "id": "p41.7",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 52.32,
                "t": 469.44,
                "r": 528.48,
                "b": 395.76
            },
            "text": "I-75 and Clark Rd: Landscape project: The Florida Department of Transportation (FDOT) will be installing landscaping and associated irrigation within the interchange through late fall. Motorists can expect occasional shoulder closures on Clark Road and I-75 ramps as tree and plant material are being offloaded (no landscaping to be installed on the interstate)."
        },
        {
            "id": "p41.8",
            "order": 9,
            "type": "list",
            "bbox": {
                "l": 88.32,
                "t": 382.38,
                "r": 528.24,
                "b": 296.64
            },
            "text": "",
            "attrs": {
                "item_count": 3
            },
            "children": [
                {
                    "id": "p41.8.1",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 88.32,
                        "t": 382.38,
                        "r": 528.24,
                        "b": 352.8
                    },
                    "text": "Watch for trucks and landscaping equipment entering and exiting throughout the project limits.",
                    "marker": "•"
                },
                {
                    "id": "p41.8.2",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 88.56,
                        "t": 340.14,
                        "r": 357.36,
                        "b": 324.24
                    },
                    "text": "Be prepared for intermittent shoulder closures."
                },
                {
                    "id": "p41.8.3",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 89.04,
                        "t": 311.7,
                        "r": 275.28,
                        "b": 296.64
                    },
                    "text": "Please use caution in the area."
                }
            ]
        },
        {
            "id": "p41.9",
            "order": 13,
            "type": "text",
            "bbox": {
                "l": 52.56,
                "t": 282.96,
                "r": 528.48,
                "b": 194.88
            },
            "text": "I-75 Bridge Nos. 170090, 170091, 170093, 170096, 170101, 170177, 170110, 170178, and 170111 from S.R. 777 to S.R. 681 in Sarasota County: Testing project: The contractor will have single-lane closures with flagging operations on I-75 at the bridge locations to test for asbestos and metal-based coatings overnight from October 19-23. Lane closures will be intermittent and will occur between 7 p.m. and 6 a.m. Please use caution and watch for workers in the project area."
        },
        {
            "id": "p41.10",
            "order": 14,
            "type": "text",
            "bbox": {
                "l": 53.28,
                "t": 180.72,
                "r": 528.48,
                "b": 123.6
            },
            "text": "Districtwide Movable Bridges (Sarasota County): Construction Project: The Florida Department of Transportation is installing Intelligent Transportation Systems (ITS) at various locations in Sarasota County. The following bridges began construction in March 2025:"
        },
        {
            "id": "p41.11",
            "order": 15,
            "type": "text",
            "bbox": {
                "l": 82.8,
                "t": 108.48,
                "r": 406.8,
                "b": 94.56
            },
            "text": "U.S. 41 Business Intracoastal Waterway Bridge (Circus),"
        },
        {
            "id": "p41.12",
            "order": 16,
            "type": "text",
            "bbox": {
                "l": 83.28,
                "t": 93.84,
                "r": 479.52,
                "b": 78.72
            },
            "text": "U.S. 41 Business Hatchett Creek/Intracoastal Waterway Bridge (KMI),"
        }
    ],
    "excluded_furniture": {