{
    "document_id": 10404,
    "page": 29,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10515,
    "item_count": 26,
    "counts_by_type": {
        "footer": 2,
        "header": 2,
        "heading": 5,
        "list": 2,
        "list_item": 12,
        "text": 3
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p29.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 78.5352,
                "t": 738.0817,
                "r": 262.1831,
                "b": 726.5791
            },
            "text": "Sarasota Bradenton International Airport",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p29.2",
            "order": 2,
            "type": "header",
            "bbox": {
                "l": 351.9718,
                "t": 738.0817,
                "r": 530.1127,
                "b": 726.0998
            },
            "text": "Scope of Services for a New QTA Facility",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p29.3",
            "order": 3,
            "type": "list_item",
            "bbox": {
                "l": 111.5775,
                "t": 703.0947,
                "r": 522.4507,
                "b": 677.4536
            },
            "text": "Cost Management through establishment of realistic capital costs of construction. Analyze and develop the best course of action in regard to cost estimation and cost control.",
            "marker": "-"
        },
        {
            "id": "p29.4",
            "order": 4,
            "type": "heading",
            "bbox": {
                "l": 78.0563,
                "t": 664.5132,
                "r": 347.9014,
                "b": 653.0106
            },
            "text": "4.0 CONSTRUCTION DOCUMENTS – 60%, 95% AND 100%",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p29.5",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 110.3803,
                "t": 651.0935,
                "r": 529.6338,
                "b": 560.7504
            },
            "text": "Based on the approval of the Design Development Documents, Owner authorization of any adjustments in the project requirements and the budget for the cost of the work, prepare Construction Documents for project construction phase and coordinate to be bid as one project. The Construction Documents shall illustrate and describe the further development of the approved Design Development documents and shall consist of drawings and specifications setting forth in detail the specific materials, procedures, systems and other requirements for the construction of the work."
        },
        {
            "id": "p29.6",
            "order": 6,
            "type": "heading",
            "bbox": {
                "l": 112.7746,
                "t": 551.4045,
                "r": 158.507,
                "b": 539.902
            },
            "text": "Meetings",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p29.7",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 112.0563,
                "t": 538.4641,
                "r": 521.7324,
                "b": 512.3437
            },
            "text": "The Designer will conduct, as needed and as required, approximately six (6) web-based owner optional workshop/progress meetings and two (2) in person workshop/presentation meetings."
        },
        {
            "id": "p29.8",
            "order": 8,
            "type": "heading",
            "bbox": {
                "l": 112.7746,
                "t": 499.643,
                "r": 171.1972,
                "b": 487.9008
            },
            "text": "Deliverables",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p29.9",
            "order": 9,
            "type": "list",
            "bbox": {
                "l": 111.8169,
                "t": 485.9837,
                "r": 529.3944,
                "b": 342.2015
            },
            "text": "",
            "attrs": {
                "item_count": 5
            },
            "children": [
                {
                    "id": "p29.9.1",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.0563,
                        "t": 485.9837,
                        "r": 529.3944,
                        "b": 422.7195
                    },
                    "text": "60% and 95% CD drawings consisting of plans, sections, elevations, enlarged floor plans, design details, schedules, single line diagrams, material specifications, written scope of work narrative, construction operations safety plan, project phasing plans, final engineering reports, construction material sample boards for finishes and code required drawings in electronic PDF format to the Owner."
                },
                {
                    "id": "p29.9.2",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.2958,
                        "t": 420.5628,
                        "r": 517.1831,
                        "b": 396.5991
                    },
                    "text": "Report on the 60% and 95% design construction cost estimate in electronic PDF format to the Owner."
                },
                {
                    "id": "p29.9.3",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 111.8169,
                        "t": 394.2027,
                        "r": 506.169,
                        "b": 382.2209
                    },
                    "text": "100% Issued for Bid drawings and specifications in electronic PDF format to the Owner."
                },
                {
                    "id": "p29.9.4",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.5352,
                        "t": 380.7831,
                        "r": 517.1831,
                        "b": 357.059
                    },
                    "text": "100% Issued for Bid drawings in full size physical sets for Code Review Submittal and code review fee."
