{
    "document_id": 10403,
    "page": 21,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10514,
    "item_count": 30,
    "counts_by_type": {
        "footer": 1,
        "header": 1,
        "heading": 11,
        "list": 1,
        "list_item": 8,
        "text": 8
    },
    "build_ms": 3,
    "items": [
        {
            "id": "p21.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 236.88,
                "t": 758.64,
                "r": 539.28,
                "b": 733.44
            },
            "text": "Sarasota Manatee Airport Authority\nSarasota Bradenton International Airport – Rehabilitate Taxiways C and F",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p21.2",
            "order": 2,
            "type": "heading",
            "bbox": {
                "l": 66.48,
                "t": 732.96,
                "r": 239.28,
                "b": 720
            },
            "text": "3. Project Manual and Specifications",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p21.3",
            "order": 3,
            "type": "heading",
            "bbox": {
                "l": 84.72,
                "t": 720,
                "r": 164.64,
                "b": 708
            },
            "text": "Level of Service:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p21.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 83.52,
                "t": 707.04,
                "r": 540,
                "b": 654.96
            },
            "text": "Incorporate review comments from the preliminary submittal, finalize the project manual and specifications for bidding. The project manual and specifications will be prepared using the standard specifications of FAA Advisory Circular 150/5370-10, latest change, adapted to the project including all FAA and/or FDOT approved deviations to standards."
        },
        {
            "id": "p21.5",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 84.24,
                "t": 643.92,
                "r": 540.24,
                "b": 604.32
            },
            "text": "The design team will complete edits to the specifications and technical provisions and finalize method and measurement of payment items. In addition, specifications will be reviewed against the plans for consistency."
        },
        {
            "id": "p21.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 85.2,
                "t": 592.56,
                "r": 510.48,
                "b": 579.36
            },
            "text": "The expected table of contents is as follows and will include all applicable technical provisions:"
        },
        {
            "id": "p21.7",
            "order": 7,
            "type": "list",
            "bbox": {
                "l": 102,
                "t": 578.64,
                "r": 538.56,
                "b": 471.36
            },
            "text": "",
            "attrs": {
                "item_count": 7
            },
            "children": [
                {
                    "id": "p21.7.1",
                    "order": 8,
                    "type": "list_item",
                    "bbox": {
                        "l": 102.96,
                        "t": 578.64,
                        "r": 209.28,
                        "b": 566.88
                    },
                    "text": "General Provisions",
                    "marker": "•"
                },
                {
                    "id": "p21.7.2",
                    "order": 9,
                    "type": "list_item",
                    "bbox": {
                        "l": 102.72,
                        "t": 565.2,
                        "r": 261.6,
                        "b": 552.96
                    },
                    "text": "FAA Mandatory Requirements",
                    "marker": "•"
                },
                {
                    "id": "p21.7.3",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 102.96,
                        "t": 551.28,
                        "r": 222,
                        "b": 539.76
                    },
                    "text": "SMAA Specifications",
                    "marker": "•"
                },
                {
                    "id": "p21.7.4",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 102.96,
                        "t": 538.08,
                        "r": 193.92,
                        "b": 526.08
                    },
                    "text": "Contract Forms"
                },
                {
                    "id": "p21.7.5",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 102.72,
                        "t": 524.64,
                        "r": 290.88,
                        "b": 512.16
                    },
                    "text": "Construction Safety and Phasing Plan"
                },
                {
                    "id": "p21.7.6",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 102.96,
                        "t": 510.96,
                        "r": 206.4,
                        "b": 499.2
                    },
                    "text": "Special Provisions"
                },
                {
                    "id": "p21.7.7",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 102,
                        "t": 497.76,
                        "r": 538.56,
                        "b": 471.36
                    },
                    "text": "Technical Provisions for Earthwork, Base Course, Surface Course, Drainage, Turfing, Signage, Lighting and Markings."
