{
    "document_id": 10818,
    "page": 6,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10929,
    "item_count": 16,
    "counts_by_type": {
        "header": 1,
        "list": 1,
        "list_item": 8,
        "text": 6
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p6.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 478.08,
                "t": 740.64,
                "r": 534.48,
                "b": 727.68
            },
            "text": "Page 4 of 10",
            "attrs": {
                "block_label": "number"
            },
            "level": 2
        },
        {
            "id": "p6.2",
            "order": 2,
            "type": "list",
            "bbox": {
                "l": 118.32,
                "t": 708.96,
                "r": 532.32,
                "b": 460.08
            },
            "text": "",
            "attrs": {
                "item_count": 8
            },
            "children": [
                {
                    "id": "p6.2.1",
                    "order": 3,
                    "type": "list_item",
                    "bbox": {
                        "l": 139.44,
                        "t": 708.96,
                        "r": 255.84,
                        "b": 694.56
                    },
                    "text": "Anticipated deliveries.",
                    "marker": "d."
                },
                {
                    "id": "p6.2.2",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 139.2,
                        "t": 683.04,
                        "r": 240.24,
                        "b": 668.16
                    },
                    "text": "Security proposals.",
                    "marker": "e."
                },
                {
                    "id": "p6.2.3",
                    "order": 5,
                    "type": "list_item",
                    "bbox": {
                        "l": 138,
                        "t": 657.36,
                        "r": 453.12,
                        "b": 641.04
                    },
                    "text": "Provisions for solid waste storage and handling including recyclables.",
                    "marker": "f."
                },
                {
                    "id": "p6.2.4",
                    "order": 6,
                    "type": "list_item",
                    "bbox": {
                        "l": 137.52,
                        "t": 631.2,
                        "r": 532.32,
                        "b": 601.68
                    },
                    "text": "Impacts of the proposed use in conjunction with traffic congestion, noise, glare, air pollution, fire hazards and safety hazards.",
                    "marker": "g."
                },
                {
                    "id": "p6.2.5",
                    "order": 7,
                    "type": "list_item",
                    "bbox": {
                        "l": 137.28,
                        "t": 592.56,
                        "r": 532.32,
                        "b": 564
                    },
                    "text": "Ownership and maintenance proposals associated with the site's stormwater management system.",
                    "marker": "h."
                },
                {
                    "id": "p6.2.6",
                    "order": 8,
                    "type": "list_item",
                    "bbox": {
                        "l": 135.6,
                        "t": 554.16,
                        "r": 339.36,
                        "b": 538.8
                    },
                    "text": "EV Parking and the extent of roof top solar.",
                    "marker": "i."
                },
                {
                    "id": "p6.2.7",
                    "order": 9,
                    "type": "list_item",
                    "bbox": {
                        "l": 118.32,
                        "t": 528.24,
                        "r": 530.88,
                        "b": 498.48
                    },
                    "text": "Traffic Safety, Site Access, Circulation, Loading, Required Parking and Existing Roadway Improvements",
                    "marker": "4."
                },
                {
                    "id": "p6.2.8",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 134.4,
                        "t": 488.88,
                        "r": 530.16,
                        "b": 460.08
                    },
                    "text": "A Traffic Impact Analysis is required based on the total floor area proposed and has been provided. The following has been concluded:",
                    "marker": "a."
                }
            ]
        },
        {
            "id": "p6.3",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 149.04,
                "t": 450.24,
                "r": 531.36,
                "b": 382.56
            },
            "text": "\"It is concluded, based on the analysis set forth in this report, that plans to construct a driveway to a construction yard and to construct a 15,000 SF office building on the noted property can be approved and operate compatibility with future traffic conditions. Exiting traffic from the 2 uses to Whitesville Road will do so at acceptable levels of service for the 2035 design year."
        },
        {
            "id": "p6.4",
            "order": 12,
            "type": "text",
            "bbox": {
                "l": 148.56,
                "t": 373.2,
                "r": 528.48,
                "b": 331.44
            },
            "text": "The Site Plan, prepared by YPE, shows adequate areas for parking and storage of vehicles, equipment and materials for the construction yard and adequate parking for the office building.\""
        },
        {
            "id": "p6.5",
            "order": 13,
            "type": "text",
            "bbox": {
                "l": 147.6,
                "t": 321.12,
                "r": 527.76,
                "b": 278.16
            },
            "text": "The applicant should review these conclusions with the Board as well as the specific methodology in establishing same. Any comments which have been required from the local Bureau of Fire Prevention and Traffic Safety should be addressed."
        },
        {
            "id": "p6.6",
            "order": 14,
            "type": "text",
            "bbox": {
                "l": 129.84,
                "t": 269.76,
                "r": 527.04,
                "b": 202.32
            },
            "text": "b. Site access is proposed through 1 new 2-way driveway connection to Whitesville Road.\nAs Whitesville Road is a County roadway facility, County Planning Board review and approval is required. The applicant should also address any input which has been received by the County Planning Board/Engineering department regarding the driveway design which is proposed."
        },
        {
            "id": "p6.7",
            "order": 15,
            "type": "text",
            "bbox": {
                "l": 145.68,
                "t": 192,
                "r": 525.84,
                "b": 150
            },
            "text": "Specific construction detailing including pavement restoration/widening areas, cross sections and design grading should be provided for the Whitesville Road driveway connections as well as all R.O.W. improvements."
        },
        {
            "id": "p6.8",
            "order": 16,
            "type": "text",
            "bbox": {
                "l": 127.44,
                "t": 140.4,
                "r": 525.12,
                "b": 85.44
            },
            "text": "c. The new driveway connects to the site's main circulation aisle providing access to all buildings and all off-street parking areas. Based on aisle width and turning radii provided onsite circulation is acceptable, however all curb radii should be specified at 5.0 FT. Additionally, the applicant should address the following waivers:"
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}