{
    "document_id": 10376,
    "page": 148,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10488,
    "item_count": 14,
    "counts_by_type": {
        "footer": 1,
        "header": 1,
        "text": 12
    },
    "build_ms": 5,
    "items": [
        {
            "id": "p148.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 195.36,
                "t": 773.52,
                "r": 415.68,
                "b": 762.48
            },
            "text": "November 22, 2021 Board Meeting - Department Reports",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p148.2",
            "order": 2,
            "type": "text",
            "bbox": {
                "l": 85.68,
                "t": 717.12,
                "r": 526.56,
                "b": 670.56
            },
            "text": "Concessions: Redevelopment of retail, food and beverage concessions throughout the Terminal/Concourse, strategy, and plan to expand/redevelop is in process. This project will be a phased project over the next four years once implemented. A presentation regarding concessions redevelopment is planned for a future Board meeting."
        },
        {
            "id": "p148.3",
            "order": 3,
            "type": "text",
            "bbox": {
                "l": 85.92,
                "t": 666,
                "r": 527.04,
                "b": 608.4
            },
            "text": "In the interim, a concession add is contemplated and in planning stages. Properties has requested presentations from the existing concessions operators as to adding an island bar/limited food concession at the north end of the concourse, the responses from concessionaires are scheduled for December. Properties will review the responses to determine the viability and how to proceed from there."
        },
        {
            "id": "p148.4",
            "order": 4,
            "type": "text",
            "bbox": {
                "l": 86.16,
                "t": 603.6,
                "r": 526.32,
                "b": 579.84
            },
            "text": "Mitchell Management of Florida, Inc.: The Jimmy Johns franchisee (Tenant) is in design/permitting and is anticipating opening in the first quarter of 2022."
        },
        {
            "id": "p148.5",
            "order": 5,
            "type": "text",
            "bbox": {
                "l": 86.16,
                "t": 574.8,
                "r": 526.32,
                "b": 528.72
            },
            "text": "Property #10/M-lot: Construction is underway for both MTC sitework and the maintenance hangar. The MTC Ground Lease with Improvements is out for review by the tenant however, MTC progress as to lease and approvals has been significantly delayed due to COVID related funding shortages."
        },
        {
            "id": "p148.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 85.92,
                "t": 523.44,
                "r": 526.56,
                "b": 477.12
            },
            "text": "The maintenance hangar is under construction and the former (Agape) hangar is under extensive remodel. Projected completion of both hangars, first quarter of 2022. Properties is negotiating with an MRO for the maintenance hangar and a flight school for the former Agape hangar, both agreements are anticipated to be ready for Board consideration in first quarter of 2022."
        },
        {
            "id": "p148.7",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 86.4,
                "t": 472.56,
                "r": 526.8,
                "b": 426
            },
            "text": "Property #2/Tallevast: Properties continues discussions/negotiations with Industrial development groups as to a joint development of this property. However, interest from additional and multiple developers has surfaced and Properties is now considering an RFP to developers for the development of this property."
        },
        {
            "id": "p148.8",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 85.68,
                "t": 420.96,
                "r": 527.28,
                "b": 328.8
            },
            "text": "Parking: Parking demand increased dramatically and continues. The former Avis lot (which the Authority was utilizing for RV/boat/vehicle storage) has been vacated for use as additional overflow parking. Entrance and exits, revenue controls machines/arms and other paving related improvements are underway to prepare this lot for the season. The TNC staging which has been relocated to a lot leased to New College just west of the Ground Transportation area. Properties also completed a use agreement with the hotel tenant of the airport for the vacant pad, again for overflow parking needs of parking. Several other properties are under consideration to increase parking capacity to meet the high demand."
        },
        {
            "id": "p148.9",
            "order": 9,
            "type": "text",
            "bbox": {
                "l": 85.92,
                "t": 318.48,
                "r": 527.04,
                "b": 237.84
            },
            "text": "FBO Expansion: Additional hangars are contemplated at Dolphin and permits obtained but no construction start date has been provided to the Authority. Ross Aviation is proposing an expansion of hangars within the N Quad area. Ross has submitted concept plans and discussions are underway regarding phasing/construction. Two FBO operators have expressed strong interest in adding an FBO facility/services at SRQ. Properties sent the interested FBOs an invitation to RFP to respond and submit. It is anticipated that Properties will receive the responses, review each and submit to the Board for consideration within the first quarter 2022."
        },
        {
            "id": "p148.10",
            "order": 10,
            "type": "text",
            "bbox": {
                "l": 85.92,
                "t": 227.28,
                "r": 526.8,
                "b": 192.24
            },
            "text": "Turo: Properties is in negotiations with Turo regarding a peer-to-peer car service agreement to legally operate at the airport. It is anticipated that an agreement will be reached by the first quarter of 2022 and collection of fees will commence at that time."
        },
        {
            "id": "p148.11",
            "order": 11,
            "type": "text",
            "bbox": {
                "l": 86.16,
                "t": 181.92,
                "r": 526.56,
                "b": 158.16
            },
            "text": "Southern Light, LLC: An agreement with Southern Light, LLC telecommunications company has been completed for a small lot/facility at the Airport. Design and permitting in process."
        },
        {
            "id": "p148.12",
            "order": 12,
            "type": "text",
            "bbox": {
                "l": 85.92,
                "t": 147.36,
                "r": 526.8,
                "b": 101.28
            },
            "text": "Market Rent Analysis: A Market Rent Analysis has recently been completed for Airport future development properties. This analysis will assist Properties in determining market rates of the numerous projects currently underway and as well as in the future. Hangar rent analysis is now underway for the hangars which the airport has or will have for lease next year."
        },
        {
            "id": "p148.13",
            "order": 13,
            "type": "text",
            "bbox": {
                "l": 302.88,
                "t": 82.08,
                "r": 311.04,
                "b": 72.48
            },
            "text": "2",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p148.14",
            "order": 14,
            "type": "footer",
            "bbox": {
                "l": 298.56,
                "t": 25.44,
                "r": 314.16,
                "b": 16.32
            },
            "text": "148",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}