                }
            ]
        },
        {
            "id": "p21.8",
            "order": 15,
            "type": "heading",
            "bbox": {
                "l": 84.48,
                "t": 459.6,
                "r": 147.12,
                "b": 447.36
            },
            "text": "Deliverables:",
            "level": 3
        },
        {
            "id": "p21.9",
            "order": 16,
            "type": "list_item",
            "bbox": {
                "l": 83.52,
                "t": 445.68,
                "r": 539.04,
                "b": 419.76
            },
            "text": "Electronic PDF versions of the bidding project manual and specifications document will be submitted to the Airport, FAA and FDOT.",
            "marker": "-"
        },
        {
            "id": "p21.10",
            "order": 17,
            "type": "heading",
            "bbox": {
                "l": 66.72,
                "t": 408,
                "r": 286.32,
                "b": 395.28
            },
            "text": "4. Final Opinion of Probable Construction Cost",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p21.11",
            "order": 18,
            "type": "heading",
            "bbox": {
                "l": 84.48,
                "t": 394.32,
                "r": 164.64,
                "b": 382.32
            },
            "text": "Level of Service:",
            "level": 3
        },
        {
            "id": "p21.12",
            "order": 19,
            "type": "text",
            "bbox": {
                "l": 82.56,
                "t": 381.84,
                "r": 539.76,
                "b": 317.28
            },
            "text": "Finalize the opinion of probable construction cost based on the preliminary review comment and the final design. The Airport recognizes and agrees that Hanson does not have control over Contractor's pricing strategies or costs and that estimate may vary from actual bid or construction costs. The Airport also recognizes and agrees that the estimate is based on preliminary, not complete plans and that quantities and items will likely change as design progresses."
        },
        {
            "id": "p21.13",
            "order": 20,
            "type": "heading",
            "bbox": {
                "l": 84,
                "t": 306.24,
                "r": 146.88,
                "b": 293.52
            },
            "text": "Deliverables:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p21.14",
            "order": 21,
            "type": "text",
            "bbox": {
                "l": 83.04,
                "t": 292.8,
                "r": 539.28,
                "b": 266.88
            },
            "text": "Electronic PDF versions of the opinion of probable construction cost estimate will be submitted to the Airport, FAA, and FDOT."
        },
        {
            "id": "p21.15",
            "order": 22,
            "type": "heading",
            "bbox": {
                "l": 65.76,
                "t": 255.12,
                "r": 338.88,
                "b": 241.92
            },
            "text": "5. Prepare Modifications of Standard Design/Specifications",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p21.16",
            "order": 23,
            "type": "heading",
            "bbox": {
                "l": 84,
                "t": 241.44,
                "r": 163.92,
                "b": 229.68
            },
            "text": "Level of Service:",
            "level": 3
        },
        {
            "id": "p21.17",
            "order": 24,
            "type": "text",
            "bbox": {
                "l": 82.8,
                "t": 228.72,
                "r": 539.76,
                "b": 190.32
            },
            "text": "Prepare a list of modifications to FAA/FDOT design or specification standards that are known or anticipated. Provide a justification for each and coordinate with FAA/FDOT on the request for deviations as applicable."
        },
        {
            "id": "p21.18",
            "order": 25,
            "type": "heading",
            "bbox": {
                "l": 83.28,
                "t": 178.32,
                "r": 146.16,
                "b": 166.56
            },
            "text": "Deliverables:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p21.19",
            "order": 26,
            "type": "text",
            "bbox": {
                "l": 82.56,
                "t": 165.6,
                "r": 539.04,
                "b": 139.44
            },
            "text": "Electronic PDF versions of the list of modifications will be submitted to the Airport, FAA and FDOT as appropriate."
        },
        {
            "id": "p21.20",
            "order": 27,
            "type": "heading",
            "bbox": {
                "l": 66,
                "t": 127.44,
                "r": 168.72,
                "b": 114.96
            },
            "text": "6. Engineer's Report",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p21.21",
            "order": 28,
            "type": "heading",
            "bbox": {
                "l": 83.28,
                "t": 113.76,
                "r": 163.92,
                "b": 102
            },
            "text": "Level of Service:",
            "level": 3
        },
        {
            "id": "p21.22",
            "order": 29,
            "type": "text",
            "bbox": {
                "l": 82.08,
                "t": 102,
                "r": 538.56,
                "b": 63.12
            },
            "text": "Finalize the Engineer’s Report for the project. The report will discuss design criteria, specific design solutions, modifications to standards, copies of design calculations, construction time and cost estimates, and information used to estimate liquidated damages."
        },
        {
            "id": "p21.23",
            "order": 30,
            "type": "footer",
            "bbox": {
                "l": 316.8,
                "t": 42.48,
                "r": 323.52,
                "b": 32.88
            },
            "text": "7",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}