{
    "document_id": 10376,
    "page": 116,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10488,
    "item_count": 26,
    "counts_by_type": {
        "figure": 2,
        "footer": 2,
        "header": 3,
        "heading": 3,
        "list": 2,
        "list_item": 10,
        "text": 4
    },
    "build_ms": 3,
    "items": [
        {
            "id": "p116.1",
            "order": 1,
            "type": "header",
            "bbox": {
                "l": 140.64,
                "t": 774,
                "r": 469.92,
                "b": 762.48
            },
            "text": "November 22, 2021 Board Meeting - Items Needing Action - Over $325,000 Threshold",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p116.2",
            "order": 2,
            "type": "figure",
            "bbox": {
                "l": 78.48,
                "t": 708,
                "r": 106.56,
                "b": 679.68
            },
            "text": "",
            "attrs": {
                "role": "page_header",
                "block_label": "header_image"
            }
        },
        {
            "id": "p116.3",
            "order": 3,
            "type": "header",
            "bbox": {
                "l": 272.4,
                "t": 693.6,
                "r": 333.36,
                "b": 682.56
            },
            "text": "SCOPE DETAIL",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p116.4",
            "order": 4,
            "type": "header",
            "bbox": {
                "l": 459.6,
                "t": 692.16,
                "r": 527.52,
                "b": 672.72
            },
            "text": "Scope of Services\nNovember 9, 2021",
            "attrs": {
                "block_label": "header"
            },
            "level": 2
        },
        {
            "id": "p116.5",
            "order": 5,
            "type": "figure",
            "bbox": {
                "l": 22.2302,
                "t": 764.3055,
                "r": 591.6307,
                "b": 27.4343
            },
            "text": "",
            "attrs": {
                "source": "pdf_image"
            }
        },
        {
            "id": "p116.6",
            "order": 6,
            "type": "text",
            "bbox": {
                "l": 77.76,
                "t": 654,
                "r": 379.44,
                "b": 642
            },
            "text": "PROJECT SCOPE OF SERVICES – Scope Detail (ARORA – SPECIAL SYSTEMS)"
        },
        {
            "id": "p116.7",
            "order": 7,
            "type": "text",
            "bbox": {
                "l": 78.24,
                "t": 625.92,
                "r": 522.72,
                "b": 584.88
            },
            "text": "These Scope Details define the level of service and the processes involved, and describe the characteristics of the deliverables the consultant will produce while engaging in the tasks and Elements of Work listed in the Scope Outline above."
        },
        {
            "id": "p116.8",
            "order": 8,
            "type": "text",
            "bbox": {
                "l": 78.24,
                "t": 569.76,
                "r": 522.96,
                "b": 504.72
            },
            "text": "Schematic Design Documents – Schematic Design will be based on the approved layout/concept from the previous phase of work (Conceptual Programming & Layout). The objective will be to provide design studies and prepare presentation materials for each major component of the building development and to further establish the overall scope of the project by refining the program requirements to allow for preliminary budget confirmation by the Construction Manager for SRO approval. This phase will begin with the BIM model setup, development, and coordination between disciplines."
        },
        {
            "id": "p116.9",
            "order": 9,
            "type": "heading",
            "bbox": {
                "l": 110.88,
                "t": 502.8,
                "r": 223.92,
                "b": 492
            },
            "text": "1. Special Systems (ARORA)",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p116.10",
            "order": 10,
            "type": "heading",
            "bbox": {
                "l": 143.76,
                "t": 489.84,
                "r": 240.72,
                "b": 480
            },
            "text": "a. Telecommunications:",
            "level": 3
        },
        {
            "id": "p116.11",
            "order": 11,
            "type": "list",
            "bbox": {
                "l": 174.48,
                "t": 478.8,
                "r": 516.48,
                "b": 311.52
            },
            "text": "",
            "attrs": {
                "item_count": 5
            },
            "children": [
                {
                    "id": "p116.11.1",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 178.08,
                        "t": 478.8,
                        "r": 516.48,
                        "b": 443.52
                    },
                    "text": "Provide updated analysis of the building systems that require data transmission and how they will impact network performance. Identify transmission media and general routes for redundancy. Identify any individual cabling systems for owner vs. tenant etc...",
                    "marker": "i."
                },
                {
                    "id": "p116.11.2",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 176.4,
                        "t": 442.32,
                        "r": 514.32,
                        "b": 407.76
                    },
                    "text": "Perform a wireless spectrum analysis and provide solution identifying the need for a Wi-Fi and/or Distributed Antenna System. Provide approximate quantities and topology based spectrum analysis findings (Task 2 only).",
                    "marker": "ii."
