{
    "document_id": 10395,
    "page": 71,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10508,
    "item_count": 14,
    "counts_by_type": {
        "footer": 1,
        "heading": 6,
        "text": 7
    },
    "build_ms": 2,
    "items": [
        {
            "id": "p71.1",
            "order": 1,
            "type": "heading",
            "bbox": {
                "l": 64.56,
                "t": 735.6,
                "r": 250.08,
                "b": 723.84
            },
            "text": "→ North Quad Development Project",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p71.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 76.56,
                "t": 724.08,
                "r": 577.68,
                "b": 611.52
            },
            "text": "The North Quad Development Project will construct roadway, utilities, and earthwork for future development within the 92-acres in the north portion of the airside land. Wright Construction was the low responsive bidder for the project, and their bid was approved by the Authority Board at the November 2018 meeting. Contracts have been executed, a pre-construction meeting was conducted on March 4, and an NTP was issued for April 1, 2019. Contractor has completed site clearing, rough grading, water and sewer lines are installed, and roadway work. FPL has relocated primary power and has installed the overhead power work. Contractor has remobilized to complete the remaining power hook-ups, and is waiting for FPL to install the power meter. Staff anticipates completion in December."
        },
        {
            "id": "p71.3",
            "order": 3,
            "type": "heading",
            "bbox": {
                "l": 65.28,
                "t": 600.48,
                "r": 255.36,
                "b": 588.48
            },
            "text": "→ Taxiway Bravo North Rehabilitation",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p71.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 69.36,
                "t": 588.96,
                "r": 578.16,
                "b": 501.12
            },
            "text": "The Taxiway Bravo Project will rehabilitate Taxiway Bravo north of Runway 14-32 to Runway 22. Kimley-Horn and Associates (KHA) was ranked first at the March Board meeting. KHA has completed the final design plans and the project was bid. The Board approved AJAX Paving as the low responsive bidder at the May, 2020 Board meeting. Staff has issued an NTP of September 17th for this project, and the contractor submitted their material submittals for review. Contractor has been unable to secure electrical items from their suppliers due to impacts from COVID. Project has been suspended until January 4th, 2021."
        },
        {
            "id": "p71.5",
            "order": 5,
            "type": "heading",
            "bbox": {
                "l": 65.52,
                "t": 489.36,
                "r": 198.72,
                "b": 477.6
            },
            "text": "Access Control Project",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p71.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 74.64,
                "t": 478.08,
                "r": 576.72,
                "b": 390
            },
            "text": "The Access Control Project will replace the current access control resulting in a unified security system with fully integrated video surveillance, physical access control, and access credential media issuance capabilities. AVCON has completed design, project was advertised for construction bids, and approval of the low responsive bidder was approved at the November Board meeting. A preconstruction meeting was conducted on January 23rd and an NTP was issued February 3rd. Contractor has installed new gate controllers, installed fiber backbone, and has prepared the servers. The contractor is replacing door controllers and switching over to new system."
        },
        {
            "id": "p71.7",
            "order": 7,
            "type": "heading",
            "bbox": {
                "l": 65.52,
                "t": 379.44,
                "r": 202.56,
                "b": 366.72
            },
            "text": "➢ Wayfinding Sign Project",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p71.8",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 73.44,
                "t": 367.2,
                "r": 578.4,
                "b": 291.84
            },
            "text": "The Wayfinding Sign project will replace and upgrade the signage around Airport Circle, along with the Bradenton Connector, General Spaatz Boulevard, Rental Car Road, Air Cargo Avenue, Air Cargo Road, and Old Bradenton Road. Signs will be upgraded to include latest international symbols, and their format will be similar to the new signage recently installed in the Gateway Entrance Project. Final design drawings have been received. Project has been advertised and staff anticipates bringing the low responsible bidder to the January Board meeting."
        },
        {
            "id": "p71.9",
            "order": 9,
            "type": "heading",
            "bbox": {
                "l": 66.48,
                "t": 280.56,
                "r": 227.76,
                "b": 268.56
            },
            "text": "Blast Fence Deflector Project",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p71.10",
            "order": 10,
            "type": "text",
            "bbox": {
                "l": 81.36,
                "t": 268.32,
                "r": 578.64,
                "b": 205.68
            },
            "text": "The Blast Deflector project will design and permit a blast fence near the ground transportation area. Michael Baker International was ranked first at the August 2019 Board meeting. Staff negotiated scope and fee and brought a contract for approval to the September 2019 board meeting. Michael Baker has completed final design plans; and the project has been advertised. Bids were opened on July 1, 2020 and eight bids were received. Project is temporarily on hold due to COVID-19."
        },
        {
            "id": "p71.11",
            "order": 11,
            "type": "heading",
            "bbox": {
                "l": 66.48,
                "t": 194.64,
                "r": 234,
                "b": 182.64
            },
            "text": "[p71.11.1] Rental Car Office Renovations",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "children": [
                {
                    "id": "p71.11.1",
                    "order": 12,
                    "type": "text",
                    "bbox": {
                        "l": 66.48,
                        "t": 194.64,
                        "r": 234,
                        "b": 182.64
                    },
                    "text": "→",
                    "attrs": {
                        "inline": true,
                        "text_offset": 0,
                        "text_span": 10,
                        "bbox_estimated": true
                    }
                }
            ],
            "level": 3
        },
        {
            "id": "p71.12",
            "order": 13,
            "type": "text",
            "bbox": {
                "l": 78.72,
                "t": 182.16,
                "r": 579.12,
                "b": 94.8
            },
            "text": "An RFQ was advertised to solicit design professionals to renovate the rental car offices in the baggage wing of the Terminal. Key elements will include modifying counter to meet ADA requirements, refinishing walls, ceilings, and flooring, replacing HVAC system, signing, and installing kiosks terminals. Staff selected Sweet Sparkman at the January Board meeting, and staff negotiated a scope and fee, and brought their contract to the March Board meeting for approval. Staff conducted a design kick-off meeting with stakeholders. SSA has prepared two concepts for office layout, the Rental Car companies have selected their preference. SSA is preparing 60-percent drawings."
        },
        {
            "id": "p71.13",
            "order": 14,
            "type": "footer",
            "bbox": {
                "l": 484.08,
                "t": 53.28,
                "r": 542.64,
                "b": 40.8
            },
            "text": "Page 2 of 4",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}