{
    "document_id": 10404,
    "page": 45,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10515,
    "item_count": 26,
    "counts_by_type": {
        "figure": 1,
        "footer": 1,
        "header": 4,
        "heading": 3,
        "list": 2,
        "list_item": 14,
        "text": 1
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p45.1",
            "order": 1,
            "type": "figure",
            "bbox": {
                "l": 48.826,
                "t": 750.0635,
                "r": 118.7141,
                "b": 679.6103
            },
            "text": "",
            "attrs": {
                "role": "page_header",
                "block_label": "header_image"
            }
        },
        {
            "id": "p45.2",
            "order": 2,
            "type": "header",
            "bbox": {
                "l": 124.6977,
                "t": 749.8239,
                "r": 259.9265,
                "b": 677.9328
            },
            "text": "MASTER\nCONSULTING\nENGINEERS, INC.\nSTRUCTURAL CONSULTANTS",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p45.3",
            "order": 3,
            "type": "header",
            "bbox": {
                "l": 312.1032,
                "t": 755.3356,
                "r": 427.9452,
                "b": 726.8188
            },
            "text": "5523 WEST CYPRESS ST., SUITE 200\nTAMPA, FLORIDA 33607\nP (813) 287-3600 F (813) 287-3622",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p45.4",
            "order": 4,
            "type": "header",
            "bbox": {
                "l": 443.5025,
                "t": 755.0959,
                "r": 560.0626,
                "b": 727.298
            },
            "text": "4101 RAVENSWOOD RD., SUITE. 307\nFT. LAUDERDALE, FLORIDA 33312\nP (954) 210-7671 F (813) 287-3622",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p45.5",
            "order": 5,
            "type": "header",
            "bbox": {
                "l": 445.6566,
                "t": 717.9522,
                "r": 560.3019,
                "b": 680.0896
            },
            "text": "5950 LAKEHURST DR., SUITE. 183\nORLANDO, FLORIDA 32819\nP (407) 351-2384 F (813) 287-3622\nwww.mcengineers.com",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p45.6",
            "order": 6,
            "type": "heading",
            "bbox": {
                "l": 78.0258,
                "t": 641.0287,
                "r": 361.8866,
                "b": 629.0469
            },
            "text": "MCE Basic Scope of Service for this project is estimated as follow:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p45.7",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 77.7865,
                "t": 628.0884,
                "r": 530.8627,
                "b": 602.6868
            },
            "text": "The project scope will be consist of three phases, schematic/ design development phase and a construction document phase."
        },
        {
            "id": "p45.8",
            "order": 8,
            "type": "heading",
            "bbox": {
                "l": 112.4912,
                "t": 589.2672,
                "r": 340.3457,
                "b": 577.2853
            },
            "text": "Schematic / Design Development phase will include:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p45.9",
            "order": 9,
            "type": "list",
            "bbox": {
                "l": 112.2519,
                "t": 576.3268,
                "r": 530.6234,
                "b": 472.8036
            },
            "text": "",
            "attrs": {
                "item_count": 7
            },
            "children": [
                {
                    "id": "p45.9.1",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.2519,
                        "t": 576.3268,
                        "r": 442.7845,
                        "b": 564.1053
                    },
                    "text": "Kick-off meeting to go over project goals, owner's expectation, schedule",
                    "marker": "a)"
                },
                {
                    "id": "p45.9.2",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.4912,
                        "t": 563.3864,
                        "r": 447.8107,
                        "b": 551.6442
                    },
                    "text": "Determine the load requirements for the design of the building structure.",
                    "marker": "b)"
                },
                {
                    "id": "p45.9.3",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.2519,
                        "t": 550.2064,
                        "r": 516.7415,
                        "b": 538.2245
                    },
                    "text": "We will provide wind loads design pressures to be used by windows, doors manufacturer.",
                    "marker": "c)"
                },
                {
                    "id": "p45.9.4",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.7305,
                        "t": 537.266,
                        "r": 530.6234,
                        "b": 513.3023
                    },
                    "text": "Preliminary layout of the building structure, including foundations/slab requirements for car wash equipment.",
                    "marker": "d)"
                },
                {
                    "id": "p45.9.5",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.4912,
                        "t": 511.8644,
                        "r": 263.9953,
                        "b": 499.643
                    },