                },
                {
                    "id": "p116.11.3",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 174.48,
                        "t": 406.8,
                        "r": 512.88,
                        "b": 359.28
                    },
                    "text": "Define a network security schema to protect/separate the individual systems behind the IDS/IPS. Identify equipment list for EF/ER/TR's. Include quantities and BOD for equipment cabinets/racks, cable trays and topology (Centralized, Top of Rack, End of Row), and other typical Telecommunication Space requirements (Task 2 only).",
                    "marker": "ii."
                },
                {
                    "id": "p116.11.4",
                    "order": 15,
                    "type": "list_item",
                    "bbox": {
                        "l": 174.72,
                        "t": 358.32,
                        "r": 512.64,
                        "b": 335.52
                    },
                    "text": "Work with the Electrical Designer to determine equipment loads for UPS and Generator requirements, Grounding and Bonding design and Power Distribution for devices.",
                    "marker": "iv."
                },
                {
                    "id": "p116.11.5",
                    "order": 16,
                    "type": "list_item",
                    "bbox": {
                        "l": 176.88,
                        "t": 334.08,
                        "r": 499.44,
                        "b": 311.52
                    },
                    "text": "Work with the Mechanical Designer to determine heat loads for telecommunication spaces.",
                    "marker": "v."
                }
            ]
        },
        {
            "id": "p116.12",
            "order": 17,
            "type": "heading",
            "bbox": {
                "l": 143.52,
                "t": 309.84,
                "r": 195.6,
                "b": 299.76
            },
            "text": "b. Security:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p116.13",
            "order": 18,
            "type": "list",
            "bbox": {
                "l": 175.2,
                "t": 298.08,
                "r": 516.72,
                "b": 143.04
            },
            "text": "",
            "attrs": {
                "item_count": 5
            },
            "children": [
                {
                    "id": "p116.13.1",
                    "order": 19,
                    "type": "list_item",
                    "bbox": {
                        "l": 178.56,
                        "t": 298.08,
                        "r": 495.36,
                        "b": 275.76
                    },
                    "text": "Provide CCTV device distribution plan based on asset identification and the owners security plan.",
                    "marker": "i."
                },
                {
                    "id": "p116.13.2",
                    "order": 20,
                    "type": "list_item",
                    "bbox": {
                        "l": 176.88,
                        "t": 274.32,
                        "r": 516.72,
                        "b": 227.52
                    },
                    "text": "Provide BOD for CCTV system, identifying critical network equipment. Identify if it will be integrated with an existing system and the requirements for integration. Determine basis for data transmission, camera parameters, and storage requirements. Provide an equipment list for a Command Center or viewing station(s).",
                    "marker": "ii."
                },
                {
                    "id": "p116.13.3",
                    "order": 21,
                    "type": "list_item",
                    "bbox": {
                        "l": 175.2,
                        "t": 225.84,
                        "r": 494.4,
                        "b": 203.04
                    },
                    "text": "Identify points of vulnerability where electronic access control should be provided. Identify points of integration for camera call ups with CCTV system.",
                    "marker": "iii."
                },
                {
                    "id": "p116.13.4",
                    "order": 22,
                    "type": "list_item",
                    "bbox": {
                        "l": 175.68,
                        "t": 201.84,
                        "r": 503.04,
                        "b": 178.8
                    },
                    "text": "Identify if ACS is the extension of an existing system. Provide system BOD, including a high-level sequence of operation for each type of access-controlled door.",
                    "marker": "iv."
                },
                {
                    "id": "p116.13.5",
                    "order": 23,
                    "type": "list_item",
                    "bbox": {
                        "l": 177.12,
                        "t": 177.36,
                        "r": 500.16,
                        "b": 143.04
                    },
                    "text": "Provide monitoring points for an intrusion detection system and integration requirements to other on or off premises systems. Identify monitoring and response procedures.",
                    "marker": "v."
                }
            ]
        },
        {
            "id": "p116.14",
            "order": 24,
            "type": "text",
            "bbox": {
                "l": 488.16,
                "t": 86.4,
                "r": 523.92,
                "b": 76.32
            },
            "text": "Page | 39",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p116.15",
            "order": 25,
            "type": "footer",
            "bbox": {
                "l": 79.92,
                "t": 114,
                "r": 143.28,
                "b": 83.76
            },
            "text": "Gresham Smith",
            "attrs": {
                "block_label": "footer"
            }
        },
        {
            "id": "p116.16",
            "order": 26,
            "type": "footer",
            "bbox": {
                "l": 298.56,
                "t": 25.68,
                "r": 314.4,
                "b": 16.08
            },
            "text": "116",
            "attrs": {
                "block_label": "number"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}