{
    "document_id": 10400,
    "page": 34,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10511,
    "item_count": 23,
    "counts_by_type": {
        "figure": 1,
        "footer": 2,
        "header": 1,
        "heading": 1,
        "list": 2,
        "list_item": 16
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p34.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 78.48,
                "t": 750.24,
                "r": 288.96,
                "b": 716.16
            },
            "text": "SRQ GENERAL AVIATION FIS FACILITY\nSARASOTA MANATEE AIRPORT AUTHORITY",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p34.2",
            "order": 2,
            "type": "figure",
            "bbox": {
                "l": 467.04,
                "t": 757.44,
                "r": 532.8,
                "b": 719.04
            },
            "text": "",
            "attrs": {
                "role": "page_header",
                "block_label": "header_image",
                "embedded_text": "COMPANIES\" c~s"
            }
        },
        {
            "id": "p34.3",
            "order": 3,
            "type": "list",
            "bbox": {
                "l": 129.84,
                "t": 702.24,
                "r": 534.48,
                "b": 616.56
            },
            "text": "",
            "attrs": {
                "item_count": 3
            },
            "children": [
                {
                    "id": "p34.3.1",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 129.84,
                        "t": 702.24,
                        "r": 439.44,
                        "b": 686.64
                    },
                    "text": "Further develop three-dimensional (BIM) design models.",
                    "marker": "2."
                },
                {
                    "id": "p34.3.2",
                    "order": 5,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.08,
                        "t": 675.36,
                        "r": 355.44,
                        "b": 659.76
                    },
                    "text": "Perform internal constructability review.",
                    "marker": "3."
                },
                {
                    "id": "p34.3.3",
                    "order": 6,
                    "type": "list_item",
                    "bbox": {
                        "l": 129.84,
                        "t": 648.48,
                        "r": 534.48,
                        "b": 616.56
                    },
                    "text": "Design Team shall coordinate between design discipline leads, other design team members, and airport for phasing to incorporate into drawings.",
                    "marker": "4."
                }
            ]
        },
        {
            "id": "p34.4",
            "order": 7,
            "type": "heading",
            "bbox": {
                "l": 131.52,
                "t": 606,
                "r": 158.16,
                "b": 591.84
            },
            "text": "Civil",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p34.5",
            "order": 8,
            "type": "list",
            "bbox": {
                "l": 124.8,
                "t": 579.36,
                "r": 534.96,
                "b": 86.88
            },
            "text": "",
            "attrs": {
                "item_count": 13
            },
            "children": [
                {
                    "id": "p34.5.1",
                    "order": 9,
                    "type": "list_item",
                    "bbox": {
                        "l": 131.28,
                        "t": 579.36,
                        "r": 534.48,
                        "b": 533.28
                    },
                    "text": "Finalize horizontal pavement geometrical layouts and place sufficient information on drawings to layout proposed pavements in field during construction.",
                    "marker": "1."
                },
                {
                    "id": "p34.5.2",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.08,
                        "t": 521.52,
                        "r": 534.72,
                        "b": 474.48
                    },
                    "text": "Develop preliminary three-dimensional design in order to develop pavement centerline profiles, typical sections, and other grading details for the proposed work.",
                    "marker": "2."
                },
                {
                    "id": "p34.5.3",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.32,
                        "t": 463.92,
                        "r": 534.24,
                        "b": 432.72
                    },
                    "text": "Finalize pavement designs for both the parking lot and taxiway and apron which includes a HMA and PCC pavement section.",
                    "marker": "3."
                },
                {
                    "id": "p34.5.4",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 129.84,
                        "t": 421.92,
                        "r": 534.48,
                        "b": 375.12
                    },
                    "text": "Develop preliminary drainage designs, including computation of surface water runoff volumes, and layout facilities necessary to accommodate expected flows..",
                    "marker": "4."
                },
                {
                    "id": "p34.5.5",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.56,
                        "t": 364.08,
                        "r": 309.6,
                        "b": 348.96
                    },
                    "text": "Develop water design concept.",
                    "marker": "5."
                },
                {
                    "id": "p34.5.6",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.8,
                        "t": 348.24,
                        "r": 326.16,
                        "b": 333.6
                    },
                    "text": "Develop electrical design concept.",
                    "marker": "6."
                },
                {
                    "id": "p34.5.7",
                    "order": 15,
                    "type": "list_item",
                    "bbox": {
                        "l": 131.04,
                        "t": 332.88,
                        "r": 305.04,
                        "b": 318.24
                    },
                    "text": "Develop fiber design concept.",
                    "marker": "7."
                },
                {
                    "id": "p34.5.8",
                    "order": 16,
                    "type": "list_item",
                    "bbox": {
                        "l": 131.04,
                        "t": 317.28,
                        "r": 310.56,
                        "b": 302.16
                    },
                    "text": "Develop sewer design concept.",
                    "marker": "8."
                },
                {
                    "id": "p34.5.9",
                    "order": 17,
                    "type": "list_item",
                    "bbox": {
                        "l": 129.84,
                        "t": 290.88,
                        "r": 534.72,
                        "b": 229.44
                    },
                    "text": "Develop SWFWMD permit documentation including stormwater routing models, and other necessary documentation. At the end of this phase, an environmental resource permit (ERP) application will be submitted to SWFWMD.",
                    "marker": "9."
                },
                {
                    "id": "p34.5.10",
                    "order": 18,
                    "type": "list_item",
                    "bbox": {
                        "l": 125.28,
                        "t": 218.16,
                        "r": 534.96,
                        "b": 186.96
                    },
                    "text": "Develop preliminary parking marking layouts and continue finalization of the airfield marking layouts.",
                    "marker": "10."
                },
                {
                    "id": "p34.5.11",
                    "order": 19,
                    "type": "list_item",
                    "bbox": {
                        "l": 125.04,
                        "t": 175.92,
                        "r": 526.56,
                        "b": 146.64
                    },
                    "text": "Develop preliminary jointing plans for the PCC and HMA pavement sections.",
                    "marker": "11."
                },
                {
                    "id": "p34.5.12",
                    "order": 20,
                    "type": "list_item",
                    "bbox": {
                        "l": 124.8,
                        "t": 145.2,
                        "r": 528,
                        "b": 114.24
                    },
                    "text": "Continue refinement of the airfield lighting and signage layouts and detailing.",
                    "marker": "12."
                },
                {
                    "id": "p34.5.13",
                    "order": 21,
                    "type": "list_item",
                    "bbox": {
                        "l": 124.8,
                        "t": 102.96,
                        "r": 534.48,
                        "b": 86.88
                    },
                    "text": "Develop preliminary designs of structural Project elements, such as catch",
                    "marker": "13."
                }
            ]
        },
        {
            "id": "p34.6",
            "order": 22,
            "type": "footer",
            "bbox": {
                "l": 479.76,
                "t": 66.96,
                "r": 533.28,
                "b": 54.72
            },
            "text": "Page 22 of 93",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p34.7",
            "order": 23,
            "type": "footer",
            "bbox": {
                "l": 78.96,
                "t": 67.68,
                "r": 138.72,
                "b": 54.96
            },
            "text": "August 2, 2021",
            "attrs": {
                "block_label": "footer"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}