                    "text": "Preliminary structural framing.",
                    "marker": "e)"
                },
                {
                    "id": "p45.9.6",
                    "order": 15,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.4912,
                        "t": 498.4448,
                        "r": 257.2937,
                        "b": 486.9422
                    },
                    "text": "Preliminary foundation sizes.",
                    "marker": "f)"
                },
                {
                    "id": "p45.9.7",
                    "order": 16,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.4912,
                        "t": 485.744,
                        "r": 374.0931,
                        "b": 472.8036
                    },
                    "text": "Prepare narrative/preliminary drawings for deliverables.",
                    "marker": "g)"
                }
            ]
        },
        {
            "id": "p45.10",
            "order": 17,
            "type": "heading",
            "bbox": {
                "l": 112.7305,
                "t": 460.1029,
                "r": 322.8737,
                "b": 447.8814
            },
            "text": "The Construction Documents phase will include:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p45.11",
            "order": 18,
            "type": "list",
            "bbox": {
                "l": 114.94,
                "t": 445.20560000000006,
                "r": 529.238064,
                "b": 346.21560000000005
            },
            "text": "",
            "attrs": {
                "item_count": 7
            },
            "children": [
                {
                    "id": "p45.11.1",
                    "order": 19,
                    "type": "list_item",
                    "bbox": {
                        "l": 115.59,
                        "t": 445.20560000000006,
                        "r": 529.238064,
                        "b": 436.6956
                    },
                    "text": "Attend approximately 4 coordination meetings during the CD phase, meetings may be via the web.",
                    "marker": "a)"
                },
                {
                    "id": "p45.11.2",
                    "order": 20,
                    "type": "list_item",
                    "bbox": {
                        "l": 115.76,
                        "t": 419.28560000000004,
                        "r": 503.1876,
                        "b": 410.77560000000005
                    },
                    "text": "Finalize the foundation design with coordination for the required underground utilities.",
                    "marker": "b)"
                },
                {
                    "id": "p45.11.3",
                    "order": 21,
                    "type": "list_item",
                    "bbox": {
                        "l": 115.59,
                        "t": 406.33560000000006,
                        "r": 429.7366,
                        "b": 397.82560000000007
                    },
                    "text": "Slab on grade design, include details as needed for the car wash areas.",
                    "marker": "c)"
                },
                {
                    "id": "p45.11.4",
                    "order": 22,
                    "type": "list_item",
                    "bbox": {
                        "l": 115.35,
                        "t": 393.36560000000003,
                        "r": 314.2698,
                        "b": 384.85560000000004
                    },
                    "text": "Complete structural framing of the building",
                    "marker": "d)"
                },
                {
                    "id": "p45.11.5",
                    "order": 23,
                    "type": "list_item",
                    "bbox": {
                        "l": 115.35,
                        "t": 380.64560000000006,
                        "r": 328.04352,
                        "b": 372.13560000000007
                    },
                    "text": "Roof framing including roof slope for drainage.",
                    "marker": "e)"
                },
                {
                    "id": "p45.11.6",
                    "order": 24,
                    "type": "list_item",
                    "bbox": {
                        "l": 114.94,
                        "t": 367.6856,
                        "r": 312.45876,
                        "b": 359.17560000000003
                    },
                    "text": "Production of the construction documents.",
                    "marker": "f)"
                },
                {
                    "id": "p45.11.7",
                    "order": 25,
                    "type": "list_item",
                    "bbox": {
                        "l": 115.12,
                        "t": 354.72560000000004,
                        "r": 226.7076,
                        "b": 346.21560000000005
                    },
                    "text": "QA/QC of deliverables.",
                    "marker": "g)"
                }
            ]
        },
        {
            "id": "p45.12",
            "order": 26,
            "type": "footer",
            "bbox": {
                "l": 165.6253,
                "t": 35.7059,
                "r": 440.1517,
                "b": 23.4844
            },
            "text": "Structural Engineering | Threshold Inspections | Forensic Engineering",
            "attrs": {
                "block_label": "footer"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}