            "id": "p22.1",
            "order": 1,
            "type": "text",
            "bbox": {
                "l": 52.32,
                "t": 705.36,
                "r": 528.96,
                "b": 632.16
            },
            "text": "State Roadways (U.S. 41, S.R. 31, S.R. 78, S.R. 80, S.R. 82, S.R. 739, S.R. 865, and S.R. 867): Maintenance contract project: Motorists should expect lane closures during daytime hours from 9 a.m. to 4 p.m. Crews are edging along the roadside and curb and gutter on state roadways. Motorists should expect slow-moving traffic and possible delays."
        },
        {
            "id": "p22.2",
            "order": 2,
            "type": "heading",
            "bbox": {
                "l": 53.52,
                "t": 603.84,
                "r": 169.68,
                "b": 590.16
            },
            "text": "MANATEE COUNTY",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p22.3",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 53.28,
                "t": 574.8,
                "r": 528.24,
                "b": 530.64
            },
            "text": "Districtwide Moveable Bridges (Manatee County): Construction project: Crews will begin the installation of pedestrian/bicycle detection systems, conduits and electrical components, and connections to the bridge tender buildings."
        },
        {
            "id": "p22.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 92.16,
                "t": 516.72,
                "r": 365.76,
                "b": 502.32
            },
            "text": "Construction on the following bridges will continue:"
        },
        {
            "id": "p22.5",
            "order": 5,
            "type": "list",
            "bbox": {
                "l": 88.08,
                "t": 487.92,
                "r": 528,
                "b": 270
            },
            "text": "",
            "attrs": {
                "item_count": 8
            },
            "children": [
                {
                    "id": "p22.5.1",
                    "order": 6,
                    "type": "list_item",
                    "bbox": {
                        "l": 93.12,
                        "t": 487.92,
                        "r": 355.68,
                        "b": 474
                    },
                    "text": "S.R. 684 Sarasota Pass Bridge (Cortez Road),"
                },
                {
                    "id": "p22.5.2",
                    "order": 7,
                    "type": "list_item",
                    "bbox": {
                        "l": 93.36,
                        "t": 473.28,
                        "r": 368.64,
                        "b": 459.12
                    },
                    "text": "S.R. 64 Sarasota Pass Bridge (Anna Maria), and"
                },
                {
                    "id": "p22.5.3",
                    "order": 8,
                    "type": "list_item",
                    "bbox": {
                        "l": 93.36,
                        "t": 458.64,
                        "r": 366.96,
                        "b": 444.24
                    },
                    "text": "S.R. 789 Longboat Key Pass Bridge (Longboat)"
                },
                {
                    "id": "p22.5.4",
                    "order": 9,
                    "type": "list_item",
                    "bbox": {
                        "l": 93.12,
                        "t": 430.1502,
                        "r": 316.32,
                        "b": 412.32
                    },
                    "text": "Testing began in early February 2026."
                },
                {
                    "id": "p22.5.5",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 93.12,
                        "t": 404.9502,
                        "r": 527.52,
                        "b": 372.48
                    },
                    "text": "Motorists are advised that there will be intermittent sidewalk and lane closures throughout the duration of construction."
                },
                {
                    "id": "p22.5.6",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 93.12,
                        "t": 365.2302,
                        "r": 528,
                        "b": 332.64
                    },
                    "text": "Motorists should expect lane closures during the nighttime/overnight hours from 7 p.m. to 6 a.m."
                },
                {
                    "id": "p22.5.7",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 93.12,
                        "t": 325.2702,
                        "r": 440.64,
                        "b": 307.44
                    },
                    "text": "Motorists are advised to use caution in the construction zone."
                },
                {
                    "id": "p22.5.8",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 88.08,
                        "t": 298.8,
                        "r": 526.8,
                        "b": 270
                    },
                    "text": "Variable message signs will be in place to alert drivers that work is underway. Estimated completion of testing is in late 2026, weather permitting."
                }
            ]
        },
        {
            "id": "p22.6",
            "order": 14,
            "type": "text",
            "bbox": {
                "l": 51.84,
                "t": 256.08,
                "r": 528.96,
                "b": 154.32
            },
            "text": "I-275 from North of the Northbound Toll Plaza to the Hillsboro County Line: Materials project: Crews will close several lanes on south and northbound I-275 from north of the northbound toll plaza to the Hillsboro County line as the contractor performs core testing activities. The outside lane and shoulder will be temporarily closed on November 3, the inside lane and shoulder will be temporarily closed on November 4, and the outside lane and shoulder will be temporarily closed on November 5 from 9 p.m. to 5 a.m. Please use caution and watch for lane closures and traffic shifts."
        },
        {
            "id": "p22.7",
            "order": 15,
            "type": "text",
            "bbox": {
                "l": 51.84,
                "t": 140.4,
                "r": 528.72,
                "b": 81.84
            },
            "text": "I-75 (S.R. 93) at the Intersection of S.R. 64 and S.R. 70: Construction project: This project is for the construction of Arterial Dynamic Message Signs (ADMS) on I-75 at two interchanges in Manatee County. The items of work include the construction of ADMS, fiber optic cable, conduit, pull and splice boxes, verification closed circuit"
        }
    ],