            "id": "p54.1",
            "order": 1,
            "type": "figure",
            "bbox": {
                "l": 78.72,
                "t": 708.24,
                "r": 525.36,
                "b": 548.64
            },
            "text": "",
            "attrs": {
                "block_label": "image",
                "embedded_text": "Additional Smface Parking\nle-it'_ , rentll car or I r 'J-lt?rm l\nCe ll Lot Locatio"
            }
        },
        {
            "id": "p54.2",
            "order": 2,
            "type": "caption",
            "bbox": {
                "l": 76.8,
                "t": 547.44,
                "r": 264,
                "b": 536.64
            },
            "text": "Figure 2 – Overflow parking and Cell Lot Relocation",
            "attrs": {
                "block_label": "figure_title"
            }
        },
        {
            "id": "p54.3",
            "order": 3,
            "type": "caption",
            "bbox": {
                "l": 319.92,
                "t": 547.44,
                "r": 459.6,
                "b": 537.12
            },
            "text": "Figure 3 – Future RV and Boat Storage",
            "attrs": {
                "block_label": "figure_title"
            }
        },
        {
            "id": "p54.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 76.08,
                "t": 523.68,
                "r": 524.16,
                "b": 459.36
            },
            "text": "The project will also include the relocation of the existing RV & boat storage facility to the northeast of the proposed rental car facility just east of Runway 32 (see Figure 3). This will require an Environmental Site Assessment (ESA), decommissioning, and demolition of the existing facility at this location. This scope includes civil water and sanitary design for potential restroom / admin building on the relocated site."
        },
        {
            "id": "p54.5",
            "order": 5,
            "type": "heading",
            "bbox": {
                "l": 77.28,
                "t": 445.44,
                "r": 163.2,
                "b": 433.68
            },
            "text": "II. Basic Services",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p54.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 76.08,
                "t": 420,
                "r": 523.44,
                "b": 367.68
            },
            "text": "For the purposes of scope definition and Consultant fee development, the work has been divided into the following tasks. Modifications and/or revisions to these tasks will constitute a change in the project scope and may require a revision to the compensation to be paid to the Consultant. These tasks will begin once PGAL provides the Consultant with a written Notice to Proceed."
        },
        {
            "id": "p54.7",
            "order": 7,
            "type": "heading",
            "bbox": {
                "l": 98.4,
                "t": 355.2,
                "r": 287.76,
                "b": 343.44
            },
            "text": "1. Project Management and Coordination",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p54.8",
            "order": 8,
            "type": "list_item",
            "bbox": {
                "l": 132.48,
                "t": 341.52,
                "r": 528.48,
                "b": 251.52
            },
            "text": "The Consultant will provide project management tasks including bookkeeping, billing, and coordination with project stakeholders. The Project Manager (PM) will be available to the project team and PGAL to oversee necessary project related elements. The PM will keep PGAL advised of the work progress, schedule, and anticipated review dates. The PM will be the Consultant's main point of contact and will be responsible for ensuring that the project's goals and objectives are met within the agreed upon schedule."
        },
        {
            "id": "p54.9",
            "order": 9,
            "type": "heading",
            "bbox": {
                "l": 98.16,
                "t": 238.08,
                "r": 297.12,
                "b": 225.84
            },
            "text": "2. Programming / Pre-Design Services (10%)",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p54.10",
            "order": 10,
            "type": "list",
            "bbox": {
                "l": 132.72,
                "t": 224.4,
                "r": 517.44,
                "b": 94.8
            },
            "text": "",
            "attrs": {
                "item_count": 3
            },
            "children": [
                {
                    "id": "p54.10.1",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 133.2,
                        "t": 224.4,
                        "r": 506.88,
                        "b": 174
                    },
                    "text": "Under this task the Consultant will determine and document of quantitative and qualitative expectations and basis of design for the project beyond that which has occurred to date and to be used as a baseline in subsequent schematic and design development."
                },
                {
                    "id": "p54.10.2",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 133.2,
                        "t": 172.08,
                        "r": 517.2,
                        "b": 134.16
                    },
                    "text": "The Consultant's PM and/or appropriate technical leads will prepare for and attend approximately four (4) web-based owner optional workshop/ progress meetings and one (1) in person workshop/presentation meeting.",
                    "marker": "-"
                },
                {
                    "id": "p54.10.3",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 132.72,
                        "t": 132.48,
                        "r": 517.44,
                        "b": 94.8
                    },
                    "text": "Design Concept Validation and Project Baseline. Review and establish with Owner all engineering and system design criteria and strategies. Conduct reviews of Owner documents, record drawings and existing reports.",
                    "marker": "•"
                }
            ]
        },
        {
            "id": "p54.11",
            "order": 14,
            "type": "text",
            "bbox": {
                "l": 280.32,
                "t": 58.08,
                "r": 327.6,
                "b": 46.8
            },
            "text": "Page 2 of 9",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}