                },
                {
                    "id": "p29.9.5",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.2958,
                        "t": 354.1834,
                        "r": 297.8592,
                        "b": 342.2015
                    },
                    "text": "Printed copies, if requested by Owner.",
                    "marker": "•"
                }
            ]
        },
        {
            "id": "p29.10",
            "order": 15,
            "type": "heading",
            "bbox": {
                "l": 112.7746,
                "t": 328.5422,
                "r": 187.9577,
                "b": 317.0396
            },
            "text": "Review Meeting",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p29.11",
            "order": 16,
            "type": "list_item",
            "bbox": {
                "l": 110.6197,
                "t": 314.8829,
                "r": 519.338,
                "b": 237.9595
            },
            "text": "After submittal of 60% and 95% CD drawings a review meeting will be conducted with the Owner at which time the Designer will incorporate requested modifications into the next phase of design. Understanding and agreement of the design construction cost estimate will be required between the Designer and the Owner prior to beginning the next task. Owner review times may impact expected design completion whereas remaining schedule will be modified."
        },
        {
            "id": "p29.12",
            "order": 17,
            "type": "heading",
            "bbox": {
                "l": 77.5775,
                "t": 224.5398,
                "r": 205.4366,
                "b": 213.2769
            },
            "text": "4.1 Architectural Design",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p29.13",
            "order": 18,
            "type": "list",
            "bbox": {
                "l": 111.5775,
                "t": 210.8805,
                "r": 526.5211,
                "b": 105.4402
            },
            "text": "",
            "attrs": {
                "item_count": 5
            },
            "children": [
                {
                    "id": "p29.13.1",
                    "order": 19,
                    "type": "list_item",
                    "bbox": {
                        "l": 111.5775,
                        "t": 210.8805,
                        "r": 415.9014,
                        "b": 198.8986
                    },
                    "text": "Prepare and submit for approval 60% and 95% design documents.",
                    "marker": "-"
                },
                {
                    "id": "p29.13.2",
                    "order": 20,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.0563,
                        "t": 196.7419,
                        "r": 436.9718,
                        "b": 185.2393
                    },
                    "text": "Verify inclusion of all the Owner's architectural program requirements.",
                    "marker": "-"
                },
                {
                    "id": "p29.13.3",
                    "order": 21,
                    "type": "list_item",
                    "bbox": {
                        "l": 111.5775,
                        "t": 183.5619,
                        "r": 519.5775,
                        "b": 159.8378
                    },
                    "text": "Coordinate with Owner with respect to the budget, schedule, phasing and constructability aspects of the design."
                },
                {
                    "id": "p29.13.4",
                    "order": 22,
                    "type": "list_item",
                    "bbox": {
                        "l": 112.0563,
                        "t": 157.2018,
                        "r": 526.5211,
                        "b": 132.7589
                    },
                    "text": "Coordinate with Owner proposed Construction Operations and Safety Plan, the contractor's access route(s) and staging areas."
                },
                {
                    "id": "p29.13.5",
                    "order": 23,
                    "type": "list_item",
                    "bbox": {
                        "l": 111.5775,
                        "t": 131.0814,
                        "r": 516.4648,
                        "b": 105.4402
                    },
                    "text": "Review the 60% and 95% CD drawings with local and state code officials, the fire marshal, TSA and FAA and incorporate required modifications as a result of the design review.",
                    "marker": "-"
                }
            ]
        },
        {
            "id": "p29.14",
            "order": 24,
            "type": "text",
            "bbox": {
                "l": 275.3521,
                "t": 57.7525,
                "r": 331.8592,
                "b": 46.2499
            },
            "text": "Page 9 of 11",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p29.15",
            "order": 25,
            "type": "footer",
            "bbox": {
                "l": 78.0563,
                "t": 58.2318,
                "r": 241.1127,
                "b": 46.7292
            },
            "text": "Exhibit A – General Scope of Services",
            "attrs": {
                "block_label": "footer"
            }
        },
        {
            "id": "p29.16",
            "order": 26,
            "type": "footer",
            "bbox": {
                "l": 442.4789,
                "t": 57.9921,
                "r": 530.1127,
                "b": 46.7292
            },
            "text": "Revised 12.23.2020",
            "attrs": {
                "block_label": "footer"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}