{
    "document_id": 10369,
    "page": 50,
    "width_pt": 612,
    "height_pt": 792,
    "rotation": 0,
    "pipeline_version": "paddleocr-vl-1.6+paul-48",
    "engine": "paddleocr_vl",
    "source_run_id": 10481,
    "item_count": 21,
    "counts_by_type": {
        "footer": 1,
        "heading": 3,
        "list": 2,
        "list_item": 11,
        "text": 4
    },
    "build_ms": 1,
    "items": [
        {
            "id": "p50.1",
            "order": 1,
            "type": "text",
            "bbox": {
                "l": 84,
                "t": 699.84,
                "r": 450.96,
                "b": 621.84
            },
            "text": "C301 – Geometry Plan:\n1. Added curb skirts at the long-term parking spaces.\nC302 – Geometry Plan:\n1. Removed two ADA ramps at the west end of the existing long-term lot (sidewalk).\nC401A – Grading and Drainage Plan:\n1. Modified typical shelter section A-A"
        },
        {
            "id": "p50.2",
            "order": 2,
            "type": "heading",
            "bbox": {
                "l": 66.96,
                "t": 608.16,
                "r": 155.28,
                "b": 594.72
            },
            "text": "Specifications:",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p50.3",
            "order": 3,
            "type": "list",
            "bbox": {
                "l": 81.6,
                "t": 593.52,
                "r": 472.56,
                "b": 567.12
            },
            "text": "",
            "attrs": {
                "item_count": 2
            },
            "children": [
                {
                    "id": "p50.3.1",
                    "order": 4,
                    "type": "list_item",
                    "bbox": {
                        "l": 81.6,
                        "t": 593.52,
                        "r": 472.56,
                        "b": 580.32
                    },
                    "text": "FDOT 327 Milling of existing asphalt",
                    "marker": "•",
                    "attrs": {
                        "bbox_estimated": true
                    }
                },
                {
                    "id": "p50.3.2",
                    "order": 5,
                    "type": "list_item",
                    "bbox": {
                        "l": 81.6,
                        "t": 580.32,
                        "r": 472.56,
                        "b": 567.12
                    },
                    "text": "FDOT 948 Optional drainage products.",
                    "marker": "•",
                    "attrs": {
                        "bbox_estimated": true
                    }
                }
            ]
        },
        {
            "id": "p50.4",
            "order": 6,
            "type": "heading",
            "bbox": {
                "l": 66.72,
                "t": 552.72,
                "r": 295.68,
                "b": 539.04
            },
            "text": "Schedule of Quantities - Existing Items",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p50.5",
            "order": 7,
            "type": "list",
            "bbox": {
                "l": 81.12,
                "t": 536.88,
                "r": 533.28,
                "b": 187.2
            },
            "text": "",
            "attrs": {
                "item_count": 9
            },
            "children": [
                {
                    "id": "p50.5.1",
                    "order": 8,
                    "type": "list_item",
                    "bbox": {
                        "l": 81.12,
                        "t": 536.88,
                        "r": 525.36,
                        "b": 511.2
                    },
                    "text": "ItemC-9 Clearing and grubbing: $1,850.00\nIncreased from 2.6 ACRE to 2.8 ACRE."
                },
                {
                    "id": "p50.5.2",
                    "order": 9,
                    "type": "list_item",
                    "bbox": {
                        "l": 83.04,
                        "t": 499.68,
                        "r": 521.04,
                        "b": 472.08
                    },
                    "text": "Item C-12 Demolish trees:\nIncreased from 63 EA to 77 EA."
                },
                {
                    "id": "p50.5.3",
                    "order": 10,
                    "type": "list_item",
                    "bbox": {
                        "l": 83.04,
                        "t": 460.56,
                        "r": 519.12,
                        "b": 433.68
                    },
                    "text": "Item C-16 Demolish curb: $1,100.00 Increased from 4400 LF to 4510 LF."
