{
    "document_id": 10400,
    "page": 30,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10511,
    "item_count": 24,
    "counts_by_type": {
        "figure": 1,
        "footer": 2,
        "header": 1,
        "heading": 3,
        "list": 3,
        "list_item": 14
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p30.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 78.72,
                "t": 749.76,
                "r": 289.2,
                "b": 716.4
            },
            "text": "SRQ GENERAL AVIATION FIS FACILITY\nSARASOTA MANATEE AIRPORT AUTHORITY",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p30.2",
            "order": 2,
            "type": "figure",
            "bbox": {
                "l": 467.52,
                "t": 757.44,
                "r": 533.52,
                "b": 718.56
            },
            "text": "",
            "attrs": {
                "role": "page_header",
                "block_label": "header_image",
                "embedded_text": "C®S\nCOMPANIES\""
            }
        },
        {
            "id": "p30.3",
            "order": 3,
            "type": "heading",
            "bbox": {
                "l": 131.04,
                "t": 701.28,
                "r": 208.32,
                "b": 687.36
            },
            "text": "Fire Protection",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p30.4",
            "order": 4,
            "type": "list",
            "bbox": {
                "l": 130.56,
                "t": 675.12,
                "r": 534.48,
                "b": 575.04
            },
            "text": "",
            "attrs": {
                "item_count": 3
            },
            "children": [
                {
                    "id": "p30.4.1",
                    "order": 5,
                    "type": "list_item",
                    "bbox": {
                        "l": 131.52,
                        "t": 675.12,
                        "r": 534.48,
                        "b": 643.2
                    },
                    "text": "Develop appropriate fire protection (fire suppression, alarm, and detection) strategy based on occupancy and construction type.",
                    "marker": "1."
                },
                {
                    "id": "p30.4.2",
                    "order": 6,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.56,
                        "t": 632.4,
                        "r": 534.48,
                        "b": 601.2
                    },
                    "text": "Perform water supply analysis to determine quality of available water supply.",
                    "marker": "2."
                },
                {
                    "id": "p30.4.3",
                    "order": 7,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.8,
                        "t": 590.64,
                        "r": 376.8,
                        "b": 575.04
                    },
                    "text": "Coordinate equipment layout and locations.",
                    "marker": "3."
                }
            ]
        },
        {
            "id": "p30.5",
            "order": 8,
            "type": "heading",
            "bbox": {
                "l": 131.76,
                "t": 563.52,
                "r": 180.96,
                "b": 549.12
            },
            "text": "Electrical",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p30.6",
            "order": 9,
            "type": "list",
            "bbox": {
                "l": 130.32,
                "t": 536.64,
                "r": 534.72,
                "b": 240.24
            },
            "text": "",
            "attrs": {
                "item_count": 8
            },
            "children": [
                {
                    "id": "p30.6.1",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 131.52,
                        "t": 536.64,
                        "r": 534.48,
                        "b": 505.92
                    },
                    "text": "Determine electrical load requirements (i.e. 208/120V, Single-phase/Three-Phase or 480/277V, Three-phase)",
                    "marker": "1."
                },
                {
                    "id": "p30.6.2",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.32,
                        "t": 494.16,
                        "r": 488.88,
                        "b": 478.32
                    },
                    "text": "Determine voltage availability in the area from the electrical utility",
                    "marker": "2."
                },
                {
                    "id": "p30.6.3",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.56,
                        "t": 467.28,
                        "r": 534.72,
                        "b": 436.32
                    },
                    "text": "Coordinate any utility infrastructure needs with the utility company (i.e. - utility switches, transformers, utility poles, etc.)",
                    "marker": "3."
                },
                {
                    "id": "p30.6.4",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.56,
                        "t": 425.04,
                        "r": 534.72,
                        "b": 378.96
                    },
                    "text": "Design major equipment components (panel boards, transformers, lighting, and appliance panels) within the electrical spaces with adherence to the National Electrical Code minimum requirements for clearances",
                    "marker": "4."
                },
                {
                    "id": "p30.6.5",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 131.28,
                        "t": 367.44,
                        "r": 358.56,
                        "b": 352.08
                    },
                    "text": "Determine preliminary panel board sizes",
                    "marker": "5."
                },
                {
                    "id": "p30.6.6",
                    "order": 15,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.8,
                        "t": 340.8,
                        "r": 534.48,
                        "b": 309.12
                    },
                    "text": "For interior lighting, the team will select preliminary luminaires and perform preliminary photometric calculations",
                    "marker": "6."
                },
                {
                    "id": "p30.6.7",
                    "order": 16,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.8,
                        "t": 298.32,
                        "r": 534.48,
                        "b": 282.24
                    },
                    "text": "Develop preliminary parking lot and exterior lighting plan and photometrics",
                    "marker": "7."
                },
                {
                    "id": "p30.6.8",
                    "order": 17,
                    "type": "list_item",
                    "bbox": {
                        "l": 131.04,
                        "t": 271.68,
                        "r": 534.24,
                        "b": 240.24
                    },
                    "text": "Provide preliminary CBP switching requirements to appropriate areas and rooms. Remaining spaces will adhere to energy code requirements",
                    "marker": "8."
                }
            ]
        },
        {
            "id": "p30.7",
            "order": 18,
            "type": "heading",
            "bbox": {
                "l": 131.76,
                "t": 228.96,
                "r": 285.36,
                "b": 213.84
            },
            "text": "Communications and Security",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p30.8",
            "order": 19,
            "type": "list",
            "bbox": {
                "l": 130.56,
                "t": 202.56,
                "r": 534.72,
                "b": 86.88
            },
            "text": "",
            "attrs": {
                "item_count": 3
            },
            "children": [
                {
                    "id": "p30.8.1",
                    "order": 20,
                    "type": "list_item",
                    "bbox": {
                        "l": 131.52,
                        "t": 202.56,
                        "r": 534.24,
                        "b": 156.24
                    },
                    "text": "Develop preliminary security system based on coordination with CBP requirements, to include video surveillance system, access control, system, intrusion detection system with a duress",
                    "marker": "1."
                },
                {
                    "id": "p30.8.2",
                    "order": 21,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.56,
                        "t": 144.96,
                        "r": 534.48,
                        "b": 114.24
                    },
                    "text": "Develop preliminary communication system based on coordination with CBP requirements",
                    "marker": "2."
                },
                {
                    "id": "p30.8.3",
                    "order": 22,
                    "type": "list_item",
                    "bbox": {
                        "l": 130.56,
                        "t": 102.48,
                        "r": 534.72,
                        "b": 86.88
                    },
                    "text": "Review communication/security-specific requirements related to CBP room",
                    "marker": "3."
                }
            ]
        },
        {
            "id": "p30.9",
            "order": 23,
            "type": "footer",
            "bbox": {
                "l": 480,
                "t": 66.72,
                "r": 533.28,
                "b": 54.72
            },
            "text": "Page 18 of 93",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p30.10",
            "order": 24,
            "type": "footer",
            "bbox": {
                "l": 79.2,
                "t": 67.68,
                "r": 138.24,
                "b": 54.72
            },
            "text": "August 2, 2021",
            "attrs": {
                "block_label": "footer"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}