{
    "document_id": 10766,
    "page": 1,
    "width_pt": 612,
    "height_pt": 1008,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10877,
    "item_count": 22,
    "counts_by_type": {
        "text": 21,
        "title": 1
    },
    "build_ms": 7,
    "items": [
        {
            "id": "p1.1",
            "order": 1,
            "type": "title",
            "bbox": {
                "l": 195.36,
                "t": 989.04,
                "r": 442.32,
                "b": 957.36
            },
            "text": "JACKSON TOWNSHIP PLANNING BOARD SPECIAL MEETING\nMONDAY, JULY 26, 2021",
            "attrs": {
                "block_label": "doc_title"
            },
            "level": 2
        },
        {
            "id": "p1.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 60.72,
                "t": 939.12,
                "r": 563.52,
                "b": 895.68
            },
            "text": "The July 26 2, 2021 meeting of the Jackson Township Board was called to order at 7:03 p.m. by Planning Board Secretary, Denise Buono with a salute to the flag by all present. Attorney Sean Gertner read the Open Public Meetings Act Statement noting that adequate notice has been provided and advertised in the manner prescribed by law."
        },
        {
            "id": "p1.3",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 60.72,
                "t": 878.64,
                "r": 250.56,
                "b": 865.68
            },
            "text": "ROLL CALL: Tim Dolan- arrived at 7:42 p.m."
        },
        {
            "id": "p1.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 312.48,
                "t": 878.64,
                "r": 461.76,
                "b": 865.92
            },
            "text": "Terence Wall, Township Representative"
        },
        {
            "id": "p1.5",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 132.96,
                "t": 863.28,
                "r": 427.68,
                "b": 850.32
            },
            "text": "Dr. Michele Campbell- Martin Flemming, Councilman"
        },
        {
            "id": "p1.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 131.28,
                "t": 841.44,
                "r": 444.24,
                "b": 828.24
            },
            "text": "Jeffrey Riker Joseph Riccardi, Mayor's Designee"
        },
        {
            "id": "p1.7",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 132.72,
                "t": 819.36,
                "r": 212.4,
                "b": 807.84
            },
            "text": "Anthony Luisi- Alt #1"
        },
        {
            "id": "p1.8",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 132.24,
                "t": 807.36,
                "r": 213.6,
                "b": 796.08
            },
            "text": "Manuela Brito-Alt #2"
        },
        {
            "id": "p1.9",
            "order": 9,
            "type": "text",
            "bbox": {
                "l": 313.44,
                "t": 819.84,
                "r": 431.52,
                "b": 806.64
            },
            "text": "Robert Hudak, Board Chairman"
        },
        {
            "id": "p1.10",
            "order": 10,
            "type": "text",
            "bbox": {
                "l": 60.72,
                "t": 769.68,
                "r": 282.48,
                "b": 756.72
            },
            "text": "Absent: Andrew Jozwicki, Len Haring, Board Vice Chairman"
        },
        {
            "id": "p1.11",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 60.72,
                "t": 747.12,
                "r": 565.2,
                "b": 723.36
            },
            "text": "Also Present: Planning Board Attorney Sean Gertner, M r. Peters, Board Planner, Doug M r. Klee, Board Engineer, Denise Buono, Planning Board Secretary, Anthony Jacob, Township I.T. representative, and Danielle Sinowitz, Planning Board Recording Secretary."
        },
        {
            "id": "p1.12",
            "order": 12,
            "type": "text",
            "bbox": {
                "l": 60.72,
                "t": 700.32,
                "r": 577.44,
                "b": 610.08
            },
            "text": "M r. Hudak advised there was correspondence with Macedonia Baptist Church and there was a question in the ruling regarding the septic system. Mr. Klee stated there was a condition of the approval that the church provide a pinelands approved system and it was asked the Board not include that condition and they provide an expanded system and there was a letter from the attorney and there is a 20% increase in the standard disposal field and there will be an advanced treatment system and any expansion for the church or expansion of use there will have to be an application to come back before the Board to take the extra step to see if what is being proposed is acceptable on the existing system and there is no issues and the church has gone above and beyond. Mr. Peters concurred with Mr. Klee, the applicant has gone above and beyond the requirements and met the Board more than halfway."
        },
        {
            "id": "p1.13",
            "order": 13,
            "type": "text",
            "bbox": {
                "l": 60.72,
                "t": 599.52,
                "r": 540.72,
                "b": 573.12
            },
            "text": "Motion to amend the Resolution for Macedonia Baptist Church by CAM PBELL/ Flemming. Yes: Campbell, Riker, Luisi, Brito, Wall, Flemming, Riccardi, Haring, Hudak."
        },
        {
            "id": "p1.14",
            "order": 14,
            "type": "text",
            "bbox": {
                "l": 60.96,
                "t": 561.6,
                "r": 538.32,
                "b": 535.68
            },
            "text": "Resolutions: Dubin Contracting, LLC, Block 3601, Lots 2, 3, 5 & 6- Motion to approve by FLEM MING/ Wall. Yes: Luisi, Brito, Wall, Flemming, Haring, Hudak."