                },
                {
                    "id": "p50.5.4",
                    "order": 11,
                    "type": "list_item",
                    "bbox": {
                        "l": 83.04,
                        "t": 421.2,
                        "r": 521.04,
                        "b": 394.56
                    },
                    "text": "Item C-21 Demolish Asphalt Pavement and base course: $2,250.00 Increased from 7,300 SY to 7,425 SY."
                },
                {
                    "id": "p50.5.5",
                    "order": 12,
                    "type": "list_item",
                    "bbox": {
                        "l": 82.32,
                        "t": 382.56,
                        "r": 519.36,
                        "b": 355.68
                    },
                    "text": "Item C-24 12\" Type B stabilization LBR 40: $ 950.00 Increased from 15,000 SY to 15,055 SY.",
                    "marker": "-"
                },
                {
                    "id": "p50.5.6",
                    "order": 13,
                    "type": "list_item",
                    "bbox": {
                        "l": 82.56,
                        "t": 343.44,
                        "r": 526.56,
                        "b": 316.56
                    },
                    "text": "Item C-25 FDOT optional base group 4: $1,235.00 Increased from 14,000 SY to 14,055 SY.",
                    "marker": "-"
                },
                {
                    "id": "p50.5.7",
                    "order": 14,
                    "type": "list_item",
                    "bbox": {
                        "l": 81.84,
                        "t": 304.32,
                        "r": 528.96,
                        "b": 278.16
                    },
                    "text": "Item C-26 Superpave Asphaltic concrete: $3,000.00\nIncreased from 19,000 TON to 19,015 TON."
                },
                {
                    "id": "p50.5.8",
                    "order": 15,
                    "type": "list_item",
                    "bbox": {
                        "l": 82.32,
                        "t": 265.2,
                        "r": 530.64,
                        "b": 238.8
                    },
                    "text": "Item C-27 Concrete curb, Type D: $1,020.00\nIncreased from 2500 LF to 2840 LF. curb prep"
                },
                {
                    "id": "p50.5.9",
                    "order": 16,
                    "type": "list_item",
                    "bbox": {
                        "l": 82.8,
                        "t": 226.08,
                        "r": 533.28,
                        "b": 187.2
                    },
                    "text": "Item C-29 Concrete Sidewalk and Driveways:\nAdded 68 SY for curb skirts\nSkirt grading, compacting and clean up after poured\nDeleted 18 SY for two ADA sidewalk ramps\n$3,750.00",
                    "marker": "-"
                }
            ]
        },
        {
            "id": "p50.6",
            "order": 17,
            "type": "heading",
            "bbox": {
                "l": 67.44,
                "t": 160.08,
                "r": 522.24,
                "b": 145.92
            },
            "text": "Schedule of Quantities - New Items",
            "attrs": {
                "block_label": "paragraph_title"
            },
            "level": 3
        },
        {
            "id": "p50.7",
            "order": 18,
            "type": "text",
            "bbox": {
                "l": 77.76,
                "t": 144.72,
                "r": 545.04,
                "b": 119.52
            },
            "text": "Item C-46 Adjust/ Raise/ Modify Manhole:\n1 EA.\n$1,430.00"
        },
        {
            "id": "p50.8",
            "order": 19,
            "type": "text",
            "bbox": {
                "l": 80.64,
                "t": 107.28,
                "r": 545.28,
                "b": 80.88
            },
            "text": "Item C-47 1\" Asphalt milling:\n24 SY $1,250.00"
        },
        {
            "id": "p50.9",
            "order": 20,
            "type": "text",
            "bbox": {
                "l": 488.4,
                "t": 59.52,
                "r": 533.76,
                "b": 48.48
            },
            "text": "Page 2 of 3",
            "attrs": {
                "block_label": "number"
            }
        },
        {
            "id": "p50.10",
            "order": 21,
            "type": "footer",
            "bbox": {
                "l": 66.72,
                "t": 66,
                "r": 99.12,
                "b": 42.48
            },
            "text": "",
            "attrs": {
                "block_label": "footer_image"
            }
        }
    ],
    "excluded_furniture": {
        "first": [],
        "last": []
    }
}