{
    "document_id": 10404,
    "page": 74,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10515,
    "item_count": 25,
    "counts_by_type": {
        "footer": 1,
        "header": 2,
        "heading": 3,
        "list": 2,
        "list_item": 6,
        "text": 11
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p74.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 78.0258,
                "t": 726.5791,
                "r": 236.9496,
                "b": 692.311
            },
            "text": "23 December 2020\nMr. Jeffrey Weiner, AIA, Executive Vice President\nPage 3 of 4",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p74.2",
            "order": 2,
            "type": "header",
            "bbox": {
                "l": 78.5045,
                "t": 684.6427,
                "r": 271.8936,
                "b": 643.1855
            },
            "text": "Reference: Proposal for Engineering Services\nFuel and QTA System Design\nProposed Airport Rental Car Facility\nSarasota Bradenton International Airport",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p74.3",
            "order": 3,
            "type": "list",
            "bbox": {
                "l": 95.0192,
                "t": 622.5767,
                "r": 528.7086,
                "b": 561.4693
            },
            "text": "",
            "attrs": {
                "item_count": 3
            },
            "children": [
                {
                    "id": "p74.3.1",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 95.0192,
                        "t": 622.5767,
                        "r": 474.6171,
                        "b": 611.0741
                    },
                    "text": "10% Project Design Criteria narrative related to the above in-scope design elements;"
                },
                {
                    "id": "p74.3.2",
                    "order": 5,
                    "type": "list_item",
                    "bbox": {
                        "l": 95.4978,
                        "t": 609.6363,
                        "r": 301.3328,
                        "b": 598.1337
                    },
                    "text": "20% Schematic Design package to include:"
                },
                {
                    "id": "p74.3.3",
                    "order": 6,
                    "type": "list_item",
                    "bbox": {
                        "l": 129.7239,
                        "t": 597.1752,
                        "r": 528.7086,
                        "b": 561.4693
                    },
                    "text": "Schematic design documents illustrating the scale and relationship of the primary project engineering components in common between each of the project construction phases.",
                    "marker": "-"
                }
            ]
        },
        {
            "id": "p74.4",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 129.4846,
                "t": 559.5522,
                "r": 413.106,
                "b": 547.81
            },
            "text": "Preliminary options for fueling and equipment design; and"
        },
        {
            "id": "p74.5",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 129.4846,
                "t": 547.0911,
                "r": 449.9648,
                "b": 535.8281
            },
            "text": "Initial drawings and model completed to a 20% level of completion."
        },
        {
            "id": "p74.6",
            "order": 9,
            "type": "list_item",
            "bbox": {
                "l": 95.2585,
                "t": 534.3903,
                "r": 313.0606,
                "b": 522.8877
            },
            "text": "40% Design Development package to include:"
        },
        {
            "id": "p74.7",
            "order": 10,
            "type": "text",
            "bbox": {
                "l": 129.9632,
                "t": 521.4499,
                "r": 228.5725,
                "b": 510.6663
            },
            "text": "40% drawings"
        },
        {
            "id": "p74.8",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 129.9632,
                "t": 509.2284,
                "r": 297.982,
                "b": 498.2051
            },
            "text": "Preliminary specifications, and"
        },
        {
            "id": "p74.9",
            "order": 12,
            "type": "text",
            "bbox": {
                "l": 129.0059,
                "t": 497.007,
                "r": 345.1326,
                "b": 485.744
            },
            "text": "Updated Project Design Criteria narrative."
        },
        {
            "id": "p74.10",
            "order": 13,
            "type": "list",
            "bbox": {
                "l": 95.4978,
                "t": 484.3062,
                "r": 362.1259,
                "b": 460.5821
            },
            "text": "",
            "attrs": {
                "item_count": 2
            },
            "children": [
                {
                    "id": "p74.10.1",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 95.4978,
                        "t": 484.3062,
                        "r": 362.1259,
                        "b": 472.8036
                    },
                    "text": "60%, 95%, and 100% Construction Documents to include:",
                    "marker": "•"
                },
                {
                    "id": "p74.10.2",
                    "order": 15,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.2026,
                        "t": 471.8451,
                        "r": 230.2479,
                        "b": 460.5821
                    },
                    "text": "Drawings; and",
                    "marker": "•"
                }
            ]
        },
        {
            "id": "p74.11",
            "order": 16,
            "type": "text",
            "bbox": {
                "l": 129.2452,
                "t": 459.6236,
                "r": 412.1486,
                "b": 448.121
            },
            "text": "Specifications completed to the appropriate level of detail."
        },
        {
            "id": "p74.12",
            "order": 17,
            "type": "text",
            "bbox": {
                "l": 128.7665,
                "t": 446.9228,
                "r": 517.9382,
                "b": 422.2402
            },
            "text": "We have assumed that 100% documents will be sealed by a Florida Professional Engineer and that response to up to two rounds of agency comments are included."
        },
        {
            "id": "p74.13",
            "order": 18,
            "type": "text",
            "bbox": {
                "l": 77.3078,
                "t": 412.6548,
                "r": 522.9644,
                "b": 387.2533
            },
            "text": "Included in the design phase services will be one on-site meeting or site walk, and attendance at weekly design meetings and virtual design coordination meetings."
        },
        {
            "id": "p74.14",
            "order": 19,
            "type": "heading",
            "bbox": {
                "l": 78.5045,
                "t": 375.2714,
                "r": 137.8616,
                "b": 363.2896
            },
            "text": "Bid Support",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p74.15",
            "order": 20,
            "type": "text",
            "bbox": {
                "l": 77.3078,
                "t": 349.6303,
                "r": 507.6465,
                "b": 324.9477
            },
            "text": "Stantec will support the bid process by providing responses to bidder questions and attending bidder meetings via teleconference or virtual meeting."
        },
        {
            "id": "p74.16",
            "order": 21,
            "type": "heading",
            "bbox": {
                "l": 78.7438,
                "t": 312.0073,
                "r": 211.5792,
                "b": 300.5047
            },
            "text": "Construction Administration",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p74.17",
            "order": 22,
            "type": "text",
            "bbox": {
                "l": 77.3078,
                "t": 288.0436,
                "r": 511.2366,
                "b": 264.5592
            },
            "text": "Stantec has assumed that construction administration services are not included at this time, but could provide a proposal for those additional services at a later date."
        },
        {
            "id": "p74.18",
            "order": 23,
            "type": "heading",
            "bbox": {
                "l": 78.2652,
                "t": 252.3377,
                "r": 129.0059,
                "b": 239.8766
            },
            "text": "Permitting",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p74.19",
            "order": 24,
            "type": "text",
            "bbox": {
                "l": 77.3078,
                "t": 227.6551,
                "r": 531.5808,
                "b": 202.4932
            },
            "text": "Stantec has assumed that all permitting will be completed by others and has not included permitting in this scope of work."
        },
        {
            "id": "p74.20",
            "order": 25,
            "type": "footer",
            "bbox": {
                "l": 81.8553,
                "t": 113.3483,
                "r": 199.1334,
                "b": 102.8042
            },
            "text": "Design with community in mind",
            "attrs": {
                "block_label": "footer"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}