        },
        {
            "id": "p1.15",
            "order": 15,
            "type": "text",
            "bbox": {
                "l": 60.72,
                "t": 523.2,
                "r": 560.4,
                "b": 497.76
            },
            "text": "Royale Property Management, Block 14101, Lot 18, 211 Brewers Bridge Road- Motion to approve by LUISI/ Flemming. Yes: Campbell, Riker, Luisi, Wall, Flemming, Riccardi, Hudak."
        },
        {
            "id": "p1.16",
            "order": 16,
            "type": "text",
            "bbox": {
                "l": 60.72,
                "t": 485.28,
                "r": 571.2,
                "b": 459.84
            },
            "text": "Luxor Drive 1426, LLC, Block 13401, Lots 2.02, 4.01 15, 16, 24 & 26 Green Valley Road- Motion to approve by LUISI/ Brito. Yes: Campbell, Luisi, Brito, Wall, Flemming, Riccardi."
        },
        {
            "id": "p1.17",
            "order": 17,
            "type": "text",
            "bbox": {
                "l": 60.48,
                "t": 447.12,
                "r": 561.12,
                "b": 434.64
            },
            "text": "Payment of Recording Secretary, Danielle Sinowitz, for 7/26/21 motioned by RIKER/ Flemming. Yes: All in favor among those present."
        },
        {
            "id": "p1.18",
            "order": 18,
            "type": "text",
            "bbox": {
                "l": 60.48,
                "t": 421.92,
                "r": 553.44,
                "b": 396.96
            },
            "text": "Payment of Planning Board Secretary, Denise Buono, for 7/26/21 motioned by CAMPBELL/ Flemming. Yes: All in favor among those present."
        },
        {
            "id": "p1.19",
            "order": 19,
            "type": "text",
            "bbox": {
                "l": 60.96,
                "t": 384.24,
                "r": 562.56,
                "b": 359.52
            },
            "text": "Motion to approve regular meeting minutes from June 21, 2021, by FLEMMING/ Luisi. Yes: Riker, Luisi, Brito, Wall, Flemming, Riccardi, Hudak."
        },
        {
            "id": "p1.20",
            "order": 20,
            "type": "text",
            "bbox": {
                "l": 60.24,
                "t": 346.32,
                "r": 577.2,
                "b": 231.84
            },
            "text": "1. Adventure Crossing Phase 3- Mr. Klee stated this a continuation of an application for preliminary final site plan approval for a mixed use development of phase 3 of Adventure Crossing and there was some history provided and the Board did get to a point where the absence of architecture was asked to see the floor area and parking, and the applicant has provided those and there is one feature missing which is the clubhouse between the parking, there was a report from July 23, 2021, and the applicant should fill in the blanks and there are discrepancies with the plan provided vs what was originally submitted, and the residential units have stayed the same at 480 units. Mr. Peters stated there was a report dated July 23, 2021 which was the second review letter and it should be noted there is an application for preliminary and final for the 3 phases of phase 3 and there is conditional use approval for the solar fields and it was originally a preliminary approval for phase 3 and final for 1 phase and now it is preliminary and final for all 3 and as indicated the architect plans and site plans need to be reconciled and it should be gone through and it should be placed on the record."
        },
        {
            "id": "p1.21",
            "order": 21,
            "type": "text",
            "bbox": {
                "l": 60.72,
                "t": 220.08,
                "r": 566.88,
                "b": 168.24
            },
            "text": "Sal Alfieri- attorney for the applicant- advised this is a continued public hearing, and Mr. Borden provided the summary and at that time only preliminary was being requested and now there are architectures, and the applicant is seeking preliminary and final and the conditional use approval and there are 4 witnesses, Ian Borden, Art Bernard, John Rea, and Graham Macfarlane, and Mr. Cardinale is also present and Mr. Borden will be introduced again"
        },
        {
            "id": "p1.22",
            "order": 22,
            "type": "text",
            "bbox": {
                "l": 60.96,
                "t": 156.72,
                "r": 573.6,
                "b": 16.8
            },
            "text": "Ian Borden- sworn- M r. Alfieri asked if the plans submitted since the last hearing were prepared under his supervision. M r. Borden advised that was correct, and there were 13 exhibits submitted to the Board earlier and Exhibit A-1 through Exhibit A-5 was gone through and Exhibit A-6, and Exhibit A-7 were prepared by PDS, and Exhibit A-8 through A-13 are architecture renderings. Exhibit A-6 is the phase 2 overall site plan and after the June 21 hearing it was presented the architectures for phase A which is the \"L\" shaped buildings and since then there have been workings done and there are now floor plans and color renderings and the general layout of the project, the access, the drainage, and the grading as well, and one thing that has been changed is the building numbers and the building 500 and 510 are 2 mixed use buildings, and building 520 and 530 are 3 story buildings with the 2 floor residential above the commercial space, and there is 540 -570 which are partially mixed use and partially residential and building 580 and 590 are 2 residential buildings with a clubhouse in the middle and in addition some other items that were heard is the pedestrian connection between phase 3 and 1. M r. Borden advised Exhibit A-7 is the pedestrian walkway plan which shows the entire project including phase 4 and phase 1 is to the right and to the right of that is the phase 2 warehouses, and as discussed the pedestrian walkway was discussed and once phase 4 is developed there will be a paved"
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}