            "text": "AGENDA ITEM NO. 8G",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p70.2",
            "order": 2,
            "type": "heading",
            "bbox": {
                "l": 159.6,
                "t": 724.32,
                "r": 428.16,
                "b": 686.88
            },
            "text": "SARASOTA MANATEE AIRPORT AUTHORITY\nENGINEERING, PLANNING & FACILITIES ACTIVITY REPORT\nNovember 17, 2020",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p70.3",
            "order": 3,
            "type": "heading",
            "bbox": {
                "l": 47.28,
                "t": 676.32,
                "r": 116.88,
                "b": 664.56
            },
            "text": "ENGINEERING",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p70.4",
            "order": 4,
            "type": "heading",
            "bbox": {
                "l": 63.84,
                "t": 662.88,
                "r": 391.2,
                "b": 651.36
            },
            "text": "Master Drainage Plan (MDP)/Stormwater System Improvements",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p70.5",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 71.76,
                "t": 650.64,
                "r": 576.96,
                "b": 563.52
            },
            "text": "The MDP evaluated the Airport's drainage system and determined a master system that would allow for 90+ acres of development, while reducing ponds and other wildlife hazards. The Stormwater System Improvements project was bid in April 2019 and a low responsive bidder was approved by the Authority. A preconstruction meeting was conducted on October 23rd and the contractor mobilized to the site in February to begin. Contractor is actively working on Phase 4 (near the Shade Lot) and is nearing completion of all phases of the project. Project is ahead of schedule, and contractor anticipates substantial completion at the end of November."
        },
        {
            "id": "p70.6",
            "order": 6,
            "type": "heading",
            "bbox": {
                "l": 63.84,
                "t": 552.48,
                "r": 300,
                "b": 540
            },
            "text": "Terminal Renovation & Upgrades (Phase 7.2)",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p70.7",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 70.56,
                "t": 539.28,
                "r": 576.48,
                "b": 428.16
            },
            "text": "An RFQ was advertised to select an architectural and engineering firm to develop plans and specifications for upgrades and renovations to the Terminal. The upgrades and renovations will include the police department, the new Board room, 3rd floor administration offices, observation deck, and the badging offices. The Board selected Sweet Sparkman Architects. Phase 7.1 construction is nearing completion, and the scope for the second phase (includes renovation of the third floor, observation deck, glass block replacement, and other terminal upgrades) has begun. Sweet Sparkman has completed preliminary design, finishes have been selected, and 60-percent architectural drawings have been submitted. The project was suspended and is now being restarted. Final design should be completed in early CY 2021."
        },
        {
            "id": "p70.8",
            "order": 8,
            "type": "heading",
            "bbox": {
                "l": 63.6,
                "t": 417.36,
                "r": 206.16,
                "b": 405.6
            },
            "text": "ARFF Station Renovations",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p70.9",
            "order": 9,
            "type": "text",
            "bbox": {
                "l": 78.72,
                "t": 404.4,
                "r": 576.24,
                "b": 367.68
            },
            "text": "A November 18, 2019 Notice-to-Proceed was given to the Contractor. The project is \"substantial complete\" and is being closed out. Contractor is working on warranty items including doors and ring down line."
        },
        {
            "id": "p70.10",
            "order": 10,
            "type": "heading",
            "bbox": {
                "l": 63.84,
                "t": 355.68,
                "r": 228.48,
                "b": 343.92
            },
            "text": "SRQ Parking Lot Modifications",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p70.11",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 67.44,
                "t": 342.72,
                "r": 576.48,
                "b": 219.36
            },
            "text": "This project was designed to expand the Long-term Parking Lot, Shade Lot, Facilities Lot, and make modifications at the curbside for valet dropoff. Design drawings were completed and the project was bid. Bids were opened on March 6th, 2020 and Staff brought the low responsive bid to the March, 23rd Board meeting for Authority approval. A supplemental agreement was prepared to reduce the scope of work to milling and overlaying the existing parking facility, modifying the curbside for the valet dropoff, and expanding the Facilities Parking Lot. The contractor is complete with the mill and overlay of the existing parking facility, and is substantially complete with the valet and the expansion of the Facilities Parking Lot. Staff has re-advertised the expansion portion to the long-term and overflow lot due to recent increase in airline traffic. Staff anticipates bringing low-responsive bidder to the January Board meeting."
        },
        {
            "id": "p70.12",
            "order": 12,
            "type": "heading",
            "bbox": {
                "l": 64.32,
                "t": 208.32,
                "r": 184.08,
                "b": 196.08
            },
            "text": "→ Fuel Farm Expansion",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p70.13",
            "order": 13,
            "type": "text",
            "bbox": {
                "l": 64.8,
                "t": 195.36,
                "r": 576,
                "b": 120
            },
            "text": "This project was designed to expand the existing fuel farm up to an additional 306,000 GAL. The design was completed and permit applications were submitted. The project was advertised for bidding and bids were opened on March 11, 2020. Staff brought the low responsive bidder to the March 2020 Board meeting for Authority approval. The Board has executed a contract to construct two of three storage tanks, for additional 204,000 GAL's of storage. The contractor has received County Land Development permit and the Building permit and has begun construction."
        },
        {
            "id": "p70.14",
            "order": 14,
            "type": "footer",
            "bbox": {
                "l": 480,
                "t": 50.16,
                "r": 538.32,
                "b": 38.4
            },
            "text": "Page 1 of 4",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}